Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 10494

GAZETTE NOTICE NO. 10494

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to Regulation 21 of the Entriromnental Management and Co-ordination (Impact Assessment and. Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has . received an Environmental Impact. Assessment Study Report .fin the above proposed project. The proponent, Ministry of Defense proposes to develop a hospital. with 700 bed capacity which will : comprise of • the main hospital, 1, associated facilities (Oxygen Generating Plant; Waste Witter Treatment Plant, Medical Waste Incinerator and Mortuary) and Camp • Administrative Unit. The hospital will comprise of five .b/ocks•where. block 1-4: will. comprise of the main hospital and block .5. hotting the medical school complex on plot L.R. No 209/12348; Westland; Nairobi City County. , • The following are the anticipated Impacts and proposed Mitigation. measures: Possible Impacts Mitigation Measures Traffic management • Re-use excavated soil from the works as backfill and for landscaping. • Sensitize drivers on safe driving and working practices. • Use of traffic Marshalls to direct and contra! vehicles at the site. • Erect appropriate signage at construction site. Waste management • The contractor should develop a solid waste management plan for the site. • Reduce or re-use wastes to minimize waste • Wastes that cannot be re-used or recycled should be disposed at designated dumping Sites. Possible Impacts Mitigation Measures • Hazardous wastes, used batteries and tires should be collected for disposal or recycling by NEMA licensed waste handlers. • All wastes leaving the site should be recorded and tracking documents issued in line with NEMA Waste Management Regulations. • Give priority to material suppliers who provide opportimities to. return usable materials such as empty containers. • Provide color coded solid waste collection bins for waste collection from Workers and site offices. Soil erosion and • .Vegetation cover Should be removed only storm water where necessary. Reliant exposed project management sites.with appropriate vegetation covers. Excavated materials and .stockpiled soils . should be coveted or kept at appropriate sites to prevent wind erosion. Undertake appropriate soil erosion control measures to manage siltation and chigging of drains during construction phaSe. ' Discharge points • of all storm, water . channels, where flow of water is concentrated .should be firmly stabilized. Storm water should be diverted away from the steep gradients as well as temporary stockpiled soil and/ or waste. Store materials; fuels, and chemicals in a • specifics and seethed area to preVent pollution from spillages and leakages. Provide Oil spill containment kits and cleanup equipment, Train drivers: and workers on oil and fuel Spill control. Waste oil should be disposed off or taken for recycling by a NEMA: licensed waste handler. Provide adequate toilets at the construction site for use by wotkers. Occupational health • Provide personal safety gears (PPEs) arid and safety risks enforce adherence.to their use at all times. Develop a safety and health plan for guiding all workers on safety and health issues at the construction site. Constitute' a health and safety committee to manage health and Safety issues at site. Conduct daily Tool Box Talks with all workers on accident prevention and safe work procedures. Provide and display emergency telephone numbers within the site. Restrict and control unauthorized access into construction sites to prevent accidents and injuries. Train some workers on first aid and fire control and management techniques. Avail well stocked First Aid kits at the, site and ensure its easily accessible in case Of an emergency. Train all contractors' workers on the signs and symptoms of COVID-19, how it spreads, how to protect themselves and the Possible Impacts Mitigation Measures need to be tested if they have symptoms and on vaccinated. Air pollution • Sprinkle water on dusty work areas to minimize dust generation. • Enforce low speed limits for construction vehicles and spray water on dusty roads. • Cover sand and loose aggregate materials during transportation to site. • Regular servicing and maintenance of machines and vehicles to reduce emission of harmful fumes to the atmosphere. Noise pollution • Device appropriate noise mitigation measures e.g. use of acoustic barriers around noisy equipment. • Track drivers to avoid hooting and revving of engines where unnecessary. • All equipment and vehicles on the site should be properly serviced and maintained to reduce noise. • Proper maintenance and servicing of equipment and machinery during the operation phase. • Use of warning signs for speed limits, hooting and revving of engines. • Noise level measurements should be carried out on individual equipment to detect increases in noise levels. Site security • The contractor, workers and suppliers should strictly follow security rules and procedures put in place by KDF. • Conduct thorough vetting for all workers to avoid criminal elements infiltrating the site. • Proper screening and manning of entry points to the site. • Conduct random and regular security patrols around the construction