GAZETTE NOTICE NO. 717
GAZETTE NOTICE NO. 717
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No.8 of 1999)
NOTIFICATION
PURSUANT to regulation 21 of the: Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Kenya Railways (KR) proposes to rehabilitate
465km Longonot-Malaba (MGR) section to facilitate safe and efficient operation of this line. The Longonot-Malaba (MGR) Section railway line rehabilitation is located at the Rift Valley and westet
Kenya.
The following are the anticipated impacts and proposed mitigation measures:
Expected _— Negative
; Recommended Mitigation Measures impacts
CONSTRUCTION/ RENOVATION PHASE
Solid waste © Quantify the building materials generation correctly to avoid wastage.
* Have regular disposal of waste generated.
* Store materials properly to avoid wastage by damage.
* Materials to be reused or recycled where possible.
* Wastes generated during the renovation and construction phase will be disposed of as stipulated in the EMCA(Waste Management)
Regulations, 2006.
* Conduct training for waste management, such as_ waste disposal and segregation practices.
Asbestos roof * Dispose all Asbestos Containing removal Materials according to WBG/IFC
EHS Guidelines NEMA
Guidelines/ requirements.
© Use recommended PPE.
* Conduct Risk Assessment before removal of ACMs.
* Keep an updated inventory of all
ACMs in the work place.
° Notify NEMA by filling in the notification form.
¢ Ensure that all asbestos containing materials are clearly marked and visible.
* Develop safe work procedures.
* Keep accurate and complete records regarding asbestos management.
Noise pollution ¢ Use low noise machinery.
¢ Ear muffs to be given during construction.
* Use properly maintained machines.
¢ Switch off noisy machinery when not in use.
* Restrict noisy activities/machines to daytime.
* Regular maintenance of machinery.
Loss of vegetation * Except to the extent necessary for establishing the operation site and carrying out the excavation works, vegetation shall not be removed, damaged or disturbed nor should any unauthorized cutting of vegetation take place.
Expected —_ Negative impacts
Land degradation
Alteration of the natural drainage system
Recommended Mitigation Measures
¢ Vegetate and mulch progressively as each section of works is completed. The interval between clearing and vegetation should be kept to an absolute minimum.
* Avoid wherever possible clearing areas of highly erodible soils and steep slopes which are prone to water and wind erosion.
© Embank slopes to avoid erosion.
¢ Improve the existing natural drainage systems.
* Monitor the natural flow system during heavy rains and make improvements where necessary.
* Clear blocked drainage channels by installing open culverts.
* Provide safety and protective clothing to workers.
¢ Use machines and appliances that are well maintained and make sure that the handlers are well trained.
* Have an emergency response for all kinds of emergencies plan ready at the site at all times.
© Train workers on safety measures.
* Put up signs and posters to warn people of hazardous material and dangerous appliances and machinery.
* Contractor to provide clean and adequate sanitation facilities for the workers at all times.
¢ Contractor shall also provide clean drinking water at the construction site for his workers at all times.
* Maintain a continuous awareness program on health issues related to
STDs and HIV/AIDS at the market, e.g. installing posters at the market.
OPERATION PHASE
Staff safety
Worker health and sanitation
HIV/AIDS, STDs
Solid waste generation
Energy consumption
* Provide solid waste handling facilities such as waste bins across the vessel and ensure that they are often emptied to enhance maximum cleanliness.
¢ Ensure that solid waste generated, is regularly disposed of appropriately at authorized dumping sites.
* Ensure that facility manages its waste efficiently through recycling, reuse and proper disposal procedures.
*« Appoint a NEMA licensed waste handler.
¢ Conduct training for waste management, such as waste disposal and segregation practices.
* Switch off electrical equipment, appliances and lights when not being used.
28th January, 2022 THE KENYA GAZETTE 303 ine cied Negative Recommended Mitigation Measures ino ected Negative Recommended Mitigation Measures
¢ Install energy saving fluorescent * Use machines and appliances that tubes at all lighting points within are well maintained and make sure the port and vessel which consume that the handlers are well trained.
higher electric energy. .
* Train workers on safety measures.
Accidental spills * Reporting of all environmental | .
incidents to the relevant * Put up signs and posters to warn authorities. people of hazardous material and dangerous appliances and
* Develop and implement a Spill machinery.
Prevention and Response Plan . . . a
(SPRP). Traffic disruption/ * Installation of visible St. Andrews level crossing level crossing signage for road
* Have adequate spill kit equipment collisions user.
to handle large cases of oil spills. _
* Speed restrictions near level
* Any contaminated soil and clean- crossings.
Solid waste
Hazardous waste
Waste water
Noise
Storage of hazardous
Fire risks
Staff safety and welfare up materials should be collected and placed in a labelled container for disposal off-site through by licensed contractor.
Train staff on transportation of dangerous goods and safe working procedures.
Appoint a NEMA _iicensed waste handler.
Compost biodegradable waste for use on flower gardens as manure at the stations where possible.
Segregate hazardous waste.
Appoint a NEMA _iicensed waste handler for safe disposal of hazardous waste.
Ensure waste water is disposed of in compliance with the EMCA
(Waste Water) Regulations, 2006.
Regular maintenance of locomotives.
Avoid untiecessary revving and idling of engines.
Provide
PPE.
staff with appropriate
Ensure all hazardous materials
(including fuels) are stored in banded/secure enclosures at the railway stations.
Ensure that each hazardous material has a copy of material safety data sheet (MSDS) from manufacturer.
Label each accordingly.
Storage container
Ensure that only minimum required quantities of hazardous substances will be stored at the sites/ stations.
Install Firefighting equipment.
Ensure firefighting equipment are inspected semi annually.
Conduct regular fire drills.
Appoint fire marshals.
Display emergency numbers on the notice boards.
Provide safety and protective clothing to workers.
¢ Installation of rumble strips on the roads near level crossings.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Nakuru County.
(d) County Director of Environment, Uasin Gishu County.
(e) County Director of Environment, Kakamega County.
(f) County Director of Environment, Bungoma County.
(g) County Director of Environment, Busia County.
(h) County Director of Environment, Baringo County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO, Director-General, MR/3274313 National Environment Management Authority.
Dated the 28th January, 2022.
MAMO B. MAMO,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
717
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No.8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 28th January 2022
- Page
- 51
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXXIV No. 18
Published 1st January 2022