Back
ACT
100% confidence
via regex
GAZETTE NOTICE NO. 70
GAZETTE NOTICE NO. 70
THE ELECTRIC POWER ACT
ACT
IT IS notified to the general public that Power Technology
Solutions Limited, a company incorporated in the Republic of Kenya, intends to apply for a power generation license after sixty (60) days of expiration of this notice in accordance with section 5(2) of the Electric
Power Act, 1997.
The generation will be on different operating regimes including wind, solar and water in accordance with international IEC standards and in compliance with NEMA and WRMA approvals.
Proposed sites of supply:
Energy Spectrum LLC site, Kieni.
Gitugi Social Impact LLc site, Gitugi.
Earth Head Generation LLc site, Nyeri.
Any representation on or objection to the application or to grant of licence must be received in writing to the Cabinet Secretary Energy and copied to the applicant marked ―Electric Power Act‖ on or before the expiration of sixty (60) days of this notice.
Dated the 19th December, 2014.
E. N. NYAWIRA, MR/6724131 Regional Director, Generation Division.
Dated the 19th December, 2015.
E. N. NYAWIRA,
Regional Director, Generation Division.
Extracted Entities (2)
previous_gazette_ref
70
institution
Power Technology Solutions
Details
- Act / Legislation
- THE ELECTRIC POWER ACT
- Signed By
- E. N. NYAWIRA
- Title
- Regional Director, Generation Division
- Date Signed
- 19th December 2015
- Page
- 21
- Extraction Method
- regex
Source Gazette
Vol. CXVII No. 1
Published 2nd January 2015