site. • Install CCTV at storage, work stations and other sensitive areas at the site. Increased water • Conduct daily inspections to ensure that demand water is used efficiently at the site by sensitizing construction staff to avoid irresponsible water use. • Fix any water leaks from damaged pipes and faulty taps. • Utilize water from other alternative sources e.g. from existing borehole or water harvested from rain. Increased energy • Employ the use of energy saving bulbs at the demand site. • Install security lights with sensors to save on energy during the night. • Switch off all electrical equipment when not in use to save energy. • Install alternative energy sources such as solar power. • Monitor and keep records of energy use for better decision making. Socio — economic • Give priority to locals when hiring workers impacts for the project during construction including suppliers and service providers. • Ensure gender balance in employment as far as possible. Possible Impacts Mitigation Measures • Implement HIV/AIDS and STD awareness and Keverriion programme for workers and local residents targeting risk groups. • Constitute a Grievance Redress Mechanism to handle social conflicts related to the Proieci. Storm water • Conduct regular checks and unclog or de-silt management blocked drainage channels within the hospital. • Regular repair and maintenance of drainage out falls to prevent soil erosion. • Consider rain water harvesting to reduce the amount of surface run-off. • Put in place a storm water management plan to cater for the increased surface run-off. Exposure to • Train WWTP operators in safe handling of chemical hazards waste water treatment chemicals and emergency response procedures. • Install safety showers and eye wash stations near areas where hazardous chemicals are stored or used. • Erect perimeter fence around waste water treatment plant to restrict access and prevent physical injuries. • Sludge from the WWTP shall be removed once every 2-3 years. The full report of the proposed project is available for ii.:,pection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126-00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be mailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/3869295 National Environment Management. GAZETTE NonCE No. 10495 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED RESIDENTIAL APARTMENTS DEVELOPMENT ON PLOT L.R. NO. 1/522 ALONG WOOD AVENUE, NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Lehome Company limited proposes to construct two hundred and five (205) units of residential apartments. The • Display signs to indicate construction activities. • Maintain all equipment. • Adhere to provisions of Noise Prevention and Control Rules 2005, Legal Notice No. 24 regarding noise limits at the workplace as well as NEMA Noise and Excessive Vibration Pollution Control Regulations, 2000. • No overloading of trucks and good driving practices to be practiced. • Suitable junction/access point to be provided. • Use of appropriate and legible signage. • Employment of formal flagmen / women to ensure the public safety. • Adopt waste minimization at source. 2nd September, 2022 THE KENYA GAZETTE development entails two semi-detached blocks with two basements, ground floor plus 16 floors comprising of 16 studio units, 93 one bedroom units, 96 two bedroom unit, playground, gymnasium and associated facilities. The project will be located on plot L.R No 1/522, along Wood Avenue, Nairobi. The following are the anticipated impacts and proposed mitigation measures: Possible Impact Mitigation Measures Soil erosion • Control earthworks. • Install drainage structures to control flow of storm water. • Ensure management of excavation activities. Air pollution • Stockpiles of earth should be sprayed with watet or covered during dry seasons. • Provide dust masks for the personnel in dusty areas. • Sensitize construction workers on pollution control measures. • Cover all trucks hauling soil, sand and other loose materials. • Provide dust screen where necessary. • Only areas earmarked for development should be cleared. • Plant trees, shrubs, and flowers on remaining open spaces. • Install portable barriers to shield compressors and, other small stationary equipment where necessary. • Monitoring the fate of disposed wastes to ensure they are legally land filled at a recognized controlled site. • Adhering to Waste Management Regulations of 2006. • Ensure proper solid waste disposal and collection facilities; • Ensure dustbin cubicles are protected from animals, rains and are well covered. Provide suitable safety gear for all • personnel. • Proper treatment of waste water. • Adherence to the ministry of health guidelines on preventing spread of the SARS-CoV-19 virus. • Observe, protect and conserve the riparian reserve in compliance with the Water Act, Possible Impact Mitigation Measures 2016 and Water Reserve Management Rules 118. