Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via ocr-fallback

GAZETTE NOTICE NO. 1528

GAZETTE NOTICE NO. 1528

THE PHYSICAL PLANNING ACT

(Cap. 286)

COMPLETION OF DEVELOPMENT PLAN


NOTICE is given that the above-mentioned development plan was on 10th February, 2015, completed. The development plan relates to land situated within Embu Town, Embu County. Copies of the part development plan have been deposited for public inspection at the office of the County Physical Planning Officer, and at the County Hall. The copies so deposited are available for inspection free of charge by all persons interested at the offices of the County Physical Planning Officer, and at the County Hall, between the hours of 8.00 a.m. to 5.00 p.m. Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 36— 60100, Embu, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. D. K. MMBAI, MR/6992628 for Director of Physical Planning. 6th March, 2015 GAZETTE NOTICE NO. /331 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED SAFARICOM STAFF PENSION SACHEME MIXED USE DEVELOPMENT ON L.R. NO. 337/974, MAVOKO, MACHAKOS COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The Proponent (Safaricom Staff Pension Scheme) is proposing to put up a Mixed Use Development on a 25.5 acre parcel of land, LR No. 337/974 located in Mavoko, Machakos County along Mombasa Road. The proposed development will consist of a retail centre (mall), 113 units of 4 bedroom town houses, 157 units of 3 bedroom town houses, community centre, kindergarten, recreation facilities, 15m wide tree lined boulevard, 9m wide road, 3m wide jogging track, waste water treatment plant, main entrance/ exit, emergency exits, green court and parking areas. The following are the anticipated impacts and proposed mitigation measures: Environmental and Social impacts Mitigation measure Loss of biodiversity e = -Maintain a riparian buffer zone as per WRMA recommendation. e -Clearance of vegetation should be done in necessary areas only. e = -Carry out environmental compensation where harm cannot be avoided by planting of indigenous plants. Soil Degradation e = -Use of gravel bags to trap sediment. e = -Rocked construction entrance and exit to keep sediment from being tracked onto adjacent roads and keep vehicles off bare soils. e -Stock piles to be covered with tarpaulin. e -Excavated soil to be used for back filling. e —_-Top soil to be used for landscaping. e -Limit the use of heavy machinery at the site & control earth works. Air pollution e -Spray water on exposed areas during dry weather to suppress dust. e = -Cover loads of friable materials during transportation. e -Buildings under construction to be covered with adequate screens to contain dust. e -Stock piles to be covered with tarpaulins. e -Control speed of construction vehicles and switch off machines when not in use. e =6©-Regularly service and maintain vehicles and mobile plants and machinery. e -Provide PPE e.g. nose masks to workers. Increased water demands e _ -Installation of flush toilets with low Effluent management River degradation River flooding Excess noise and vibrations Traffic snarl ups volume cisterns and high pressure. -Waste water recycling and rain water harvesting. -Provision of portable toilets for the workers. -Routine checkups and monitoring of the WWTP to avoid leakages and blockages. -Proper construction of the WWTP to meet the standards required by Mavoko Municipal Council. -Construction of separate storm water and waste water drains. -Treated effluent to be reused as non potable water for flushing _ toilets, watering lawns and cleaning purposes. -Waste water to be treated to the standards set by NEMA (Water quality regulations, 2006) and effluent analysis to be conducted quarterly. -Maintain a riparian buffer zone along the River as per WRMA recommendations. -No development activity shall be undertaken within the full width of the river or within the riparian reserve as per Water Quality Regulations 2006- Routine check-ups and monitoring of the WWTP to avoid leakage and blockage. Plant environmentally friendly trees on the riparian reserve to increase interception and storage while reducing surface run off. Liaise with WRMA weigh the option of constructing a levee which can confine the flow. - Liaise with WRMA to decommission the weir that is obstructing the smooth running of the river water on the site frontage as it does not serve any purpose. -Workers working with machinery, vehicles and instruments that emit high levels of noise should be provided with ear plugs and ear muffs. -Proper servicing of machinery & equipment(oiling, greasing etc). -Installation of portable barriers to