Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 10542
GAZETTE NOTICE NO. 10542
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on latest available data, WASREB has determined an upward tariff review for NARUWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of NARUWASCO that the approved tariffs for the four financial years, 2023/2024, 2024/2025, 2025/2026 and 2026/2027 shall be as follows:
1.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2023/2024 to 2026/2027
Customer Category
Consumption Block in M³ Approved Tariff (KSh/M3)
Domestic/Residential 1-6 88
7-20. 95
21-50 105
51-100 110
101-300 120
>300 140
Multi-Dwelling Units Per M3 95
Commercial/Industrial/Government/Institutions 1-50 95
51-100 125
101-300 145
>300 155
Schools, Universities and Colleges 1-600 95
601 - 1200. 100
>1200 105
Bulk Water Supply Per M3 35
Water Kiosks Per M3 50
Customers with non- functional meters shall be billed based on the average of the last three months’ bills.
1.2 Sewerage Tariff Structure for the period 2023/2024 to 2026/2027
(a) Consumers with a Water Connection
Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
(b) Consumers without a Water Connection
Sewerage consumers without a water connection shall be charged as follows:
• Single Dwelling Domestic unit: KSh. 300 per month.
• All other categories: 75% of the volume of water consumed as per the metered source at the rates specified (in 1.1) above.
1.3 Indexation of the Approved Tariff
The utility’ approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July, 2024.
1.5. Miscellaneous Charges
These shall be as follows:
Item/ Service Charge (KSh.)
Water Deposit
Category of Consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar, restaurants less than 15 m3 4,000
Bar, restaurants more than 15 m3 6,000
Hotel less than 150 m3 12,000
Hotel more than 150 m3 15,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools less than 200 m3 10,000
Schools and other institutions more than 200 m3 20,000
Minor construction sites more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and 300 m3 50,000
11th August, 2023 THE KENYA GAZETTE
Item/ Service Charge (KSh.)
Heavy industries more than 300 m3 100,000
Water Kiosks 5,000
*Customers with only a sewerage connection to be charged a deposit equivalent to water deposit
Other Charges
Service
New water connection fee 2,500
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within WSP Service Area for all consumers
Sale of water per m3 at bowsing point (own tanker) 95
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection– Residential/ Domestic 2,500
Sewer Connection– Commercial, Government, schools, Universities and
Colleges
5,000
Sewer Connection– Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee (At mains) 15,000
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per truck per month
Penalties
Illegal water connection, –Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection– Commercial, Industry, Construction 100,000
Illegal sewer connection– Domestic, Government, Schools, Universities and Colleges
30,000
Self-reconnection after cut off for non-payment 5,000 and billing to be backdated from date of cut off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Analysis of Cost Structure
Below is the summary of the approved cost structure that makes up the total costs to be incurred by NARUWASCO during the tariff period:
Expenditure Item 2023/2024 2024/2025 2025/2026 2026/2027
Operations 290,982,672 308,470,001 327,154,308 347,179,615
Maintenance 18,700,000 20,570,000 22,627,000 24,889,700
Regulatory Levy (WASREB) 19,880,180 21,868,197 24,055,017 26,460,519
Total O and M Costs 329,562,853 350,908,197 373,836,324 398,529,834
Investment Costs 79,128,771 74,954,525 60,776,331 41,648,090
Debt Repayment 10,120,875 9,943,727 9,766,579 9,589,430
Total Costs 418,812,499 435,806,449 444,379,234 449,767,354
Total Billing (Kshs) 443,645,883 462,192,011 480,765,407 499,367,434
Collection Efficiency (%) 95% 95% 95% 95%
Projected Revenue 421,463,589 439,082,410 456,727,137 474,399,062
O and M Cost Coverage 128% 125% 122% 119%
Total Cost Coverage 101% 101% 103% 105%
3.0 Conditions attached to the tariff approval.
The conditions attached to this approval which shall form part of the license conditions of Nakuru Rural Water and Sanitation Company are:
(i) Service Delivery Conditions attached to the Tariff.
Target 2023/2024 2024/2025 2025/2026 2026/2027
Water Coverage (%) 79% 81% 83% 85%
Water Quality Standards (%) 100% Compliance with Standards
Personnel Expenditure as % of O and M 44% 43% 43% 42%
Non-Revenue Water 52% 50% 48% 46%
Hours of Supply (Hrs.) 19.5 20.5 21.5 22.5
Staff per 1000 connections 6 6 5 5
Maintenance Expenditure as % of O and M 6% 6% 6% 6%
Metering ratio (%) 100% 100% 100% 100%
Collection Efficiency (%) 95% 95% 95% 95%
Resale at Kiosk KSh. 2.00 per 20 litres.
Tariffs at kiosks must be displayed at strategic points for public awareness
(ii) Annual budgets: The utility shall adhere to the budgetary levels set in the approved tariff.
3450 3450
(iii) Surplus: The surpluses projected to be realised shall be used on priority infrastructure projects identified by NARUWASCO and approved by
WASREB.
(iv) Customer re- categorisation for billing: NARUWASSCO will separate individual domestic accounts from Multi-Dwelling Units (MDU) accounts and bill as per the approved tariff.
(v) Creation of distinct water and sewerage cost centres: NARUWASCO will create separate water and sewerage cost centres and maintains distinct record of operations of the two centres.
(vi) Repayment of Loans: NARUWASCO shall remit monthly loan repayments to Central Rift Water Works Development Agency (CRWWDA) as detailed below: -
2023/2024 2024/2025 2025/2026 2026/2027
Loan Repayment Amount (Kshs.) 10,120,876 9,943,727 9,766,579 9,589,431
Evidence of loan repayment to CRVWWDA shall be submitted to WASREB by the 10th day of the following month.
(vii) Reporting: The utility shall submit to WASREB a quarterly tariff performance report in the prescribed format. WASREB will carry out tariff implementation review at the end of each year of implementation.
(viii) Investments: The utility shall undertake the investments in Annex 1 and submit quarterly progress reports.
Annex 1
No. Investment Total Cost 2023-2024 2024-2025 2025-2026 2026-2027
1 East Gate Water Supply Project 54,038,093 54,038,093
2 Olenguruone Water Supply Project 42,776,331
37,000,000 5,776,331
3 Subukia Water Supply Project 41,357,896
30,000,000 11,357,896
4 Keringet Water Supply Project 37,073,021
15,000,000 22,073,021
5 Sinendet Water Supply Project 28,217,173
10,000,000 10,000,000 8,217,173.00
6 Haraka Water Supply Project 53,045,203 25,090,678 27,954,525
Total Investment costs
79,128,771 74,954,525 60,776,331 41,648,090
JULIUS ITUNGA, Ag. Chief Executive Officer, MR/5166662 Water Services Regulatory Board.
Dated the 11th August, 2023.
JULIUS ITUNGA,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
10542
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- JULIUS ITUNGA
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 11th August 2023
- Page
- 39
- Extraction Method
- regex
Source Gazette
Vol. CXXV No. 180
Published 8th May 2023