Back
PROPOSED ACQUISITION
100% confidence
via regex
GAZETTE NOTICE NO. 238
GAZETTE NOTICE NO. 238
THE WATER ACT
(No. 43 of 2016)
PROPOSED ACQUISITION
IT IS notified for the general information that, pursuant to section
22 of the Water Act, 2016, the Water Resources Authority, in consultation with relevant institutions and stakeholders, has prescribed the Management Plan set out in the Schedule in respect of the Kajulu
Hills Catchment.
SCHEDULE
KAJULU HILLS CATCHMENT MANAGEMENT PLAN
PART I—PREAMBLE
Citation
1. This Plan may be cited as the Kajulu Hills Catchment
Management Plan.
Interpretation
No. 43 of 2016.
2. In this Plan, unless the context otherwise requires —
"Act" means the Waters Act, 2016;
"Authority" means the Waters Resources Authority established in accordance with the Act;
"Plan" means the Kajulu Hills Catchment Management Plan;
"catchment area" means the land from which water naturally flows into a water course.
Application of the Plan
3. This Plan shall apply in respect to the management and use of the Kajulu Hills Catchment Protected Area.
Objective
4. The objectives of this Plan shall be to —
(a) enhance implementation of existing regulations to protect the rights of all users;
(b) promote water, use efficiency that is hydrologically and economically beneficial to domestic, agricultural, and industrial water users and the environment;
(c) identify funding sources to implement water conservation programs that help to enhance water resources;
(d) ensure sustainable management and use of water resources within the sub catchment while promoting equitable sharing of water resources; and
(e) ensure the conservation of the catchment areas to improve on the"water quantity and quality.
Kajulu Hills Catchment
5. (1) The Kajulu Hills is a water catchment within the Northern
Shoreline ofiake Victoria Basin Area that comprises of —
(a) the River Awach Kajulu (Nyangori); and
(b) the River Awach Kibos.
(2) The rivers specified in sub-paragraph (1) confluence to form
Nyamasaria River which drains into Lake Victoria at the Winam Gulf through Kisumu City.
Location and size of the Protected Area.
(L. N.235 af 2021)
6. (1) The protected area is spread within Wathorego and Kadero sub-locations of West Kajulu and East Kajulu locations of Kisumu
County.
(2) Themrotected area is located 9 km to the east of Kisumu City.
The sub catchment covers an area of 5.5 km2 and is within the 1HA- sub basin of Lake Victoria South Basin Area.
Watershed Area
7. (1) The Kajulu hills is partly fed by rainfall, sub-surface flow and occasionally receives water from Lake Victoria South River during flood flows.
(2) The area of the hills that contributes surface run-off into the rivers has been delineated through the use of a GIS, software.
(3) The area measures 5.5 square kilometres out of the 858 km2 catchment area of the whole 1HA sub basin as contained in Form 1 of the Annex to this Schedule.
Criteria Adopted in Identifying Kajulu Hills for Awiection
(L.N. 170 of 2021).
8. The Authority has taken into account the considerations provided under the Seventh Schedule of the 'Water Resources
Regulations, 2021.
PART II—PROCEDURES TO BE APPLIED FOR THE
MANAGEMENT OF THE KAJULU HILLS CATCHMENT
PROTECTED AREA
Physiography
9. (1) The Kajulu Hills constitutes the raised area to the east of
Kisumu City, rising approximately 1431 m.a.s.1 from the elevation of
1156 m.a.s.l around Kisumu City, a distance of 9 kilometres from the city.
(2) The slope ranges from a low of 0.2% near the City but increasing to 5.7% near the hills, and giving an average slope of 1.7% between the city and the top of the hill.
Climate
10. (1) The climate around Kajulu Hills area is tropical with significant amount of rainfall during the year.
(2) The climate specified in sub-paragraph (1) is classified according to the Klippen-Geiger climate classification.
(3) The average temperature around Kajulu Hills is 22.2 °C with
February having the highest mean temperature of 23.9oC and June having the lowest mean temperature of 21.2°C.
(4) The table and figure under Part I of Form 1 of the Annex to this Schedule shows the monthly average temperatures around Kajulu
Hills.
