Back
ESTABLISHMENT 100% confidence via regex

GAZETTE NOTICE NO. 98

GAZETTE NOTICE NO. 98

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(Cap.53)

ESTABLISHMENT


PURSUANT to regulation 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Envronment Management Authority (NEMA) -has received an Envrronmental Impact Assessment Study Report for the above proposed prolect. The proponent (Northern Energy Limited) rs proposing to establish a biomass power plant to produce 2.5MW of electricity using Prosapis juliflora (SW) DC as a feedstock about I Km from Garissa Town towards Rrver Tana in Garissa County. The following are the anticipated impacts and proposed mitigation measures: Impacts Mitigation measures Vegetatron loss and Soil . erosion Soil disturbance by vehicle movements, digging of pits and scooping of Surface soil Ar pollution from moving vehicles Noise from machineries . and movement of Vehicles Vibrations on the ground . The developer will undertake grass lnd flower planting to avoid the soils being washed or carried by wind. Places of least vegetation cover will be identified and only construction points will be completely ctEarcd to ensure minirnm vegetative disturbance. Wherever possible vegetation within the biomass plant site should be prescrved and where plants must be uprooted they should be recycled into use as construction materials, fuewood or converted into soil manure. Plant and maintain flowers and ornamental tees along the paths end around the buildings. Movement of vehicles outside he designated areas to be minimized as much as possible. Alterations of soil surfac.€ should be avoided as much as possible. Spray water on paths used by vehicle to reduce dust. When possible vehicles should be used off 'the peak hours of people and livestock movement. Use vehicle and machineries and equipment that are of good mechanical condition. Ensure the machines used are adequatcly serviced. Noise level should be kept within acceptable limits as stipulated in EMCA (Noise and excessive vibrations pollution) Workers exposed to high noise should wear PPE e.g., ear plugs. Avoid using heavy equipment that causes vibrations on the ground. Use mechanisms (where applicable) to reduce transmission of vibrations to lhe ground. I 20th February, 2015 THE KENYA GAZETTE Dust Flooding Contamination of water resources Solid wastes during construction Liquid wastes during construction Sanitation Cultural conflicts betwecn locals and the - incoming workers Soil disturbance . Interference with visual aesthetics Emissron of hazardous materials loss of plant lifc and associated bio- communities There should be no vibrations at night when people and most of animals are asleep. Trucks to avoid driving off road and to spray water on the road during dry seasons to reduce dust. Drainage of surface water must be done to avoid water collecting on the surface. Drainage channels should lead the water to River Tana. Water collected from roof catchments and gutters will be treated control growth contaminant organisms. Storage tanks will be supplied to trap water and use it for irrigating planted vegetation. All solid waste must be collecrcd into waste bins and sorted out before taken to landfills. Wastes should be sortcd, re uscd, and recycled as much as possible. All wastes to be handled by qualified waster handlers and be disposcd in official designated areas. All liquid waste must be disposed to pits for evaporation. All wasrcs to be handled by qualitred waster handlers and be disposed in official designated areas. All workers must have acc€ss to toilets, hand washing stations at all times Mobile toilets if provided should serviced accordingly. The incoming workers of different cultural backgrounds should not intcrfere with the local culturcs. Incoming workers should be instructed to respect the local culoral values. The stnpped top soils from the site leveling and clearing will be used to build and strengthen the perimeter wall if needed. Care will bc taken not to interfere with the course of the seasonal strcams, by leaving clearance of at least 30m from the operations points. This is in keeping with the Legal Notice 120 - Water Quality Regulations 2006. AII hazardous materials generated and emitted from the plant must be. handled by a competent and licensed handler. - Emissions to be monitored on the types and amounts of gases being emitted to make sure they are within acceptable limits as per regulations. Although plant diversity is tow at the proposed site, the proponent will incorporate greater species diversity in their rehabilitation and landscaping progmrnmes. Services of knowledgeable cuator/botanist will be employed to implement thrs feature Close collaboration and assistance will be sought and built with the Kenya Forest Service and for supply of Increased surface runoff ' and soil erosion Air pollution from dust and engine exhaust gases Disposal of Waste into the Environment including solid wastes Fire hazards in the power . plant Dangers ofexposed live . electricity wires Health deterioration of facility workers Bodily injuries and accidents appropriate forbs seeds and establishing tree nurseries in the rehabilitation Programme. Will construct surface rainwater tap pits and cut-off drains to check occasional runoff. Roof catchment gutters connected to tanks will harvest excess rainwater in the site. The water would also be used for irrigating planted vegetation, outdoor cleaning