Back
REGULATION 100% confidence via ocr-fallback

GAZETTE NOTICE NO. 5824

GAZETTE NOTICE NO. 5824

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The Proponent (Astrol Petroleum Company Limited) is proposing to set up a fuel filling station on Plot L.R. No. 4885/124 and 4885/125 Rironi Kikuyu, Kiambu County The proposed project will contain the following components: underground storage tanks with vents and breathers, oilinterceptor and septic tank, fuel dispensers under steel canopy, service bays such as tyre centre, car wash and repair shop, drive way and car park, management offices, compound work and walls. The following are the anticipated impacts and proposed mitigation measures: Impact Mitigation Measures Occupational Health and ° Safety Environmental Management Plan and a workable and cost effective implementation plan be put in place during the construction and operations phases. ¢ All activities be carried out in ensuring better working conditions and compliance with the legal requirements. Waste generation ¢* The materials that cannot be re-used should be disposed of at designated sites as stipulated in the environmental laws * Proper waste disposal. ¢ Provision of waste collection bins for easier waste segregation and disposal of waste. Rocks from excavation, * The soil excavated will be re-used in concrete and block off- filling and leveling the foundation cut chips which should be minimal. ¢ All the un-usable component be transported and disposed in designated areas. Soil Erosion and * The soil excavated will be re-filling the Degradation foundations. * Control earthworks to avoid interfering with land not to be built upon. Construction materials * Use of standard materials already certified by the government. * Comply with the building code on structural configurations and materials to be used. Use of colors and_ structures that enhance visual facade. Visual enhancement ° ¢ Paint entire walls and external entrances to render well to general neighborhood. Storm water to be directed into the natural drains. Hydrology, drainage and ° ground water resources ¢ Properly design drainage structures to prevent silting and soil erosion. Water resources * Control usage of water to minimize wastage. ¢ Install toilets flush with low volume cisterns and a long and short flush and push taps. ¢ Rain water harvesting to prevent over dependence on already limited available water resources. Biological resources ¢ Landscaping and planting of fast growing trees, shrubs, grasses and ornamental flowers where possible. Conflict resolution ¢ Public consultation and interview. * No interference with the any structure or resource of public and cultural interest to the community. ¢ The project will also create employment opportunities during construction and operations phases. Occupational Health and ° Safety Regulations Awareness training sessions focusing on environmental, health and __ safety regulations, requirements of the Environmental Management and Coordination Act. ¢ Prepare health and safety plan. ¢ Adhere to the general matters, stipulated health, safety and workforce welfare regulations. ¢ Provide workforce with safety wearing gear and enforce their use. Emergencies and ° Accident Occurrences Provision of personal protective clothing Protective clothing and safety gadgets to be provided to the workers and visiting clientele. ¢ Emergency response plan. Records of Accidents ¢ Records on number and nature of accidents and injuries to be maintained. Air, Dust and Noise ¢ Dust protection gadgets to be provided Pollution to the workers. * Carry out off-site maintenance of trucks and machinery. Social Security and ° Safety Construction of perimeter fence. ¢ Install basic security facilities such as street lighting and security alarms. Road Safety and Access * Erection of warning signs and directions ¢ Supervise movements of trucks and machinery at all times. General Risks and ° Hazards Building design schedules to comply with local authority specifications of building regulations. * Comply with Ministry of Work’s code regulations for earthquakes. * Comply with Kenya building code regulations for fire hazards. ¢ Certification of construction materials. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30126- 00100, Nairobi. (c) County Director of Environment, Kiambu County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. ZEPHANIAH O. OUMA, for Director-General, MR/5692057 National Environment Management Authority.

Dated the 22nd August, 2014.

ZEPHANIAH O. OUMA,

for Director-General, National Environment Management Authority.

Extracted Entities (2)

previous_gazette_ref

5824

institution

Astrol Petroleum Company

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
ZEPHANIAH O. OUMA
Title
for Director-General, National Environment Management Authority
Date Signed
22nd August 2014
Page
59
Extraction Method
ocr-fallback