GAZETTE NOTICE NO. 1367
GAZETTE NOTICE NO. 1367
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Minara Homes Limited, proposes to develop a single mega high-rise residential-aparments block comprising single basement floor, ground floor plus 17No.floors) with a total of 180No.
apartment units of three, four and five bedroom apartments acompanied by 4No.bedroomed duplexes with domestic servant quarter from 2nd to 18th floor, 4No. slots for fast and heavy duty lifts installation, 213No. parking slots, mosque(prayer area), gym, swimming pool and other associated facilities and amenities on LR.
No. 1870/1/237 situated along Eldama Ravine Road. Highridge Area within Westlends Sub-County in Nairobi City County.
The following are the anticipated impacts and proposed mitigation measures.
impacts Proposed Mitigation Measures
Structural demolition * Demolition of the existing structures and soil within the — site, transportation and disturbance dumping of the generated wastes have to
(disturbance of the be done as per the laid down rules and neighbours: regulations of the Building Code.
occupational safety
: * Site excavation works to be planned such and health impacts) be planned su that a section is completed and rehabilitated while another section begins
* Apply soil erosion control measures such as levelling of the project site to reduce tun-off velocity and increase infiltration of storm water into the soil.
¢ Excavation material will be loaded into trucks and be transported to designated disposal sites.
° Design and implement an appropriate landscaping programme to help in re- vegetation of part of the project area after construction. Reuse of the top soil in landscaping.
Vegetation ° Ensure proper demarcation and disturbance delineation of the project area to be affected by construction works.
° Designate access routes and parking within the site.
* Preserve of some individual trees within the site.
11th February, 2022 THE KENYA GAZETTE 533 impacts Proposed Mitigation Measures Impacts Proposed Mitigation Measures
¢ Introduction of new vegetation (trees, * Ensure that damaged or wasted shrubs and grasses) on open spaces to construction materials including cabinets, replenish the damaged greenery followed doors, plumbing and lighting fixtures, by their continuous maintenance. marbles and glass will be recovered for
. . . refurbishing and use in other projects.
* Design and implement an appropriate landscaping programme to help in re- * Donate recyclable/reusable or residual vegetation of parts of the project area after materials to local community groups, construction. institutions and individua! loca! residents
. or home owners.
High demand of raw ¢ Source building materials from local materials suppliers who use environmentally ¢ Use of durable, iong-lasting materials that
Increased storm water, run-off and soil erosion
Increased solid waste generation friendly processes in their extractions and operations.
Ensure accurate budgeting and estimation of actual construction material requirements to ensure that the least amount of material necessary is ordered.
Ensure that damage or loss of materials at the construction site is kept minimal through proper storage.
Use at least 5%-10% recycled, refurbished or salvaged materials to reduce the use of raw materials and divert material from landfills.
Surface runoff and roof water shall be harvested and stored in underground reservoir tanks for reuse.
A storm water management plan that minimizes impervious area infiltration by use of recharge areas and use of detention and/or retention with graduated outlet control structure will be designed.
Apply soil erosion control measures such as levelling of the project site to reduce run-off velocity and increase infiltration of storm water into the soil.
Ensure that construction vehicles are restricted to existing graded roads to avoid soil compaction within the project site.
Ensure that any compacted areas are ripped to reduce run-off.
Site excavation works to be planned such that a section is completed and rehabilitated before another section begins.
Open drains all interconnected will be provided on site and linked to peripheral storm water drains.
Roof catchments will be used to collect the storm water for some other uses.
Construction of water storage tanks to collect storm water for other uses.
Use of an integrated solid waste management system i.e. through a hierarchy of options: 1. Source reduction
2. Recycling 3.Composting and reuse 4.
Combustion 5S. Sanitary land filling.
Through accurate estimation of the sizes and quantities of materials required, order materials in the sizes and quantities they will be needed, rather than cutting them to size, or having large quantities of residual materials.
Ensure that construction materials left over at the end of construction will be used in other projects rather than being disposed of.
Dust emission
Exhaust emission
Noise and vibration
Increased energy consumption will not need to be replaced as often, thereby reducing the amount of construction waste generated over time.
Provide facilities for proper handling and storage of construction materials to reduce the amount of waste caused by damage or exposure to the elements.
Use building materials that have minimal or no packaging to avoid the generation of excessive packaging waste.
Ensure strict enforcement of on-site speed limit regulations
Avoid excavation works in extremely dry weathers.
Sprinkle water on graded access routes when necessary to reduce dust generation by construction vehicles.
Personal protective equipment to be worn at all times during working periods.