Rainfall
11. (1) The presence of the elevated land mass and the Lake
Victoria water body results in high rainfall. The rainfall pattern in the area is bi-modal with 2 major peaks in April and November with continental rains in between the peaks and with no alctolute dry period in between. MAM rainfall accounts for 37% of the annual precipitation with rainfall accounting for 33%— of the annual precipitation of 1724 mm. The balance is accounted for by the continental rains in between the 2 major rainy seasons.
(2) The driest month is February with a mean precipitation of 75 mm while the wettest if April with a precipitation of 272 mm.
(3) The month with the highest relative huntidity is May (73%).
The month with the lowest relative humidity is Fehguary (48%). This is consistent with moisture availability with Februaryi being the driest, having the lowest moisture availability while due, to the rains in
April/May, the moisture availability is highest in.lvliay, (4) The table and figure set out in Part II of Form 1 of the Annex to this Schedule indicates the mean monthly rairfall and humidity around Kajulu Hills.
Vulnerability of the Water Resource
(L. N .235 of 2021)
12. (1) The encroachment and human activities within the Kajulu hills catchment land through cultivation, clearirt of indigenous vegetation and the planting of exotic tree species as resulted into reduced recharge into the ground, lowering of the water table and a decrease in the discharge of the rivers.
(2) In order to have a clear understanding of the surface water resources availability in the Kajulu hills catchment, the available data has been used and collated with the existing daily discharge data.
Nyamasaria river is gauged at RGS 1HA15 located at the confluence of Awach Kajulu (Nyangori) and Awach Kibos rivers (coordinates
N00.047, E034.804) while Awach Kajulu (Nyangori) is gauged at
RGS 1HA14 located at coordinates (N00.067, E034.814) 2.6 kilometres upstream of RGS 1HAI5. The catchment area upstream of the 1HA14 station is 104 km2 and the station has been used to develop surface water availability scenario for the Nyamasaria River.
THE KENYA GAZETTE
13th January, 2023
(3) The table': set out in Part III of Form 1 of the Annex to this
Schedule shows the flow duration analysis for Awach Kajulu
(Nyang'ori) Riyer at RGS IHA14.
The Water Resoarce Quality Objectives and the Current Status of the
Water Resource
13. (1) Seen& 20 of the Act requires the Authority to prescribe the criteria for classifying water resources for the purposes of determining water resources quality objectives for each class of water resource.
(2) The Resource Quality Objectives represent the desired status of the resource, covering all aspects of quantity, quality, timing and aquatic biota. The RQO's are different for different classes of water resource. The objectives generally relate to the extent to which the water body is allowed to be adversely impacted by water use with respect to its natural state. Conceptually the RQO's provide a "target" condition of the-resources. Management decisions should be made such that the condition of the resource is progressively trending towards the RQCr. The status of the resource is a measure of how far the condition of the resource is from the RQO. Initially, RQOs shall be determined at the nodes where the Reserve flows are being determined.
The Class of the Water Resource
14. (1) The present aquifer classification system in Kenya is partly demand-oriented and partly geo-political and entails the following five classes—
(a) strategic aquifers: aquifers used to supply significant amounts alternatives, or where alternatives would take time and money to develop;
or proportions of water to an area where there are no
(b) major aquifers: high-yielding aquifers with good quality water;
(c) minor aquifers: moderate-yielding aquifers with variable water quality;
(d) poor aquifers: low-yielding aquifers with poor to reasonable quality water; and
(e) special aquifers: aquifers or parts of aquifers designated
'special aquifers' by the Authority.
(2) Each is further defined in terms of its status such as —
(a) satisfactory: no immediate stress, pressure or threat;
(b) alert: stress, pressure or threat identified or anticipated; and
(c) alarm: hvater levels declining, water quality declining (stress, pressure or threat identified)
(3) The Kajulu Hills sub-catchment can be classified as "Alert" as the available water is at not of adequate quality to meet the demand.
The Kajulu Hills aquifer is at the risk of pollution due encroachment of the catchment area for anthropogenic activities.
Land Uses and ;he? Potential Impact on the Water Resources
15.
(1) The area around Kajulu Hills is predominantly rural settlement with tilt main land use being cultivation and rearing of livestock.
