Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 8986

GAZETTE NOTICE NO. 8986

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponents, Adornhomes Investments Kenya Limited, proposes to develop single residential apartments on plot L.R. No. 209/16019 (Original No. 209/9675/7) along Nyeri Road in Kileleshwa, Nairobi County. The project will involve the construction of a single residential block of 18 storey with a total of 216 units. Possible Impacts Mitigation Measures Soil disturbance • Control earthworks and compact loose soils. 29th July, 2022 THE KENYA GAZETTE Possible Impacts Mitigation Measures • Ensure the geo-technical survey is conducted before commencement of any excavations. • Install drainage structures properly. • Landscaping on project completion. • Control and manage excavation activities. • Control activities especially during rainy conditions. • Provide soil erosion control and conservation structures/means where necessary. • Ensure standard appropriate practices on the provided gardens. Change in hydrology • Proper installation of drainage structures commensurate with the new development. • Install cascades to break the impact of water flowing in the drains. • Ensure efficiency of drainage structures through proper design and maintenance. • Provide gratings to the drainage channels. Liquid waste • Ensure sanitary facilities are kept clean always through regular cleaning. • Ensure regular maintenance of foul water drainage works at the premises to prevent clogging and fore-stall breakdowns. • Frequent monitoring of the internal drainage system. Increased energy use • Solar energy will be used as an alternative source of energy. • Use energy efficient appliances such as LED bulbs for lighting. • Switch off electrical appliances when not in use. • Regular maintenance of all the electrical components. • Regular inspection and maintenance of the solar panels. Solid waste • Use of an integrated solid waste management system through a hierarchy of options: source reduction, recycling, composting and reuse, will facilitate waste handling. • Ensure segregation of waste (organic and inorganic) at source. • Provide clearly marked dustbins cubicles to serve the specified use. • Ensure that wastes generated are efficiently managed through recycling, reuse and proper disposal procedures. • Engage services of a registered NEMA waste handler to dispose the waste regularly at approved disposal points. Oil pollution • Proper storage, handling and disposal of new oil and used oil wastes as per waste regulations. • Maintain plant and equipment to avoid leaks. • Maintenance of construction vehicles Possible Impacts Mitigation Measures should be carried out in the contractors yard (off the site). • Provide oil interceptors along the drains leading from car park and potentially oil risk areas. Water resources • Management of water usage. Avoid unnecessary wastage. • Recycling of water at the construction phase where possible. Make use of roof catchments to provide water i.e. for general purposes. Public health, occupational health and safety. • Train staff/workers on occupational health and safety. • Provide full protective gear and workmen’s compensation cover in addition to the right tools and operational instructions and manuals during construction. • Adopt sound housekeeping practices. • Sensitize residents on environmental management. • Design of sewerage system should be as provided in the plans. • Post strategically the Occupational Safety and Health Act, 2007 Abstract and provide material safety data sheets. • Post clear warning signs e.g. 'No unauthorized use of machines', ensure there are guards on moving parts e.t.c. • Provide fully equipped First Aid kits and train staff on its use. Ensure adherence with the legal requirements -OSH Act, 2007. Fire • Install firefighting equipment as provided elsewhere in the report. Conduct training on firefighting, evacuation and emergency response. • Sensitize the residents on fire risks i.e. conduct regular fire drills. • Adapt effective emergency response plan. • Maintain service firefighting machinery regularly. • Provide emergency numbers at strategic points. Water quality and waste management • Follow NEMA regulations. Traffic management • Conduct a traffic Impact Assessment and generate a traffic management plan. • The Traffic management plan should be followed throughout the project cycle. Security • Provide security guards and facilities during the entire project cycle. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126–00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke 5728 5728 The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/3882905 National Environment Management Authority.

Dated the 29th July, 2022.

MAMO B. MAMO,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

8986

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management Authority
Date Signed
29th July 2022
Page
38
Extraction Method
regex