Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 1306
GAZETTE NOTICE NO. 1306
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance to the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on latest available data, WASREB has determined an upward tariff review for
KIAWASCO is justified in order to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of KIAWASCO that the approved tariffs for the three financial years 2022/23, 2023/24, and 2024/25 shall be as follows:
1.0. Approved Tariff Structure
1.1 Water Tariff Structure for the period 2022/2023 to 2024/2025
Customer Category Approved
Domestic/Residential Consumption Block in M³
Tariff
(KSh/M3)
1-6 68
7-20. 113
21-50 118
51-100 125
101-300 130
>300 150
Commercial/Industrial
1-50 113
51-100 125
101-300 130
>300 150
Government Institutions
1-50 113
51-100 125
101-300 130
>300 150
Schools, Universities and
Colleges
1-600 80
601 - 1200. 100
>1200 120
Bulk Water Supply/Water
Projects
Per M3 50
Multi- Dwelling Units Per M3 120
Water Kiosks Per M3 35
1.2 Sewerage Tariff Structure for the period 2022/2022 to 2024/2025
(a) Consumers with a Water Connection
Customer Category Approved Tariff
Domestic
Consumption Block in m³
(75 % of water consumed)
Tariff
1-6 45
7-20. 65
21-50 75
51-100 80
101-300 90
>300 100
Commercial/industrial/Gover nment
1-50 74
51-100 80
101-300 90
>300 100
Schools, Universities and colleges
1-600 60
3rd February, 2023 THE KENYA GAZETTE
Customer Category Approved Tariff
601 - 1200. 70
>1200 80
Multi dwelling Units Per M3 65
(b) Consumers without a Water Connection
Sewerage consumers without a water connection shall be charged as follows:
• Domestic (Per Single dwelling unit): KSh. 350 per month
• All other categories: 75% of the volume of water consumed as per the metered source at the rates specified (in 1.2(a)) above
Note: All disconnected accounts (water only, sewer only and water + sewer shall be charged based on the average of the last three months’ charges before the disconnection.
1.3 Miscellaneous Charges
These shall be as follows:
Item/ Service Charge (KSh.)
Water Deposit
Category of Consumer Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar, restaurants less than 15 m3 4000
Bar, restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than
150 m3
12,000
Hotel class “A” and “B” more than
150 m3
15,000
Hotel class “C” and ‘D’ less than 150 m3
18,000
Hotel class “C” and ‘D’ more than
150 m3
20,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3
20,000
Schools less than 200 m3 10,000
Minor construction sites more than
200 m3
15,000
Major construction sites more than
300 m3
50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and300 m3
50,000
Heavy industries more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection to be charged a deposit equivalent to water connection
Other Charges
Service
New water connection fee –
Connection size: ½ inch to 1 inch
2,500
New water connection fee –
Connection size: 1.5 inches to 3 inches
7,500
New water connection fee –
Connection size above 3inches
15,000
Water Reconnection fee – at meter point
1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within
KIAWASCO area for all consumers
Sale of water Per M3 at bowsing point (own tanker)
Replacement of stolen or damaged meters
100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/
Domestic
5,000
Item/ Service Charge (KSh.)
Sewer Connection- Commercial, Government, schools, Universities and Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer
For turning on the supply otherwise than in respect of a first connection
Exhauster Services (Company
Exhauster)
5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system)
15,000 per Truck per month
Penalties Illegal water connection, -
Commercial, Industry, Construction
(Fraud)
100,000 plus estimated consumption during the period of the illegality
Illegal water connection, (Fraud) –
Domestic
30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection-
Commercial, Industry, Construction
100,000
Illegal sewer connection- Domestic, Government, schools, Universities and Colleges
30,000
Self-reconnection after cut off for non-payment
5,000 and billing to be backdated from date of cut off
Surcharge for tampering with meters
(this to include meter removal, reversing of meter etc)
10,000
Surcharge for direct suction of water from the supply line using a pump
10,000
2.0 Analysis of Cost Structure
Below is the summary of the projected Annual cost structure that makes up the total costs to be incurred by KIAWASCO during the tariff period:
Expenditure
Item
Base Year
2020/2021 2021/2022 2022/2023 2023/2024 2024/2025
Operations 126,272,548 151,754,400 172,838,360 196,042,822 223,862,811
Maintenance 64,448,155 45,355,800 47,361,518 50,046,113 51,772,621
Regulatory
Levy 7,685,375 10,401,336 12,439,441 13,928,235 14,664,296
Other Levies 1,710,493 2,640,000 3,036,000 3,491,400 4,015,110
Total O&M
Costs (Ksh) 200,116,571 210,151,536 235,675,319 263,508,570 294,314,838
Minor
Investments 2,571,400 38,130,000 47,929,750 44,451,750 42,516,250
Debt
Repayment - - 22,601,773 22,389,881 22,177,990
Total Costs
(Ksh) 202,687,971 248,281,536 306,206,842 330,350,201 359,009,078
Total Billing
(KShs) 212,043,661 260,033,405 310,986,024 348,205,886 383,925,038
Collection
Efficiency (%) 89% 89% 95% 95% 95%
Projected
Revenue (Ksh) 188,718,858 231,429,730 295,436,723 330,795,592 364,728,786
O&M Cost
Coverage (%) 94% 110% 125% 126% 124%
Total Cost
Coverage (%) 93% 93% 96% 100% 102%
3.0 Conditions attached to the Tariff Approval
The conditions attached to this approval which shall form part of the license conditions of Kiambu Water and Sanitation Company are:
(i) Service Delivery Conditions attached to the Tariff
454 454
Target 2021/2022 2022/2023 2023/2024 2024/2025
Water Coverage
(%) 80 82 84 86
Water quality standards (%) 100% Compliance with Water Quality Standards
Non-Revenue
Water (%) 35 33 31 29
Hours of Supply
(Hrs.) 18 20 22 24
Staff per 1000 connections 6 5 5 5
Metering ratio
(%) 100 100 100 100
Collection
Efficiency (%) 93 95 95 95
Resale at Kiosk Regulate resale by kiosk vendors at Ksh. 2 per 20- litres. Tariffs at kiosks must be displayed at strategic points for public awareness
(ii) Annual budgets: The utility shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses projected to be realised shall be set aside to implement priority service delivery capital projects. KIAWASCO shall be required at the end of every financial year to identify the priority project to be implemented and obtain approval from WASREB.
