Back
OTHER 79% confidence via regex

GAZETTE NOTICE NO. 6178

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.74 Cents per kWh for all meter readings taken in May 2022 Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in April 2022 (kWh) Gitaru 52,052,990 Kamburu 27,550,070 Kiambere 43,928,210 Kindaruma 12,613,430 Masinga 9,016,240 Tana 5,692,370 Wanjii 3,684,745 Sagana 548,397 Turkwel 49,473,970 Gogo 420,003 Sondu Miriu 15,544,000 Sangoro 4,816,290 Regen-Terem 761,910 Chania 43,580 Gura 1,445,882 Metumi 735,539 Total units purchased from hydropower plants with capacity equal to or above 1MW = 228,327,625 kWh Total units generated and purchased (G) excluding exports in April 2022 = 1,032,424,563 kWh DANIEL K. BARGORIA, Director General. MR/3253364 27th May, 2022

Extracted Entities (1)

previous_gazette_ref

6178

Details

Signed By
DANIEL K. BARGORIA
Title
Director General
Date Signed
27th May 2022
Page
50
Extraction Method
regex