such as of vehicles and toilet cleaning, thereby reducing demand on water supply. Prompt compaction of lbose soils and aggressive grass rcplantrng will be implemented. Water will be sprinkled onto the disturbed soil to reduce flying dust. Employees/ workers will be provided with personal protective equipment (PPE), to reduce possible dust and noxious gas inhalation. The construction site will be equipped with toilet and washing facilities fully connected to septic tanks. Enlisting of a licensed privatc company specialized in handling oils and solid wastes. Biodegradable organic wastes will be composted on site for tree planting manure. A Good housckeeping as part of the company policy will be implemgnted at the facihty. Firc fighting equipments must be installed in all buildings and placed at strategic places within the power plant site. First aid kits installed should have first aid medicines to teat bums. The iite engineer should make sure there are no un insulated live electricity wires that may affect people, livestock and wildlife. Proper signage to warn public on dangerous areas within the plant. Dust containment and suction systems will be installed on the plant site. Use of PPEs will be strictly enforced. Welders will be provided with respirators, eye protection equipment and dustcoats to minimize inhalations. Regular medical checks will be done and records maintained of the employees. Staff working at the plant will have medical cover. Sanitation related education and practice would form part of the facility's regular routine, to avoid incidences of infections such as cholcra, bilharzias and malaria. Swapping of work stations for staff will rcducc levcls of exposure. The contractor will ensure supervision of work and handling of equipment is restricted to only skilled and experience personnel to prevent accidents. ' 3;:i::.JT,,ff."':i;y"fi',Tii;.:i: "" . Both the contractor and proponent will observe work ethics and worker's compensatlon ln case of injury or loss. . PPE like helmets, overalls, nose and eyes protection hand gloves and boots, all of suitable quality will be used. Use of PPE like earmuffs will be enforced. (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) County Director of Environment, Garissa County. The National Environment Management Authority invites members of the public to stbmit oral or written comments within ttrlrty (30) days from the date of publication of this notrce to the Director-General, NEMA, to assist the Authority in the decisron making process of the plan. z. o. ouMA, Jor Dtrector-General, MR/6901012 National Environment Management Authority GAZE'rIE NOTICE NO. 984 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATIONACT (No.8 oft999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTI{ORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED HOUSING SCHEME ON L.R. NO. 2O9II9715 AT IMARA DAIMA IN NAIROBI COUNTY . INVITATION OF PUBLIC COMNCNTS PURSUANT to regulation 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent (Bangal Trading Company Limited) is proposing to construct a Housing Scheme located off Tegla Lorupe road on L.R. No. 209119715 at Imara Daima in Nairobi County. The proposed project will entail the construction in phases of 4 blocks containing 167 one Bedroom units, 6 Blocks containing 160 Two Bedroom units, Kindergarten and Commercial Centre with shops, and a restaurant with parking spaces for residents and visitors on the ground floors. The following are the anticipated impacts and proposed mitigation measures: Impact Proposed Mitigation Measures Vegetation Clearing. Mlnrmal clearing of vegetation . Removal of vegetation to take place only within demarcated construction site. . Non-essential removal of vegetation to be avoided. . No development on slopes with a gradicnt> 16/o Re-vegetation should incorporate natural vegetation. . Efficient use of materials to minimise on solid waste. . Housekeeping to ensurc no littering from packaging materials. . Separation of plastic and paper waste before appropriate disposal. Solid wastes Liquid Wastes Noise pollution and visual intrusion Air/Dust Pollution Soil Erosion and Sedimentation . Paper and glass 0o be sent for reurc/ recycling. Disposal of solid waste in accordance wrth NEMA solid waste disposal regulations. . Concrete batching and mixing should . occur at one particular point and the site should be paved and drains providcd to ensure polluted water is drained at a particular point. . Prudent use of water to reduce hquid waste volumes. . Schedule noisy activities during the normal working hours of betwecn 8am to 5pm. No work should be undertaken at night or very early in the moming. . Put off machmes and equipments whcn not in use. . Ensure machinery is well maintained to reduce noise emifted. The contractor should adhere to the provision in the Environmental Management and Coordinaton (Norse and Excessrve Vibration pollution) (control) regulations, 2009 Provide worker with appropnate PPEs when working under noisy environment e.g. ear plugs Ensure site rs marntained in a cleanly fashion; Construction completed on time; Site vegetation correctly according to rehabilitatron gurdelines stated in the EMP; and Construction waste is not to enter the biophysical or socio-economic environment. Contractors to produce waste management plans to mitigate potential impacts. Practice dust management techniques, including watenng spraying to suppress dusti Move