(iv) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their source of water as part of Corporate Social Responsibility.
(v) Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided.
(vi) Creation of distinct water and sewer cost centres:
KIAWASCO will ensure it creates separate water and sewer cost centres and maintains distinct record of operations of the two centres.
(vii) Customer re- categorisation for billing: KIAWASCO will separate individual domestic accounts from Multi-Dwelling
Units accounts and migrate consumer billing data within the first 3 months of tariff approval and implementation of the tariff. The detailed report should be submitted to
WASREB.
Pursuant to this, the WSP shall bill all MDU / Gated communities at the recommended MDU/ Gated Community tariff for Water, Sewerage and other Miscellaneous charges specified in this tariff.
(viii) Ring-Fencing of Capital Expenditure: The WSP to open a separate account for capital component of the tariff, to deposit the appropriate share of revenue into this account which is only to be used for capital expenditure and repayment of loans as provided for in the approved tariff.
(ix) Tariff Assessment: WASREB will carry out a tariff implementation review within the first 12 months of approval and implementation during which a joint assessment with the utility on the trend in Billing (KSh) shall be carried out and status of implementation of the tariff evaluated.
Additionally, an assessment will be carried out on progress of the separate water and sewer cost centres and maintenance of distinct record of operations of the two centres.
(x) Debt Repayment: KIAWASCO will shall remit monthly loan repayments as detailed below:
KIAWASCO Loan
Repayment Plan
Year 0 Year 1 Year 2 Year 3
2021/2022 2022/2023 2023/2024 2024/2025
Recommended debt repayment per annum
- 22,601,77
22,389,881 22,177,99
Evidence of loan repayment to AWWDA shall be submitted to
WASREB monthly by the 10th day of the following month.
(xi) Investments: The utility shall undertake the investments in
Annex 1
ANNEX 1—INVESTMENTS
SUMMARY OF CAPITAL INVESTMENTS TO BE CARRIED
OUT BY KIAMBU WATER AND SANITATION COMPANY
LIMITED FOR THE PERIOD 2022/23 – 2024/25
Recommended Investments 2022/2023 2023/2024 2024/2025
Water Meters and New
Connections fittings
7,740,000 8,600,000 9,460,000
Meter replacements 5,000,000 5,200,000 5,400,000
Computers 775,000 800,000 825,000
Laptops 775,000 800,000 825,000
Shared Printer - - 600,000
Thermal Printer - 110,000 -
Motorbikes 1,440,000 - -
Smartphones Rugged 264,000 276,000 300,000
Intercom: Switch Board and
Headsets
- - 500,000
Billing Software/ERP system
- Module 1 Billing, CRM and
HR
5,000,000 3,500,000 3,500,000
Document Management
System
- - -
Server - - 750,000
Server Cabinet - - -
Centralized Power back up system
- - -
Smart TV - - 150,000
Public Address system inclusive of a generator
- - 300,000
Standby Generator - - 1,500,000
CCTV - Riara & Kamiti 600,000 1,200,000 -
Paper shredder - - 80,000
Solarization of Kamiti intake Digital cameras - 120,000 120,000
Furniture set - Desk and
Chair
94,500 165,000 105,000
Steel file Cabinets 63,000 66,000 70,000
Double Cab Pickup (3No) - 5,000,000 5,000,000
Survey equipment -Total station
1,000,000 1,000,000 -
Lab equipment set 750,000 350,000 750,000
Water networks extensions/ rehabilitations (86.5kms)
Ndumberi ward water distribution network
(19.9km)
12,147,000 - -
Kiambu township ward water distribution network
(36.1km)
12,281,250 - 12,281,250
Riabai ward water distribution network
(12.5km)
- 5,566,250 -
Tinganga ward water distribution network (18km)
- 11,698,500 -
Grand Total 47,929,750 44,451,750 42,516,250
JULIUS K. ITUNGA, MR/4245732 Ag. Chief Executive Officer.
Dated the 3rd February, 2023.
JULIUS K. ITUNGA,
Ag. Chief Executive Officer.
Extracted Entities (1)
previous_gazette_ref
1306
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1)
- Signed By
- JULIUS K. ITUNGA
- Title
- Ag. Chief Executive Officer
- Date Signed
- 3rd February 2023
- Page
- 32
- Extraction Method
- regex
Source Gazette
Vol. CXXV No. 26
Published 9th January 2023