Vehicle idling time shall be minimized.
Alternatively fuelled construction equipment shail be used where feasible equipment shall be properly tuned and maintained.
Sensitize truck drivers to avoid unnecessary racing of vehicle engines at
Joading/offloading points and parking areas. and to switch off or keep vehicle engines at these points.
Sensitize construction vehicle drivers and machinery operators to switch off engines of vehicles or machineiy not being used.
Sensitize construction drivers to avoid gunning of vehicle engines or hooting especially when passing through sensitive areas such as churches, residential areas and schools.
Ensure that construction machinery are kept in good condition to reduce noise generation.
Ensure that all generators and heavy duty equipment are insulated or placed in enclosures to minimize ambient noise levels.
The noisy construction works will entirely be planned to be during day time when most of the neighbours will be at work.
Ensure electrical machinery, equipment.
appliances and fights are switched off when not being used.
Install energy saving fluorescent tubes at all lighting points instead of bulbs which consume higher electric energy.
The works must be limited from 8 a.m. to
6 p.m. for maximum usage of the free
Impacts
High Water demand
Generation of wastewater
Approval of building plans
Site organization
Security
Personal protective gear (PPG)
Health and safety impacts and Covid-
19 protocols
First Aid
Fire protection
Proposed Mitigation Measures sun’s light and only be done at night on special permission and on necessity.
* Promptly detect and repair of water pipe and tank leaks.
¢ Encourage and sensitize staff on water conservation techniques.
¢ Ensure taps are not running when not in use.
* Install water conserving taps that turn-off automatically when water is not being used.
* Install a discharge meter at water outlets to determine and monitor total water usage.
* Provide means for handling sewage generated by construction workers e.g. use mobile toilets.
¢ Ensure that all building plans are approved by the Local Authority and the
Local Occupational Health and Safety
Office.
¢ Develop a clear site organization plan and construction schedule.
* Deliver and store materials at appropriate locations.
* Hire the right number of workers with clear work schedule and appropriate dress gear.
* Ensure the general safety and security at all times by providing day and night security guards and adequate lighting within and around the premises.
¢ Suitable overalls, safety footwear, dust masks, gas masks. respirators, gloves, ear protection equipment etc. should be made available and construction personnel must be trained to use the equipment.
¢ [mplement all necessary measures to ensure health and safety of workers and the general public during operation of the housing project as stipulated in OSHA
Act, 2007.
* With the outbreak of Corona Virus worldwide, serious Covid-19 protocols must be put in place and be implemented rigorously during the socially-involving construction stage to protect the workers and ensure smooth continuity of the project to completion.
* Well stocked first aid box which is easily available and accessible should be provided within the premises.
° Provision must be made for persons to be trained in first aid, with a certificate issued by a recognized body.
¢ Firefighting equipment such as fire extinguishers should be provided at
Strategic locations such as stores and construction areas.
* Regular inspection and servicing of the equipment must be undertaken by a reputable service provider and records of such inspections maintained.
* Signs such as “NO SMOKING” must be prominently displayed within the
Impacts
Machinery/equipment safety
Storage of materials
Safe means of access and safe place of employment
Proposed Mitigation Measures premises. especially in parts where inflammable materials are stored.
Ensure that machinery, equipment, personal protective equipment, appliances and hand tools used in construction do comply with the prescribed safety and health standards und be appropriately installed maintained and safeguarded.
All machines and other moving parts of equipment must be enclosed or guarded to protect all workers from injury.
Arrangements must be in place to train and supervise inexperienced workers regarding construction machinery use and other procedures/operations.
Reports of muchinery inspection/examinations must be presented in prescribed forms, signed by the examiner and attached to the general register.
Ensure that materials are stored or stacked in such manner as to ensure their stability and prevent any fall or collapse.
Ensure that items are not stored/stacked against weak walls and partitions.
All floors, steps, stairs and passages at the construction site must be of sound construction and properly maintained.
Securely fence or cover all openings in ground, floors.
All ladders used in construction works must be of good construction and sound material of adequate strength and be properly maintained.
Ensure that construction workers are not locked up such that they woutd not escape in case of an emergency.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairabi.
(¢) County Director of Environment. Nairobi City County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MR/3235339
MAMOB. MAMO, Director-General, National Environment Management.
Dated the 11th February, 2022.
MAMOB. MAMO,
Director-General, National Environment Management.
Extracted Entities (1)
previous_gazette_ref
1367
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Signed By
- MAMOB. MAMO
- Title
- Director-General, National Environment Management
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 11th February 2022