(2) The potential impacts on the water resources as a result of human acts includes —
(a) encroachment: people have encroached water catchment areas in the upper parts of the catchment;
(b) overexploitation of available resources: the population in the area has been rapidly growing over the years. This leads to excessive pressure on available natural resources that includes water resources leading to potential water use conflicts;
(c) soil erosion: following uncontrolled fanning and other human activities, soil erosion leads to siltation and loss of top soil cover;
(d) deforestation: the forest cover around the Lake, the immediate catchmdirt areas as well as the wider catchment has been depleteci•due human activities. Forests have been cleared to give way for farmlands, settlements as well as charcoal burning and timber; and
(e) water pollution: due to excessive economic activities around the Lake, the water has been polluted. Fishermen do not have sanitation facilities within the Lake leading to open defecation.
The farms in the surrounding area use agro-chemicals which eventually find their way into the Lake and leading to pollution.
Other pollutants include solid waste that is washed into the rivers by runoff water during rains.
PART III—MEASURES FOR PROTECTION, CONSERVATION
AND REHABILITATION OF THE KAJULU HILLS CATCHMENT
PROTECTED AREA
Proscribed Activities
16. (1) The activities to be undertaken within the protected area are those with zero impact on its ecological status and integrity.
(2) The following activities are hereby specifically prohibited in the protected area--
(a) tillage or cultivation;
(b) clearing of indigenous trees or vegetation;
(c) building of permanent structures especially boreholes and houses;
(d) disposal of any form of waste;
(e) excavation of soil or development of quarries;
(f) planting of exotic species that may have adverse effect to the water resource; and
(g) land reclamation.
Catchment Protection Plan
17.
(1) In order to ensure the protection and conservation of Kajulu
Hills is achieved and sustained, several measures and strategies will be applied.
(2) The strategies referred to in sub-paragraph (1) include the following—
(a) sensitization on catchment management;
(b) revegetation of the catchment area through;
(c) indigenous and water friendly Plant Propagation;
(d) exotic species control;
(e) water storage enhancement to ease pressure on use of rivers water;
(fi rainwater harvesting tanks;
(g) water pans;
(17) regulating activities that may lead to pollution and destruction of the eco-system including charcoal burning, grazing, cultivation;
controlling abstraction limits and observing of safe yields; and
6) controlling encroachment and liaising with other relevant government agencies to facilitate cancellation of illegally acquired land title deeds.
(3) The catchment protection activities planned to be undertaken shall include those set out in Part A of Form 2 of the
Annex to this Schedule.
Conservation Plan
18. (1) The objective of the conservation plan is to protect the long- term environmental sustainability of the catchment for enhanced water resources yield and maintain its ecological functions in terms of flora and fauna.
(2)
In the development of the management programmes, care has been taken to ensure that there are explicit and logical links between the vision statement, management objectives, and the management strategies to achieve the objectives.
(3)
Each management programme is discussed in further detail as set out in Part B of the Annex to this Schedule.
Catchment Monitoring Plan
19. (1) The objective of the monitoring plan is to collect water resources data and maintain a comprehensive database on the Kajulu
Hills springs that provides information on water levels and quality of the spring's water.
(2) The actions shall include—
3 t h
J a n u a r y
, 0
3
T
H
E
K
E
N
Y
A
G
A
Z
E
T
T
E
0
( a
) e s t a b l i s h a w a t e r q u a l i t y a n d p o l l u t i o n c o n t r o l p l a n
;
( b
) w a t e r s a m p l i n g a n d a n a l y s i s
;
a n d
( c
) e s t a b l i s h a w a t e r r e s o u r c e s d a t a b a s e
(
)
T h e c a t c h m e n t m o n i t o r i n g p l a n i s s e t o u t i n
P a r t
C o f
F o r m o f t h e
A n n e x t o t h i s
S c h e d u l e
.
E s t a b l i s h m e n t a n d
O p e r a t i o n a l i z a t i o n o f
M a n a g e m e n t
S t r u c t u r e
0
.
