GAZETTE NOTICE NO. 1350
PURSUANT to Clause 5 of Part II of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of plus 1.74 cents per kWh for all meter readings taken in February 2022
Information used to calculate the WRMA levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above IMW =5.00 Kenya cents per KWh
Hydropower Plant Units Purchased in January, 2022 (kWh)
Gitaru 71,270,540
Kamburu 36,113,310
Kiambere 94,862.480
Kindaruma 15,755,040
Masinga 16,765,540
Tana 7,926,271
Wanjii 3,224,350
| Sagana 712,479
Turkwel 54,464,600
Gogo -
Sondu Miriu 11,916,000
Sangoro 3,690,670
Regen-Terem 747570
Hydropower Plant Units Purchased in January, 2022 (kWh)
Chania 33,205
Gura 1,264,042
Metumi 883.740
Total units purchased from hydropower plants with capacity equal to or above IMW = 319,629,837 kWh
Total units generated and purchased (G) excluding exports in January, 2022 = 1,056,013,666 kWh.
DANIEL K. BARGORIA, MR/3253364 Director-General.
Extracted Entities (1)
previous_gazette_ref
1350
Details
- Signed By
- DANIEL K. BARGORIA
- Title
- Director-General
- Date Signed
- 11th February 2022
- Page
- 19
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXXIV No. 26
Published 1st January 2022