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati ROW, Upper Hill, PG. Box 30126-00100, Nairobi. (b) Director-General, NEMA; Popo Road, off. Mombasa Road, P.O. Box 67839-00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to. assist the Authority in the decision making process regarding this project. Comments can also be entailed to dgneirtaenerna.go.ke MAMO B. MAMO, Director-General, MR/3869253 National Environment Management Authority. aikzETTE NOTICE No. 10496 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of1999) NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED CONSTRUCTION OF AN ORTHOPEDIC CLINIC ON PLOT L.R. NO. 209/22300 (ORIGINAL/17/8) 3RD AVENUE, PARKLANDS, NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS • PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environnient Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Springfield Developers Limited proposes to construct and operate an Orthopedic Clinic which will consist of the ground floor plus 8No. Floors. The clinic will comprise of offices, training rooms, nurse stations, physiotherapy gym, hydrotherapy pool room, MIR lobby, X-ray room, laboratories, orthopedic clinic, triage, pharmacy, surgical room, theatre and 13no single mom*. The proposed project will be located on plot L.R. 209/22300 (Original Number 209/17/8) 3rd Avenue Parklands Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: • Environmental/ Social Impact Soil erosion • Providing soil erosion control structures on the steeper areas of the site. • Compact loose soils to minimize wind erosion. • Regular sprinkling of water on, dusty areas and access roads. • Careful screening of construction site to contain and arrest construction related dust. Loss of lregetation Noise pollution Road traffic disruption Increased generation of waste Public health and occupational safety Water sources Proposed Mitigation Measures • Ensure management of excavation activities. Air pollution Proposed Mitigation Measures • Enclosing, covering and watering of exposed stockpiles e.g. sand. • Ensure construction machinery and equipment are well maintained to reduce exhaust gas emission. Noise and excessive • Construction activities to be restricted vibrations to daytime i.e. 8 a.m. to 5 p.m. • Use of suppressors or noise shields on noisy equipment for instance corrugated iron sheet structures. • Trucks used at construction site shall be routed away from noise sensitive areas where feasible. • Minimize vibrations by using hi-tech equipment that produces lesser vibrations during excavation. Oil pollution • Proper storage, handling and disposal of new / used oil and related wastes. • Maintain construction machinery and equipment to avoid leaks. Storm water drainage • Proper installation of drainage structures/facility. • Ensure efficiency of drainage structures through proper design and maintenance. • Proper maintenance of drainage structures. • Inspection and maintenance of water harvesting facilities. • Collection of excess storm water for reuse e.g. car washing. Solid waste and liquid • Segregate the waste at the site. waste • Engage services of a registered NEMA waste handler to dispose the waste. • Covering of the trucks during transportation, all the building materials and waste. • Provision of adequate and apptopriate sanitary facilities for the construction workers. Increased water demand • Use water from the borehole to supplement water from NWSC. • Sensitize occupants and workers to reduce water wastage e.g., by reusing where applicable. • Install water efficient appliances. • Reuse of harvested rain-water e.g. cleaning pavements and cars. Traffic congestion • Employ traffic marshals to control traffic in and out of site. • Ferry building materials during off- peak hours. • Provide traffic control signs at the site/entrance to notify motorists and general public about the development. • Enforce speed limits for construction vehicles especially along the roads leading to the site. • Ensure that the vehicles comply with axle load limits. • Employ well trained and experienced drivers. Environmental! Social Impact Health and safety of ani:IlittWOil work shall be limited to workers daytime only. • Workers to be adequately insured against accidents. • All workers will be sensitized before construction begins on how to control accidents related to construction. • Keep record of the public emergency service telephone numbers including: Police, Fire brigade, Ambulance at strategic points. • Provide first aid kits at strategic places in the site. • All workers to wear protective gear during construction e.g. helmets. • A comprehensive contingency plan shall be prepared before construction begins on accident response. Fire • Develop and adapt an (fire) emergency response plan for the project. • Ensure that all firefighting equipment are regularly maintained and serviced. • Provide fire hazard signs such as 'No Smoking' sign, Direction to exit in case of any fire incidence and emergency numbers. • Sensitize the occupants on fire, risks i.e. conduct regular fire drills. • Provide escape routes/emergency exits in the buildings. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126-00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites' members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/3867509 National Environment Management Authority.

Dated the 2nd September, 2022.

MAMO B. MAMO,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

10494

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management Authority
Date Signed
2nd September 2022
Page
29
Extraction Method
regex