(
)
T h e o b j e c t i v e o f t h e m a n a g e m e n t s t r u c t u r e i s t o e n s u r e t h a t t h e p r o t e c t e d a r e a i s m a n a g e d i n a s u s t a i n a b l e m a n n e r w i t h t h e i n v o l v e m e n t o f a l l s t a k e h o l d e r s u n d e r t h e l e a d e r s h i p a n d c o o r d i n a t i o n o f
W
R
A
.
(
)
T h e o b j e c t i v e s r e f e r r e d t o i n s u b
- p a r a g r a p h s h a l l b e a c h i e v e d t h r o u g h
—
( a
) s e t t i n g u p t h e m a n a g e m e n t s t r u c t u r e w i t h d e f i n e d t e r m s o f r e f e r e n c e s a n d m a n d a t e s
;
a n d
( b
) d e v e l o p m e n t o f r e s o u r c e s m o b i l i z a t i o n s t r a t e g i e s t o r a i s e f u n d s f o r o p e r a t i o n s
, m a i n t e n a n c e a n d c o n s e r v a t i o n o f t h e p r o t e c t e d a r e a s
;
(
)
O p e r a t i o n a l i z a t i o n o f t h e m a n a g e m e n t s t r u c t u r e s h a l l b e a s s e t o u t i n
P a r t
D o f
F o r m o f t h e
A n n e x t o t h i s
S c h e d u l e
.
C a t c h m e n t a n d
W a t e r
R e s o u r c e s
M o n i t o r i n g
1
.
(
I
)
T h e o b j e c t i v e o f t h e m o n i t o r i n g p l a n i s t o c o l l e c t a n d a n a l y s e
K a j u l u
H i l l s c a t c h m e n t a n d w a t e r r e s o u r c e s d a t a t o p r o v i d e i n f o r m a t i o n o n w a t e r d i s c h a r g e
, w a t e r q u a l i t y a n d c a t c h m e n t h e a l t h a s a r e s p o n s e t o h u m a n a c t i v i t i e s w i t h i n t h e n e i g h b o u r h o o d
.
(
)
T h e l i n k a g e s b e t w e e n v a r i o u s s t a k e h o l d e r s a r e c o n t a i n e d u n d e r
P a r t
E o f
F o r m o f t h e
A n n e x t o t h i s
S c h e d u l e
.
M o n i t o r i n g a n d
E v a l u a t i o n
M a t r i x
2
.
T h e m a t r i x c o n t a i n e d i n
F o r m i n t h e
A n n e x t o t h i s
S c h e d u l e s h a l l b e a d o p t e d f o r
M o n i t o r i n g a n d
E v a l u a t i o n t o c a p t u r e d e t a i l o f t h e p r o g r e s s o f i m p l e m e n t a t i o n o f t h e p l a n n e d a c t i v i t i e s
.
A
N
N
E
X
;
F
O
R
M
( p
.
2
(
)
, 1
(
)
, 0
(
)
, (
)
P
A
R
T
—
M
E
A
N
T
E
M
P
E
R
A
T
U
R
E
S
A
N
D
S
U
N
S
H
I
N
E
H
O
U
R
S
A
R
O
U
N
D
K
A
J
U
L
U
H
I
L
L
S
J a n
F e b
M a r
M a y
J u n
J u l
S e p
A p r
A u g
O c t
N o v
D e c
2
.
M e a n
3
.
2
.
2
.
2
.
2
.
2
.
2
.
2
.
2
.
2
.
2
.
M i n
.
6
.
1
.
1
.
1
.
1
.
1
.
1
.
1
.
1
.
1
.
1
.
1
.
M a x
.
9
.
3
.
2
.
2
.
2
.
2
.
1
6
.
2
.
2
.
2
.
2
.
2
.
A v
S u n
0
.
1
.
9
.
9
.
9
.
9
.
9
.
9
.
1
.
9
.
9
.
1 h o u r s
M a m
M u t t
U y
T t m p m u i m o u t
S m
S
U i k
H o u r s a n m u i
K a j u l u
H i l l s
S
2
.
I
I
, 0
, P
0
.
6
.
2
4
.
1
Z
.
<
1
0
.
} a n
F e b
M a r h p r
M a y
| u i i
J u l
A u g
S e p
O c t
N o v
D e c
■
M e a n
■
M i n
.
