Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 13177
GAZETTE NOTICE NO. 13177
THE WATER ACT
(Cap. 372)
APPROVAL
under the powers granted by section 72 (1) (b) and (2) of the Water Act, 2016, has approved the regular tariff adjustment for the area served by Murugi Mugumango Water Society.
Murugi Mugumango Water Society applied to the Water Services Regulatory Board (WASREB) for a review of water services tariffs for the period 2026/2027 to 2028/2029, as per section 72 (1) (b) of the Water Act 2016.
Public consultation on the Murugi Mugumango Water Society’s application was carried out in accordance with the requirements of section 139 of the Water Act 2016.
Having considered the application, the written and oral submissions by all stakeholders and the current data, WASREB has determined that an upward tariff review is justified for Murugi Mugumango Water Society to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB hereby gives a one-month notice from the date of this communication to all existing and potential customers of Murugi Mugumango
Water Society that the structure of approved tariffs for water services for the three financial years 2026/2027, 2027/2028 and 2028/2029 shall be as follows:
1.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2026/2027 to 2028/2029
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh/M3)
Domestic/Residential 1-6 25
7-20 30
21-50 35
51-100 40
>100 50
Multi- Dwelling Units 30
Commercial/Industrial 1-50 30
51-100 40
>100 50
Government/Institutions 1-50 30
51-100 40
>100 50
Public Schools, Colleges, and Universities 1-600 30
3986 3986
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh/M3)
601-1200 40
>1200m3 50
Unique Consumer Categories (Water Kiosks) Water Kiosks 30
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2027.
1.4 Miscellaneous Charges
These shall be as follows:
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2500
Retail shops less than 10m3 3000
Retail shops with more than 10m3 3,500
Bar and restaurants with less than 15 m3 4000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” with less than 150 m3 12,000
Hotel class “A” and “B” with more than 150 m3 15000
Hotel class “C” and ‘D’, with less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals and Health centres with more than 150 m3 20,000
Hospitals and Health centres with less than 150 m3 12,000
Schools and other institutions have more than 200 m3 20,000
Schools and other institutions with less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites with more than 300 m3 50,000
Light industries with less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000 & 16,000 litres 2,500 & 5,000, respectively, per tanker within the WSP area for all consumers
Sale of water per M3 at Browsing Point (own tanker) 30
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Leak detection services 1,000
Printing of the customer’s statement on their own request 200
For cutting off the supply at the request of the consumer 200
For turning on the supply other than in respect of a first connection 200
Penalties
Illegal water connection -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at the water kiosk 15,000
Self-reconnection after cut-off for non-payment 5,000, and billing to be backdated from the date of the cut-off
Surcharge for tampering with meters (this includes meter removal, reversing of meter, etc.)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Structure
2.1 Cost Summary
Below is the summary of the projected annual cost structure that makes up the total costs to be incurred by Murugi Mugumango Water Society during the tariff period:
Proposed Tariff for Murugi Mugumango Water Society
Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Operations 23,010,488 28,994,875 31,589,648 32,284,415 32,995,560
Maintenance 219,716 3,200,000 3,264,000 3,329,280 3,395,866
14th August, 2026 THE KENYA GAZETTE
Proposed Tariff for Murugi Mugumango Water Society
Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Regulatory Levy 781,479 1,024,259 2,259,009 2,358,489 2,457,983
Total O&M Costs 24,011,683 33,219,134 37,112,657 37,972,183 38,849,408
Investment Costs - - 14,088,000 14,186,000 14,009,800
Debt Repayment - - - - -
Total Costs 24,011,683 33,219,134 51,200,657 52,158,183 52,859,208
Total Billing (KShs) 19,298,633 25,606,465 56,033,967 58,512,142 60,990,494
Collection Efficiency (%) 117% 95% 95% 95% 95%
Projected Revenue 22,579,401 24,326,142 53,232,268 55,586,535 57,940,969
O&M Cost Coverage 94% 73% 143% 146% 149%
Total Cost Coverage 94% 73% 104% 107% 110%
5.0 Conditions attached to the tariff approval.
The conditions attached to this approval, which shall form part of the license conditions of Murugi Mugumango Water Society are:
5.1 Service Delivery Conditions attached to the Tariff
Target 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Water Coverage 65% 66% 67% 68% 69%
Water quality standards 20% 20% 100% Compliance with Standards
Personnel Expenditure as % of O&M 56% 34% 33 33% 33%
Non-Revenue Water 59% 57% 55% 53% 51%
Hours of Supply (Hrs.) 24 24 24 24 24
Staff per 1000 connections 5 5 5 5 5
Metering ratio 95% 95% 100% 100% 100%
Collection Efficiency 117% 95% 95% 95% 95%
Resale at Kiosk KSh. 2.00 per 20l Jerrycan
5.2 Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
5.3 Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB
5.4 Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided.
