Back
REGULATION
100% confidence
via ocr-fallback
GAZETTE NOTICE NO. 9648
GAZETTE NOTICE NO. 9648
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The Proponent, AFRIGO Development Company Limited has proposed to construct offices, dining and recreational facility, conference hall, staff quarters, green areas, access gates and basketball court along Langata road in Karen, off Hillcrest road passing within the proposed area of development. The total project area measures about 6.8560 hectares with site A comprising of about 4.3180 hectares on LR No. 29713/4 and site B comprising of 2.6380 hectares on L.R
No. 3586/400. Site B is located on the RHS of Hillcrest Road from
Langata Road while site A is located on the LHS.
The following are the anticipated impacts and proposed mitigation measures:
Impact Proposed Mitigation Measure
Noise and vibration e = Formulate an inspection = and maintenance program for the machines and equipment on site.
e Implement both engineering and administrative controls for machines and equipment to reduce noise pollution at the site.
e Comply with the provisions of
Environmental Management and
Coordination (Noise and Excessive
Vibration Pollution) (Control)
Regulations, 2009 regarding noise limits at the workplace.
Dust generation e §=©Sprinkling of water at the site and access roads during dry conditions to suppress fugitive dust e Fix a dust proof net five (5) meters high above the hoarding
Contract a NEMA licensed waste handler to manage solid waste
Solid waste ° e Apply an Integrated Solid Waste
Management approach e Adhere to the provisions of the Waste
Management Regulations of 2006
Air Pollution: Fumes e Use of low sulphur diesel for diesel powered vehicles and equipment.
31st December, 2015 e Proper maintenance of machinery and vehicles e = Prohibit open burning of any kind of waste on site
Risk of occupational e accidents and diseases
Set up a health and safety committee and periodic site inspections, training and annual safety audits.
e Provide appropriate PPEs to workers and visitors to the site e Adhere to the provisions of the
Occupational Health and Safety Act of
2007.
Generation of wastee Construction of septic tanks and a bio water digester e Identify opportunities for reuse of waste water e Formulate and implement an inspection and maintenance program for the waste water disposal system
Increased demand fore water and electricity
Incorporate rain water harvesting technology in the project design e Encourage water reuse and/or recycling e Use of energy efficient machines and appliances e —_ Provision of a standby generator
Limit excavations to areas marked for development
Land degradation e e Apply a layer of selected backfill material on the access roads
Vegetation clearance e Ensure vegetation is only cleared in areas where foundations are to be dug e Trees to be protected insitu to be clearly identified on the plans and communicated to all construction staff.
Traffic Congestion e Transport of materials during the traffic off peak hours to avoid possible traffic congestion, e Purchasing of material according to the demand, e Ensuring minimal residence period for trucks mobilizing material on site, e Proper planning during construction period.
Insecurity e Employ construction workers who possess valid certificates of good conduct e Provide screening arrangements at the gate e Formulate a comprehensive security plan and implement it. Contract a reputable security firm to be in charge of security at the site.
e Liaise with the neighbours and the local administration in security management
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(6) Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126-
00100, Nairobi.
(c) County Director of Environment, Nairobi County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
DAVID ONGARE, for Director-General, MR/8448590 National Environment Management Authority.
Dated the 31st December, 2015.
DAVID ONGARE,
for Director-General, National Environment Management Authority.
Extracted Entities (2)
previous_gazette_ref
9648
institution
AFRIGO Development Company
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- DAVID ONGARE
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 31st December 2015
- Page
- 28
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXVII No. 148 (SUPPLEMENT)
Published 31st December 2015