■
M a x
.
■
A v e r a g e
S u n h o u r s f h o u r s
)
M e a n
T e m p e r a t u r e s a n d
S u n s h i n e
H o u r s a r o u n d
K a j u l u
H i l l s
P
A
R
T
1
-
M
E
A
N
M
O
N
T
H
L
Y
R
A
I
N
F
A
L
L
A
N
D
H
U
M
I
D
I
T
Y
A
R
O
U
N
D
K
A
J
U
L
U
H
I
L
L
S
M a
J a n
F e b
M a r
A p r
L j l
J u n
J u l
A u g
S e p
O c t
N o v
D e c
T o t a l
R a i n f a l l
6
5
6
2
2
9
9
8
8
9
1
6
2
1
1
7
4
;
H u m i d i t
5
8
8
2
3
8
3
2
0
6
4
1
■
;
%
%
%
%
%
%
%
%
%
%
%
%
3
»
/ o i
!
I
K
I
-
5
1 m
\
5
- m
'
■
'
£
\
0
"
^
I
S
O s
, ™
!
0
% y
:
'
, :
5
% j
U
!
, I
0
%
^
0
5
% h
-
0
%
^
| a n
F e b
M a r
A p r
M a y l u n
| u l
A u p
S e p
O c t
N o v
.
.
D e c u
, i
R a
M a i l
•
"
H u o i
K i i t y
P
A
R
T
1
—
S
U
R
F
A
C
E
W
A
T
E
R
A
V
A
I
L
A
B
I
L
I
T
Y
F
O
R
N
Y
A
M
A
S
A
R
I
A
R
I
V
E
R
A l l o c a t i o n
A l l o c a t e d
B a l a n c e
9
R e s e r v e
3
, 3
0
3
, 3
2
, 4
0
0
N o r m a l
F l o w
1
, 4
Q
0
F l o o d
F l o w
8
, 9
3
, 9
6
.
6
M e a n
4
.
1
S t a n d a r d
D e v i a t i o n i
< i i
• n c
■
' y
^
'
Y i
-
.
'
.
- c
Probabilit y of non- exceed- ance
Probabi- lity of exceed- ance
Flow Flow
Availa- ble for alloca- tion r., 'jays
Total volume
Volume per year
% % m3 /s m'/day in3Is nos Millio n m3
Million m
99% 1% 8.187 707,322 3.65 2.58 218.1
95% 5% 4.243 366,595 18.25 6.69 215.5
90% 10% 2.958 255,571 36.50 9.33 208.8
85% 15% 2.241 193,622 54.75 10.60 199.5
80% 20% 1.841 159,062 73.00 11.61 188.9
75% 25% 1.610 139,104 91.25 12.69 177.3
70% 30% 1.395 120,528 109.50 13.20 164.6
65% 35% 1.230 106,229 127.75 13.57 151.4
60% 40% 1.086 93,830 146.00 13.70 137.8
55% 45% 0.971 83,894 164.25 13.78 124.1
50% 50% 0.862 74,477 38,794 182.50 13.59 110.3
45% 55% 0.759 65,578 200.75 13.16 96.8
40% 60% 0.710 61,344 219.00 13.43 83.6
35% 65% 0.617 53,309 237.25 12.65 70.2
30% 70% 0.571 49,334 255.50 12.60 57.5
25% 75% 0.490 42,336 273.75 11.59 44.9
20% 80% 0.413 35,683 21,946 292.00 10.42 33.3
15% 85% 0.332 28,685 310.25 8.90 22.9
10% 90% 0.247 21,341 328.50 7.01 14.0
5% 95% 0.159 13,738 0.000 346.75 4.76 7.0
1% 99% 0.071 6,134 361.35 2.22 2.2
FORM 2 (p. 21(2), 20(3), 19(3), 18(3), 17(3))
PART A-CATCHMENT PROTECTION ACTIVITIES PLANNED
TO BE UNDERTAKEN
Activity Sub-Activity
Time frame
Cost (KSh.)
Responsibil ity
Gazetteme nt of
Kajulu
Hills
Catchment as a protected area
Delineate & survey the lake's catchment area.
