Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 127

GAZETTE NOTICE NO. 127

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, The Reveal Group Limited, proposes to establish a mixed use development (Residential-Cum-Commercial) development, basement used for parking, ground floor plus typical 15 floors for residential purposes comprising of 360 studios units and 105 one- bedroom units giving a total of 465 units, associated amenities and facilities on plot on Plot L.R. No. 209/6797, located along Kabarnet Road, in Kibra Constituency, Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impacts Mitigation Measures Noise pollution • Vehicles to move at low speeds while within and around the site range. • Workers are encouraged to behave in an orderly manner. • Exposed workers will be provided with protective gear (noise muffs). • Grade sites to beneficial levels to be maintained and compensate appropriately the existing topography. • Maintain the cleanliness of the proposed development and its environs. • Use machines that are well serviced, oiled and maintained. Dust and particulate emissions • Workers to be provided with protective gear. • Provision of Construction masks and aprons as advised by DOSHS laws. • Observe EMCA (Air Quality Regulations, 2008). • Pursue good practices in energy use during operations and sensitize staff. • Provide appropriate personnel protective equipment to site workers. • Ensure that the manuals of operations are followed to the latter to avoid possible accidents. • Ensure netting is done all around the proposed project as construction takes shape. Effluent/waste waters • Ensure connection to Sewer line network has no spillage. • Dig drainage channels for water runoff. • Ensure that the rubbish bins are emptied whenever its full. • Get Approvals from relevant authorities regarding connections. • Do regular inspections along the draining lines to ensure no leakages. 6th January, 2023 THE KENYA GAZETTE Impacts Mitigation Measures Vegetation regeneration • Do landscaping on completion of the proposed project. • Plant pot ornamental trees around the compound to improve the aesthetic appeal of the building. • Ensure the management company maintains all vegetation cover regularly. Solid waste generated • Ensure that all solid wastes are collected and segregated. • Reuse those materials that can be reused. • Contact a licensed solid waste transported to collect solid materials leakages and/or spillages. • Minimize waste at source by clear and harmonized procurement materials. Fire hazards • Ensure fire extinguishers are stationed in visible places. • Security personnel and occupants to be trained in firefighting skills. • Drilling exercise to be conducted regularly. • Train some of the premises maintainers’ team on how to use the fire-fighting equipment. Health and safety concerns • Provide personnel and passers-by signage and warnings traffic control signs and warning. • Provide for appropriate signage and warnings at work sites. • Provide appropriate personnel Protective Equipment (PPE) to site workers. • Provide for First Aid facilities as per the OSHA, 2007. Security • Guarding proposed development by reputable security firm. • No outsiders should access the property without permission from the proponent. • Partnership with the neighbours to promote serenity in the area and conserve the environment. • Ensure all staff and workers at the proposed project are properly vetted. Traffic flow • Adequate road warning signs to traffic regulations. • Erect speed pumps where necessary. • Liaise closely with other development partners and government and council’s departments to upgrade the existing road networks. Oil leaks and spills • Use well serviced machinery to minimize grease/oil leaks. • No major Servicing of the machinery at the site. • Ensure any oil leakages are dealt with immediately and site cleaned. High electricity demand • Energy conservation measures to be practiced. • Energy saving bulbs to be used in the houses. • Lights to be switched off when not in use. Impacts Mitigation Measures • Provide alternative source of power e.g. Solar panels. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126–00100, Nairobi. (b) Director–General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director–General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director–General, MR/4281149 National Environment Management.

Dated the 6th January, 2023.

MAMO B. MAMO,

Director–General, National Environment Management.

Extracted Entities (1)

previous_gazette_ref

127

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
MAMO B. MAMO
Title
Director–General, National Environment Management
Date Signed
6th January 2023
Page
40
Extraction Method
regex