5.5 Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their source of water as part of
Corporate Social Responsibility
5.6 Regulatory Levy: The utility is to pay a monthly regulatory levy based on 4% of turnover, which is inclusive of billing for other services and interest income earned.
5.7 Investments: The utility shall undertake the investments in Appendix 1:
4. Penalty notice
4.3 Take note that failure of an Accounting Officer to administer this tariff and the conditions attached to it is an offence subject to section 196
(2) of the Public Finance Management Act 2012, 117 (1) (aa) of the County Governments Act 2012, Sections 147 and 158 of the Water Act
2016, and Regulations 46 (1), 101 and 105 of the Water Services Regulations 2025.
4.4 Failure to comply with the tariff and conditions attached to it amounts to a breach of licence conditions and shall attract sanctions pursuant to section 92 of the Water Act 2016, including:
(i) Payment of a penalty
(ii) Suspension or cancellation of the licence.
(iii) Placement of the utility under Special Regulatory Regime.
(iv) Prosecution.
Appendix 1: Investments through internally generated funds by Murugi Mugumango Water Society
FY 2026 2027
Specific Asset Descriptions Area Unit Unit Cost Quantity Project Cost (KSh.) a) Zonal meters Master Meter - Multi Jet DN
50mm Class C
Wiru branch line
No 22,000 3 66,000
Master Meter - Multi Jet DN
32mm Class C
Mwema
Munga branch line
No 18,000 4 72,000 b) Motorcycles Motorcycles 150CC No 150,000 3 450,000 c) Replacement / New
Connections
Multi Jet DN 15mm Class C Whole
Service Area
No 4,500 3,000 13,500,000
Total 14,088,000
FY 2027 2028
Specific Asset Descriptions Area Unit Unit Cost Quantity Project Cost (KSh.) a) Pipeline OD 160mm PN 12.5 HDPE Mwiria M 2,310 2,500 5,775,000
3988 3988
Specific Asset Descriptions Area Unit Unit Cost Quantity Project Cost (KSh.) pipes to be laid from Baragu
Tank to Mwiria Tank
OD 110mm PN 12.5 HDPE
Pipes to be laid from Igwanjau
Tank to Kibura Tank
Kibura M 1,067 3,000 3,201,000
OD 90mm PN 10 HDPE Pipes for Distribution Kibura to
Ikumbo Market
Ikumbo M 880 3,100 2,728,000
OD 32mm PN 8 HDPE pipes for Distribution - Ikumbo
Market to Othaini Polytechnic
Othaini M 94 3,200 300,800
OD 32mm PN 8 HDPE pipes for Distribution - Ikumbo
Market and environs
Ikumbo M 94 2,000 188,000 b) Production meter Master Meter - Multi Jet DN
300mm Class C
Mutindwa main line
No 380,000 1 380,000
Master Meter - Multi Jet DN
250mm Class C
Kianjagi main line
No 350,000 1 350,000 c) Transmission mainline
Master Meter - Multi Jet DN
200mm Class C
Karaa - baragu line
No 320,000 2 640,000
Master Meter - Multi Jet DN
150mm Class C karaa - kiriani line
No 300,000 2 600,000 d) Valves 80mm Sluice valve flanged Baragu No 12,000 2 24,000
TOTAL 14,186,800
FY 2028 2029
Specific Asset Descriptions Area Unit Unit Cost Quantity Project Cost (KSh.) a) Motor Vehicle Motor Vehicle 2800 cc No 5,000,000 1 5,000,000 b) Pipeline OD 160mm PN 12.5 HDPE pipes to be laid from Mwiria
Tank to Igwanjau Tank
Kanyambo M 2,310 3,900 9,009,000
TOTAL 14,009,000
Dated the 14th August, 2026.
RICHARD CHERUIYOT, Ag. Chief Executive Officer, MR/8284338 Water Services Regulatory Board.
Dated the 14th August, 2026.
RICHARD CHERUIYOT,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
13177
Details
- Act / Legislation
- THE WATER ACT
- Reference
- Cap. 372
- Section
- section 72 (1) (b)
- Signed By
- RICHARD CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 14th August 2026
- Page
- 53
- Extraction Method
- regex
Source Gazette
Vol. CXXVIII No. 140 (SUPPLEMENT)
Published 14th August 2026