County
800,000
WRA, WRUA, Kisumu
Lands &
Survey
Team
Develop the Part of
Development Plan for the lake catchment
2022 500,000
WRA, Physical
Planning
Dept., CGK
Create awareness on the status of the bill's catchment area.
Continuo us
500,000
WRA, WRUA, NEMA, CGK, Develop guidelines and conservation/protec tion plan through stakeholders' engagement
2021 5,000,000
WRA with all stakeholder s
Submit gazettement instrument to the
AG
2022 100,000
WRA
Enforceme' nt of
Kajulu
Hills catchment
Enforcement of
Kajulu Hills catchment guidelines, management plan continuous 2,000,000
WRA, County, Govt, Activity Sub-Activity
Time frame
Cost (KSh)
Responsibil ity manageme guidelines and other legislations and relevant legislations. nt NEMA, KWS.
KFS, NLC
Re- vegetation of the catchment area
Establish indigenous vegetation
Propagation
Continuous 1,000,000
WRUA, WRA, KFS
Grow live fence on the boundary of the catchment.
Continuous 2,000,000
WRA, KFS, WRUA
Planting and growing of propagated seedlings
(Watering and tending)
Continuous 2,000,000
WRUA,CF
A,KIWAS
Exotic species control
Continuous 500,000
WRUA
Restricting activities that may lead to pollution and destruction of the catchment.
Public awareness creation
Annually 1,000,000
WRA, CGK, KFS, WRUA.
Controls/restriction s on charcoal burning, grazing, bathing and farming near sensitive areas.
Continuous 300,000
WRA, CGK, KFS, WRUA,NG
AO
Enforcement Quarterly 500,000
NGAO, WRA, KFS, NEMA, WRUA.
Alternative livelihood activities
Promote bee keeping, poultry farming and butterfly keeping, eco-tourism.
Continuous 7,500,000
WRA, WRUA, Agriculture and
Livestock
TOTAL
23,700,000
PART B -CONSERVATION PLAN
Activity Sub-Activity
Time frame
Cost
Responsibilit y
Establish the water balance
(Technical)
Assess demand and availability
2022 2,000,000 WRA, County
Government, WRUA, KWS
Develop water allocation plan for the
Kajulu Hills
Develop Water allocation Plan
2022 1,500,000 WRUA, WRA, KWS, County
Government, WRA, WRUA, NEMA, County
Government
Implement water allocation plan continuo us
2,000,000
WRA
$
MANAGEMENT
COMMITTEE
13th January, 2023
Enforce permit conditions continuo us
3,000,000 WRA, WRUA, Enhance
Water use efficiency
(introduction of technologies)
Sensitization and model water use units
— irrigation, domestic
Demonstration on efficient water use technology
Continuo us
2,500,000 WRA, WRUA, County
Government
Total 11,000,000
PART C —CATCHMENT MONITORING PLAN
Action Sub-Activities
Timee fram
Costs Responsible
Water sampling and analysis
Collect water resources samples and conduct analysis for biological and physico-chemical parameters.
Quarterly 500,000 WRA
Capacity
Building
Capacity building on data collection and monitoring
Continuo us
500,000 Stakeholders and WRA
Water resources monitoring
Install water level gauges
1 year 2,500,000 WRA, WRUA
Total
3,500,000
PART D—MANAGEMENT STRUCTURE
Activity Sub-Activity
Time frame
Cost
Responsibi- lity
Setting up the management structure
Appoint 1No.
Member from each of the following stakeholders:
. Kenya
Forest Service
Nation
1 Environment
Mgt Authority
National
Government
Administration in
Kisumu County;
. Kenya
Wildlife Service;
. Ministry of
Agriculture;
. Kajulu
Hills WRUA;
3 months 50,000 WRA
Terms of
References (ToR) will include but not limited to:
i) To manage the catchment prudently on behalf of other stakeholders ii) To submit quarterly reports to WRA and LVS on all planned and implemented activities;
iii) To develop by - laws and submit a copy to WRA and LVS
Continuo us
100,000 WRA, WRUA
Activity
Sub-Activity Cost
Time frame
Responsibi- lity for approval before implementation
Develop and implement resources mobilization strategies
Mandate and responsibilities:
• Promote the conservation and protection of the catchment
• Promote equitable distribution of the resources within the catchment
• Promote socio- economic and environmental sustainability of the catchment
Continuo us
50,000 Manageme nt
Committee
The sources of funds for the committee may include:
• Bee keeping
• Tree Nursery;
• Eco-tourism;
• Well- wishers/Donors
• WRA/WRUA -
(WDC)
Continuo us
500,000 WRA
Sub-total 700,000
PART E —REPORTING LINKAGES FOR THE MANAGEMENT
COMMITTEE
STAKEHOLDERS
V
WRUA
COMMUNITY
Note:
(i)
The arrows indicate the direction of flow of information. The dotted lines indicate WRUA can also communicate directly to communities and vice versa.