shield compressors and other small stationary equipment where necessary. -Construction activities to be carried out between 8:00 a.m. to 5.00 p.m. -Monitor noise levels as per NEMA guidelines. -Proponent to engage KeNHA in developing access to the development which will be compatible with the upcoming dual carriageway from Athi river interchange to Machakos junction. -A traffic marshal to be stationed along the entry point within the project boundary to control vehicles during transportation of materials. -Planned deliveries to make sure they do not coincide with heavy traffic. -Provision of separate traffic routes for pedestrians and vehicles during operation phase. -Security checks to be conducted inside the compound NOT at the entrance. e —_-Provision of designated entry and exit points. Increase in Solid Wastes e -Limit quantity by developing appropriate budgets for purchase of raw materials to reduce wastage through exposure to weather elements. e = -Provision of a waste transfer station within the development. e = -Segregation of waste at source through provision of separate bins. e -Contract a duly licensed waste handler to transport waste. e -Sludge from the WWTP to be incinerated by a licensed incineration company. Occupational Health and ¢ Safety -Personnel to wear complete PPE. e _-Provision of fire fighting equipment. LEAKEY’S STORAGE LIMITED DISPOSAL OF UNCOLLECTED GOODS NOTICE is issued pursuant to the Provisions of the Disposal of Uncollected Goods Act (Cap. 38) of the laws of Kenya, to the owners of the following motor vehicles/goods to take delivery of the said motor vehicles/goods from the premises of Leakey’s Storage Limited, Lunga Lunga Road, Industrial Area, Nairobi, within thirty (30) days from the date of publication of this notice upon payment of all outstanding storage charges including the cost of publishing this notice, failure to which the said motor vehicles/goods will be sold either by public auction or private treaty and the proceeds of the sale shall be defrayed against any accrued storage charges and the balance, if any, shall remain at the owners credit, but should there be a shortfall, the owner shall be liable thereof. Motor Vehicles: KPN 893, Peugeot KAE 656Y, Subaru 4WD KAB 117Z, Isuzu Matatu KAR 386R, Subaru Legacy e -Put in place an emergency response plan. e -Only qualified personnel to operate the machinery. e = -Designate a Health & Safety officer to be in-charge of enforcing _ site compliance with OSH trules & regulations. e =-Provision of adequately stocked first aid kit and at least one trained first aider on site. KAJ 184S, Daihatsu KAD 559X, Nissan Sunny KYX 364, Toyota Carina KAT 959A, Subaru Legacy KAD 815G, Nissan Sunny KAH 524J, Daewoo Cielo KAT 614C, Z Touring KUT 407, Datsun Pick Up KAM 433S, Mercedes Lorry KXV 156, Peugeot SOSGL KAW 627Q, Toyota Corolla 20CD6K, Mitsubishi Pajero KAM 445K, Nissan Sunny KWQ 072, Isuzu Matatu KAS 944 P, Mitsubishi Gallant KAB 614T, Mercedes Benz KAS 490Z, Volvo P/Mover KAU 546U, Renault P/Mover KAJ 518B, Toyota Corolla KAS 030D, Scoda KBD 003T, Landrover KAW 655T, Subaru Forrester e -Display the contact numbers of the persons responsible for handling emergencies on the site. e -Contractor should have workmen’s compensation cover which should comply with workmen’s compensation Act. Population Increase e —_- Planning of the development in such a way that there is adequate social and other infrastructure to meet needs of the tenants and shoppers. Sanitation e -Provision of sufficient sanitary conveniences: hand washing stations, mobile toilets at work site. e -Provision of clean water to the workforce. HIV/AIDS e -Erection of billboards to sensitize locals on the need to practice safe sex to help in the fight against HIV/AIDS. e -Conduct awareness campaigns on HIV/AIDS among the workers and the locals. This can be undertaken by the various NGOs and _— government agencies in the county. e —_ -Provision of condoms to the workers. (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (6) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) County Director of Environment, Machakos County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. Z.O. OUMA, for Director-General, MR/6992656 National Environment Management Authority.

Dated the 6th March, 2015.

Z.O. OUMA,

for Director-General, National Environment Management Authority.

Extracted Entities (2)

previous_gazette_ref

1528

institution

Storage

Details

Act / Legislation
THE PHYSICAL PLANNING ACT
Reference
Cap. 286
Signed By
Z.O. OUMA
Title
for Director-General, National Environment Management Authority
Date Signed
6th March 2015
Page
24
Extraction Method
ocr-fallback