earth and sand in covercd vehicles/ transport to avoid it belng blown by wind increasing suspend particulate in the atmosphere; All plant to be of good condition with acceptable smoke emissions; Practice selectrve clearing of vegetation; Set up dust barriers/ screens at strategic locations; Provide and enforce the appropriate use of Personal Protective Equipment (PPE) against dust such 4s dust masks. Practice selectlve vegetation clearing where necessary; Install adequate storm watcr management measures; Replant cleared vegetation as soon ls possible; Avoid vegetation clearing during the rainy season; 20th February, 2015 THEKENYA GAZETTE 38r Increased water demand . due to construction works Occupational Health & Safety Schedule earth moving activities during the dry season. The contractor should sensrtize construction workers on the rmportance of proper water management through clerks of works by having talks with them when doing their rounds around the site, Replace or repair leaking pipes supplying water to the construction sites to minrmized wastage. The Contractor should ensure provision of adequate water storage facilities on the construction site to meet project needs during periods of high demand extemally and refill of storage tanks during periods oflow demand. Contractor should ensure registration of all construction works by the Director, Directorate of Occupational Health and Safety Services (DOHSS) in compliance with the Buildings and Works of Construction Engineering Rules, 1984; Contractor should contract a qualified Heal& and Safety advisor to conduct fraining and monitoring of construction works; The contractor should construct a temporary clinic on site to be run by a qualified nurse who will treat opportunistic ailments and injuries such as cold, malaria etc Contractor should provide a standard First Aid Kit on srte; The Contractor should train several workers rn First Aid depending on the number of workers on srte as stipulated in the First Aid Rules 1977 through DOSHS certified First Training institution e.g. Red Cross, St. John Ambulance Dangerous works should be protected, fenced, demarcated or cordoned off; Workers should be inducted with training on health and safety by DOSHS certified health and safety advisor so as to enable ensure machinery safety, construction safety, fire safety and electrical safety as well as workplace inspectron technique; Provide and enforce the use of Personal Protective Equipment (PPE) to workers as appropriate such as overalls, safety boots, hand gloves; The contractor should provide and lnstall firefighting equipment such as fire extrnguishers to fight different classes of fire (Class A, B, and C, D). The Contractor should erect safety and rnformatrve signage for hazardous is taking place such dean excavations, electrical hazard, signage for personal protective equipment such as helmets, hand gloves and boots and prohibited activities such as smoking; The confactor should ensure that all plants to be used dunng construction such as pressure vessels, lifting machines and cylinders for Fire Risksi Management . Ground and surface water. quality compressed gas to be examined and inspected by an approved inspectot before starting using them to ensure safe usage; The contractor should develop site Health and Safety guidelines which are to adhered to by construction workers and visitors to the construction site; Only allow trained and certified workers to handle dehcate equipment. Maintain an rncidenUaccident register,in accordance with the Occupational Safety and Health Act, 2OO7, and report incidences to DOHSS. Place portable fire extinguishers at suitable locations; Train and induct workers on the use of fire extinguishers and other fire fighting equipments; Train all staff on fire safety and procedures; Allocate a fire assembly point; Ensurc safety warnings are prominently displayed at appropriate locations where fires are likely to occur; Provide and enforce the use of Personal Protective Equipment (PPE); Develop a Fire Safety Plan through a qualified specialist and implement the provision of the plan at the workplace. No water abstraction for construction from streams or river; No mixing of concrete to occur on bare ground. Concrete mixing should be done bunded surface to avoid soil pollution and conEminating the ground and surface water; Appropriate contamment structures to be pmvided to store contamlnated water from the construction site. The contractor should ensure these waters are properly disposed and not allowed to be drained on site; No construction activities to occur in any wetlands; No concrete batching to occur directly on the ground. Concrete batching arca should be bunded to prevent contamination of soils and surface water features; All fuel storage to be appropriately bunded and provided wifi a canopy ; Plant to have drip trays to contain any potential leakages of fuels and oils; and Ablutions for construction workers to enable proper disposal of fecal matter and avoid contamination of surface water features which could be a cause of waterborne diseases. vegetation within ihe drainage lines is not to be cleared; - modificauons ro the Cesign of the development to ensure spaces are left to allow for regeneration of loss biodiversity; Post project restoration of loss habitat through vegetation of affected areas. i Loss ofBiodiversity . Material management Sohd Wastes Management Fire Risk /lVlanagement . lncreased pressure on existing utilities Noise and vibration Compensation by the relocation of important grassland habitats from the development site to another area identified as suitable (using techniques such as s oil or turf transfer), or the creation of new habitats. To minimize impact of material and waste disposal during the delivery on site the following mitigation measure has been proposed: Avoid overloading trucks and cover trucks to minimize dust and loss of load from trucks during transportation; For aggregate and sand, use water' sprays or covered chutes to reduce dust emission during loading and unloading of materials from barges; Maintain mixing plants rn good working condition so as to reduce emission from fte plant; As far as possible, plan truck trips to material source and to the sites during low traffic hours; and Implement safety procedures to reduce the potential for road accidents in village or urban areas. Prudent use of mateiials to reduce solid waste volumes; Waste separation to encourage reuse and recycling e.g, plastic and glass bottle; Sewage from the different houses on site could provide substrate for biogas production which can be utilised by the dwellers for cooking therefore reducing the cost of energy, quantity of waste to be disposed and methane whrch as a green house gas. Provision of wastc collecting bins to households which will then be collected for proper disposal by a NEMA licensed waste handler. Place portable fire extnguishers at suitable locations; Induct all the occupants on the fire safety procedures and the use of fire fighting equipments such as fire extinguishers; Allocate a fire assembly point. Ensure safety warnings are prominently displayed at appropriate locations; Recycling of waste water from the different houses and the recycled water uscd for irrigation of lawn and flushing of toilets. Installation of solar panels on each structure !o provide alternative source of power for household use; Scheduling all the decommissioning works within the normal working hours of between 8am and 5pm. Adherence to the Environmental Management and Coordrnation (Noise and Excessive Vibration Pollution) (Control) Regulations, 2009. Water spraying to suppress dust especially where dust activitres are taking place; Cordoning the site using meshed cloth to capture particulates during demolition of the stnrctures. . Providing workers - involved with appropriate protective personal equipments such as dust masks or spiators. (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-O0200, Nairobi. (b) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) County Director of Environment, Nairobicounty. The National Environment Management Authority invites members of the public to submit oral or wrinen comments within thirty (30) days from ttrc date of publication of this notice to the Director-General, NEI{A, !o assist the Authority in the dccision making proccss ofthe plan. z. o. ouMA, lor Director-General, National Environment Management Authority. GAZETTENoTIcENo. I2OO THE ENVIRONMENTAL MANAGEMENT AND CO.OR.DINATION ACT (No.8 ofl999l THE NATIONAL ETWIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STI.JDY REPORT FOR T}IE PROPOSED EXPANSION OF KRYSTALLINE SALT LTD. MARERENI SALT WORKS ON LAND REMRENCE NTJMBER 13427 OFF MALINDI. LAMU ROAD, MARERENI SUB-LOCATION, FUNDI ISA LOCATION, GONGONI DIVISION, MAGARIM SUB-COUNTY KILIFI COUNTY INVITA'UON OF PUBLIC COMMENTS PURSUANT to regulation 21 of ttre Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent (Krystalline Salt Limited (Marereni) ) is proposing to expand Krystaline Salt Limircd (Marereni salt works) on [,and Refercnce Number 13427 off Malindi [.amu Road, Marercni Sub- location, Fundi Isa l,ocation, Gongoni Division, Magarini Sub- County Kilifi County. The proposed expansion will involve construction of evaporators, dykes and one pump. The following are the anticipated impacts and proposed mitigation measu res: Impact Vegetation clearin! Mitigation Measures . Ensuring endemic spccies of plants at the proposed project sit€ are preserved. . Mature trees including the large baobab trees to be preserved. . Vegetation within the seasonal wedand and at the periphcry of the seasonal wetland to be preserved. . A twenty meter vegetation greenbclt to be maintained between the boundary qf the adjacent learning institutions (Marereni Primary School and Marereni Secondary School) and the proposed project site and between the boundary of the adjacent farms and the proposed project site and between dre boundary of the adjacent villages and the proposed project site. ' Vegetation removal to be done in st,ges as opposed at oncc on the entire area to be developcd. MN6mr271 Air pollution 20th February,2015 THE KENYA GAZETTE Disnrbance of local and migatory fauna habitat including avifauna Blockage ofthe seasonal . stream that drains water to seasonal swamp Phasing out of the seasonal swamp Phasing out of shallow wells at project site Environmental pollution from poor disposal of biften and effluent Management to substantially rnvest in tree planting and developed in all open areas that are not earmarked for developed but are within the boundanes of the company land. Management to support tree plantlng efforts outside company land but within the community to boost overall tree cover in the area to offset trees that will be lost from vegetation to be cleared at the proposed project site. Preserving key habitats