Back
REGULATION
100% confidence
via ocr-fallback
GAZETTE NOTICE NO. 554
GAZETTE NOTICE NO. 554
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Marina Bay Squire Development Limited, proposes to develop residential apartments comprising of a two semi- detached
16-storey blocks with a total of 224No. apartment units
(112No. one bedroom apartments, 112No. two bedroom apartments), Sifts, parking, guard house, protected dustbin cubicles, driveways, and other associated facilities and amenities on L.R No. 1870/X/34, at the junction of David Osieli Road and Sports Road, Westlands, Nairobi
City County.
The following are the anticipated impacts and proposed mitigation measures.
Impacts
Soil disturbance .
Change in ° hydrology
Liquid waste .
Increased energy ° use
Proposed Mitigation Measures
Control earthworks and compact loose soils.
Ensure the geo-technical survey is conducted before commencement of any excavations.
Install drainage structures properly.
Landscaping on project completion.
Control and manage excavation activities.
Contro] activities especially during rainy conditions.
Provide soil erosion control and conservation structures/means where necessary.
Ensure standard appropriate practices on the provided gardens.
Proper installation of drainage structures commensurate with the new development.
Install cascades to break the impact of water flowing in the drains.
Ensure efficiency of drainage structures through proper design and maintenance.
Provide gratings to the drainage channels.
Ensure sanitary facilities are kept clean always through regular cleaning.
Ensure regular maintenance of foul water drainage works at the premises to prevent clogging and fore-stall breakdowns.
Frequent monitoring of the internal drainage system.
Solar energy will be used as an alternative source of energy.
Use energy efficient appliances such as
LED bulbs for lighting.
Switch off electrical appliances when not in use.
Regular maintenance of all the electrical components.
Impacts
Noise pollution
Solid waste
Oil pollution
Water resources
Public health, occupational health and safety
Proposed Mitigation Measures
Regular inspection and maintenance of the solar panels.
Erect suitable barriers to control noise.
Sensitize drivers of construction machinery on effects of noise.
Maintain plant equipment (if present).
Construction activities to be restricted to daytime.
Workers in the vicinity of or involved in high-level noise to wear safety and protective gear.
Work to be confined between 8 a.m. and 5 p.m. weekdays and 8 a.m. to 1 p.m. on weekends. There should be no construction works on Sundays.
Use of an _ integrated solid waste management system through a hierarchy of options: source reduction, recycling, composting and reuse, will facilitate waste handling.
Ensure segregation of waste (organic and inorganic) at source.
Provide clearly marked dustbins cubicles to serve the specified use.
Ensure that wastes generated are efficiently managed through recycling, reuse and proper disposal procedures.
Engage services of a registered NEMA waste handler to dispose the waste regularly at approved disposal points.
Proper storage, handling and disposal of new oil and used oil wastes as per waste regulations.
Maintain plant and equipment to avoid leaks.
Maintenance of construction vehicles should be carried out in the contractors yard
(off the site).
Provide oil interceptors along the drains leading from car park and potentially oil risk areas.
Management of water Avoid unnecessary wastage.
usage.
Recycling of water at the construction phase where possible. Make use of roof catchments to provide water i.e for general purposes.
Train staff/workers on occupational health hand safety.
Provide full protective gear and workmen's compensation cover in addition to the right tools and operational instructions and manuals during construction.
Adopt sound housekeeping practices.
Sensitize residents on environmental management, Design of sewerage system should be as provided in the plans.
Post strategically the Occupational Safety and Health Act, 2007 Abstract and provide material safety data sheets.
Post clear warning signs e.g. ‘No unauthorized use of machines’, ensure there are guards on moving parts e.t.c
21st January, 2022
¢ Provide fully equipped First Aid kits and train staff on its use. Ensure adherence with the legal requirements -OSH Act, 2007.
Fire ¢ Install firefighting equipment as provided elsewhere in the report. Conduct training on firefighting, evacuation and emergency response.
¢ Sensitize the residents on fire risks i.e.
conduct regular fire drills.
¢ Adapt effective emergency response plan.
¢ Maintain service firefighting machinery regularly.
¢ Provide emergency numbers at strategic points.
Water quality and ° Follow NEMA regulations.
waste management
Security * Provide security guards and facilities during the entire project cycle.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO, Director-General, MR/3274152 National Environment Management.
Dated the 21st January, 2022.
MAMO B. MAMO,
Director-General, National Environment Management.
Extracted Entities (1)
previous_gazette_ref
554
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 21st January 2022
- Page
- 29
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXXIV No. 15
Published 1st January 2022