GAZETTE NOTICE NO. 159

PURSUANT to Clause 5 of Part III of the Schedule of tariffs 201 8, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.74 cents per kWh for all meter readings taken in January 2022. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above IMW_ =5,00 Kenya cents per KWh Hydropower Plant Units Purchased in December, 2021 (kWh) Gitaru 75,978,530 Kamburu 38,541,000 Kiambere 95,341,460 Kindaruma 18,054,170 Masinga 13,056,960 Tana 13,549,249 Wanjii 1,508,908 Sagana 993,527 Turkwel 49,446,500 | Gogo = Sondu Miriu 20,266,000 Sangoro 6,419,230 Regen-Terem 1,176,958 Chania 58,168 Gura 2,873,081 Metumi 1,010,300 Total units purchased from hydropower plants with capacity equal to or above [MW = 338,274,041 kWh Total units generated and purchased (G) excluding exports in December, 2021 = 1,040,948,722 kWh DANIEL K. BARGORIA, MR/3253365 Director-General,

Extracted Entities (1)

previous_gazette_ref

159

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General,
Page
20
Extraction Method
ocr-fallback