of the fauna such as the large baobab trees. Preserving the seasonal swamp which is a habitat for local amphibians and avifauna. Identifying feeding areas of the fauna including avifauna and preserving them by maintaining pockets of vegetation within the proposed project site in identified strategic fauna feeding areas. Ensuring there is no captunng and or removal of any fauna from the proposed proJect slte during implementation. Mrnlmrsrng noise and vrbratron ftom equlpment activity during construction phase that might course some fauna to hypamate and or relocate. Maintain ecological sensitive vegetation that is essential for tlre sustenance of local fauna. Ensuring that the seasonal stream that drains its waters into the local seasonal swamp (Lake Sud0 is not blocked but left to flow as it is currently. The sectron of the proposed project site occupied by the seasonal swamp (Lake Sudi) to be curved out of the area to be developed and maintained as undeveloped to sustain the seasonal swamp. The vegetation within the seasonal swamp and around the seasonal swamp to be preserved for the preservation of the waters of the seasonal swamp and the fauna that live there in. Any existing upstream seasonal swamps outsrde the proposed project site to be preserved. Any downsffeam seasonal swamps outside the proposed project site to be preserved. All solid waste to managed and disposed as provided for in the Environmental Management and Coordinafion (Waste Management) Regulations 2006. All liquid waste to be managed and disposed as provided for in the Environmental Management and Co- ordination (Water Quality) Regulations, 2006. All bitten generated to be drained into properly constructed bitten ponds which are lined with impermeable material at the bottom to ensure no ground seepage of the brtten. The binen to be held in the bitten pond and be used to produce low grade salt i.e. cattle salt. There should be no disposal of any bitten at any time to the environment. Effluen-t from salt washing to be sent to settling tanks whgre particles settle down and before recychng back rnto the salt washing process. There should be no disposal of any effluent from salt washing at any time into the environment. All solid waste to managed and disposed as provided for in the Environmental _ Management and Coordination (Waste Management) Regulations 2006. All liquid waste to be managed and disposed as provided for in the Environmental Management and Co- ordination (Water Quality) Regulations, 2006. All bitten generated to be drained into properly constructed bitten ponds which are lined with impermeable material at the bottom to ensure no ground seepage of the bitten. The bitten to be held in the biuen pond and be used to produce low grade salt i,e. catde salt. There should be no disposal of any binen at any time to the environment. Effluent from salt washing to be sent to settling tanks where particles settle down and before recycling back into the salt washing process. There should be no disposal of any effluent from salt washing at any time into the environment. All workers to be provided with appropriate personal protective equipment. All workers to be kained in the appropriate use of personal protective equipment provided. Management to enforce on the use of provided p€rsonal protective equipment. Working equipment to be serviced and maintained on Schedule. Workers to have the appropriate training on operation and use of work tools and equipment. Workers to be appropnately trained in safety. Equipment operating manuals to be provided. Welfue facilities such as fust aid boxes, canteen, potable water, changing rooms to be provided and maintained in good condition. Pre- employment and post-employment medical examinafion of workers. (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-O0200, Nairobi. (D) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) County Director of Environment, Kilifi County. The National Environment Management Authority invites members of the public to submit oral or wntten comments within thfuty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. Air, water and soil pollution from proposed project activities Occupationalaccidents, . injuries and diseases arising from the work environment KODIAD. BISIA, Jor Director-General, National Environment Mana gement Authority. I MR/690r383 I I GAzE-rrE NorrcE No. 1201 THE BANKRUPTCY ACT (Cap.53) RECEIVING ORDER AND CREDITORS' MEETING (Under Rule 145 of the Bankruptcy Rules) De btor's name. -Wilfred Kashonga Saroni. Address.-P.O. Box 507, Voi. Desc r ip t io n. - Businessman. Date of filin g pe tition. - l6th J anuary, 20 I 5. Court.-HighCourt of Kenya, at Milimani. Date oJ orde r. -28th January, 2014. Cause No.-3 of2Ol5. Whether debtor's or creditors petition.- Debtor' s petition. Act or acts of bankruptcy.-lnability to pay debts. Daie and time oJfirst creditors' meettng.-26th March,2015 Venue. - Sheia House, Ground Floor. Time.-2.3Op.m. Ltst d.ay oJfiling proof oJ debt forms.-25th March, 2015. Dated the 29th January,2015. MR/6901209 MARKGAKURU, Deputy Oficial Receiver.

Dated the 25th March, 2015.

MARKGAKURU,

Deputy Oficial Receiver.

Extracted Entities (4)

previous_gazette_ref

98

institution

Northern Energy Bangal Trading Company Krystalline Salt

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
Cap.53
Signed By
MARKGAKURU
Title
Deputy Oficial Receiver
Date Signed
25th March 2015
Page
32
Extraction Method
regex