Back
REGULATION 100% confidence via ocr-fallback

GAZETTE NOTICE NO. 1190

GAZETTE NOTICE NO. 1190

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Tsavo Fedha Limited, proposes to develop residential apartments comprising of a single 12-storey block with a total of 332No. apartment units (172No. studio apartments, 136No. superior studio apartments, 12No. convertible apartments and 12No. one bedroom apartments), 12No, shops, basement parking, guard house, protected dustbin cubicles, driveways, and other associated facilities and amenities on L.R. No. Nairobi Block 97/245, off Fedha Road, Embakasi Sub-county, Nairobi City County. The following are the anticipated impacts and proposed mitigation measures. Impacts Proposed Mitigation Measures Soil disturbance ¢ Control earthworks and compact loose soils. * Ensure the geo-technical survey is conducted before commencement of any excavations, * Install drainage structures properly, ¢ Landscaping on project completion. * Control and manage — excavation activities. » Control activities especially during rainy conditions. * Provide soil erosion control and conservation structures/means where necessary. «Ensure standard appropriate practices on the provided gardens. Change in hydrology * Proper installation of drainage structures commensurate with the new development. * Install cascades to break the impact of water flowing in the drains. ¢ Ensure efficiency of drainage structures through proper design and maintenance. ¢ Provide gratings to the drainage channels. Liquid waste e Ensure sanitary facilities are kept clean always through regular cleaning. « Ensure regular maintenance of foul water drainage works at the premises to prevent clogging and _ fore-stall breakdowns. * Frequent monitoring of the internal drainage system. Increased energy use ¢ Solar energy will be used as an alternative source of energy. ¢ Use energy efficient appliances such as LED bulbs for lighting. ¢ Switch off electrical appliances when not in use. * Regular maintenance of all the electrical components. * Regular inspection and maintenance of the solar panels. Noise pollution ¢ Erect suitable barriers to contral noise. * Sensitize drivers of construction machinery on effects of noise. ¢ Maintain plant equipment (if present). ¢ Construction activities to be restricted to daytime. ¢ Workers in the vicinity of or involved in high-level noise to wear safety and protective gear. ¢ Work to be confined between 8 a.m. and 5 p.m. weekdays and 8 a.m. to 1 p.m. on Impacts Proposed Mitigation Measures weekends. There should be no construction works on Sundays. Solid waste ¢ Use of an integrated solid waste management system through a hierarchy of options: source reduction, recycling, composting and reuse, will facilitate waste handling. * Ensure segregation of waste (organic and inorganic) at source. * Provide clearly marked dustbins cubicles to serve the specified use. * Ensure that wastes generated are efficiently managed through recycling, reuse and proper disposal procedures. ¢ Engage services of a registered NEMA waste handler to dispose the waste regularly at approved disposal points. Oil pollution ¢ Proper storage, handling and disposal of new oil and used oil wastes as per waste regulations. * Maintain plant and equipment to avoid leaks. * Maintenance of construction vehicles should be carried out in the contractors yard (off the site). * Provide oil interceptors along the drains leading from car park and potentially oil risk areas. Water resources * Management of water usage. Avoid unnecessary wastage. ¢ Recycling of water at the construction phase where possible. Make use of roof catchments to provide water ie for general purposes. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126-00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/3235117 National Environment Management.

Dated the 4th February, 2022.

MAMO B. MAMO,

Director-General, National Environment Management.

Extracted Entities (1)

previous_gazette_ref

1190

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management
Date Signed
4th February 2022
Page
25
Extraction Method
ocr-fallback