GAZETTE NOTICE NO. 1366
GAZETTE NOTICE NO. 1366
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Erdemann Property Limited, proposes to expand the River Estate Residential! Development by constructing additional 3 blocks of 34 floors each with 10 units per floor, additional two units per floor on the previously approved 6 blocks of 34 floors each of 8 units per floor making it a total of 10 units per floor by doing away with the 3-bedroom units in favor of 2 bedroom and studio apartments.
The development will have a total of |.835No. housing units. 16 No.
shops, parking lots in the two basements and ground floor. Other project associated facilities and amenities shall include an onsite concrete mixer batching plant, lifts, staircase, driveways, green area and two gates.
The following are the anticipated impacts and proposed mitigation measures:
Impact Mitigation Measure
Soil erosion ¢ Excavated soil is to be used for backfilling excavated areas while excess svil is disposed of off-site.
¢ Soils are not to be left exposed to wind/water.
¢ Excavation activities to be done during the dry season to avoid soil erosion and siltation of streams.
¢ Construction of effective drainages and culverts.
* Plant soil binding grasses and other native plants.
Air pollution * Control speed of vehicles and prohibit idling.
¢ Spray water during construction.
¢ Maintenance vehicles and equipment regutarly.
* Provision of dust masks for use in dusty conditions.
Impact
Excess noise and vibration
Generation of solid und liquid waste
Health and safety
Mitigation Measure
Use serviceable vehicles/machinery to reduce smoke.
Water is to be sprayed on building undergoing demolition during decommissioning of reduce dust emission.
Use noise hearing protection devices when working with noisy equipment or noisy environment.
Use serviceable equipment with low noise emission.
Instruct truck/machinery operators to avoid raving engines.
Noise reduction/ hearing protection devices when working with noisy equipment.
Use of noise protection (ear muff) during demolition.
Provide communal solid waste collection containers (skip) for the collection and storage prior to appropriate disposal.
County Government/NEMA to provide waste dumping site.
Engage a NEMA registered waste collection firm.
Construct a paved containment for storage of oils and other Itquid chemicals being used in the construction site.
Use of construction site barrier tapes to isolate the site(working) area to bar intruders from accessing the area in case of a dropping object.
Appropriate head, hand and foot protection
(PPE) during the manual clearing of vegetation and construction activities.
Adopting ergonomic work flow designs that fit physical tasks to employees und not vice versa. Maintain work productivity.
Construction site visitors require appropriate safety gear.
Testing of structures for integrity prior to undertaking work.
Implementation of fall protection including induction on climbing techniques and use of fall protection measures.
Provision of harnesses and scaffolds — for working at heights.
Adoptng ergonomic work flow designs that fit physical tasks to employees and not vice versa while maintaining a balance with productivity.
Sensitize workers and community on sexually transmitted diseases especially STIs and
HIV/AIDS which is spread — through socialization and unprotected sex.
Sensitize workers on use of protection facilities like mosquito nets.
Provide first aid facilities at the site.
Provide firefighting equipment at the construction site area.
Contractor staff to be sensitized on firefighting equipment use.
No burning of materials is to be permitted at the site.
Impact Mitigation Measure
Pollution of © No disposal of domestic waste at the project surface and site.
groundwater _ . .
* Provision of used oil containers at a central point.
* Use of waste bins/proper waste management.
¢ Pave parking arca for trucks and direct drainage to containment.
Dangers of * Contractor to be strictly advised not to engage having child any underage persons(under 18 years of age) labour issues to perform any form of work at the site during arising construction.
* Contractor will be required to comply with the Employment Act, 2007.
Vehicular ¢ Employ traffic marshals to control traffic in traffic and out of site.
© Ferry building materials during off-peak hours.
° Provide traffic control signs to notify motorists and general public about the development.
* Enforce speed limuts for construction vehicles especially along the roads leading to the site.
¢ Employ well trained and experienced drivers.
* Contractor will develop and implement a
Traffic management plan to mitigate possible accidents.
Potential * Establish a grievance redress mechanism that conflict is easy to access for neighbours and stakeholders to report their concerns as they happen.
* Continuous communication between the developers and the stakeholders on the progress of the project and its effects.
Water use and = * = During construction phase. use water increased economically to avoid wastage.
demand .
* Conducting regular water system audits to identify and rectify any possible water leakages.
° Provide additional source of water to reduce pressure on the existing water source. E.g.
through rainfall harvest, and borehole drilling.
* Incorporate water harvesting for landscaping and cleaning communal areas.
* Implement water saving devices in the washrooms e.g. dual flush toilets, automatic shut-off taps, etc.
Insecurity * Proper design incorporating lighting to improve security.
* Liaise with the administration units such as the police and the area chief to provide regular patrols to protect the residents.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be emailed to dgnema@nema go.ke
MAMO EP. MAMO, Director-General, MR/3235387 National Environment Management,
MAMO EP. MAMO,
Director-General, National Environment Management,.
Extracted Entities (1)
previous_gazette_ref
1366
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO EP. MAMO
- Title
- Director-General, National Environment Management,
- Ministry
- Ministry of Environment And Forestry
- Page
- 75
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXXIV No. 26
Published 1st January 2022