(ii) WRA as the agent of the National Government in the regulation of use and management of water resources, will be the co-ordinator of the committee. The members appointed to the Management Committee will serve on honorary basis as this will be a non-profit, non-commercial venture. The
Committee will be required to solicit for funding from well- wishers and other sources to supplement the income that may be derived from activities permitted in a protected area.
FORM 3 (P. 22)
MONITORING AND EVALUATION TEMPLATE
Activities
Start date
Implemen
Schedule ation fhl date
Status (% completion)
Planned
Cost
Ksh.
Total expenditure to date
Source of funds
Outpu Comments
Dated the 13th December, 2022.
MOHAMED M. SHURIE, Chief Executive Officer, Water Resources Authority.
GALE I I h NOTICE No. 239
THE CROPS ACT, 2013
PROPOSED GRANT OF LICENCES
NOTICE is given that pursuant to section 20 (6), (7) and (8) of the
Crops Act, the Agriculture and Food Authority proposes to grant licences to the following applicants;
Name of Applicant Purpose of Licence Location, County
ENI Kenya Limited
Oil
Manufacturer, Importer and Exporter of Castor
Wote, Makueni.
Origen Fresh EPZ
Limited
Nuts
Manufacturer and
Exporter of Macadamia
Mavoko, Machakos.
Convex Commodities
Merchants Limited
Manufacturer and
Importer of Ground Nuts
Dagoretti North, Nairobi.
Any objections to the proposed grant of licences with respect to the applicants, should be lodged in writing with the Agriculture and Food
Authority, Nuts & Oil Crops Directorate, Tea House, Naivasha Road, P.O. Box 37962-00100, Nairobi, within fourteen (14) days from the date of this mt,ice.
The objection should state clearly the name, address and telephone number of the person/s or entity objecting, the reasons for the objection to the grant of the licence and should be signed by the objector.
The Agriculture and Food Authority proposes to issue the licence to the applicants who will have complied with the Crops Act, 2013, the
Crops (Nuts q•nd Oil Crops) Regulations, 2020 (L/N No. 164) and any other relevant written law on the 16th January, 2023.
Dated the I&Ith December, 2022.
ENOSH AKUMA, MR/4281347
Agriculture and Food Authority.
Ag. Director-General
GAZETTE NGTCE No. 240
THE COMPETITION ACT
(No. 12 of 2010)
THE PROPOSED ACQUISITION OF ENTIRE ISSUED SHARE
CAPITAL IN RONGAI WORKSHOP AND TRANSPORT LIMITED
BY GENERAL CARGO SERVICES LIMITED
AUTHORIZATION
PURSUANT to the provisions of section 46 (6) of the Competition
Act, 2010, it is notified for general information that in exercise of the powers conferred upon the Competition Authority by section 46 (6) (a)
(ii) of the Competition Act, the Competition Authority has authorized the proposed transaction as set out herein.
Dated the 1st December, 2022.
MR/4281384
Director-General.
WANG'OMBE KARIUKI,
Dated the 13th December, 2023.
MOHAMED M. SHURIE,
Chief Executive Officer, Water Resources Authority.
Extracted Entities (1)
previous_gazette_ref
238
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 22
- Signed By
- MOHAMED M. SHURIE
- Title
- Chief Executive Officer, Water Resources Authority
- Date Signed
- 13th December 2023
- Page
- 53
- Extraction Method
- regex
Source Gazette
Vol. CXXV No. 7
Published 3rd January 2023