GAZETTE NOTICE NO. 6783
GAZETTE NOTICE NO. 6783
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Royal Suburb Phase Three Limited, proposes to develop residential apartments comprising of a single 12-storey block with a total of 446No. Apartments (I57No. Studio Apartments, 72No.
Superior Studio Apartments, 151No. one bed roomed apartments, I2No. Superior one bed roomed apartments, 18No. Convertible apartments and 36No. two bed roomed apartments), shops on ground floor, lounge and offices, guard house, protected dustbin cubicles, sewer , lifts and other associated facilities and amenities on plot L.R.
No. 1012/132 (Original No. 1012/47/1/9) at Roysambu area off Kamiti
Road, Roysambu Sub-County, Nairobi County.
The following are the anticipated impacts and proposed mitigation measures:
Possible Impacts
Mitigation Measures
Soil disturbance
• Control earthworks and compact loose soils.
• Ensure the geo-technical survey is conducted before commencement of any excavations.
• Install drainage structures properly.
• Landscaping on project completion.
• Control and manage excavation activities.
• Control activities especially during rainy conditions.
• Provide soil erosion control and conservation structures/means where necessary.
• Ensure standard appropriate practices on the provided gardens.
Increased water use • Proper installation of drainage structures and flow commensurate with the new development.
• Install cascades to break the impact of water flowing in the drains.
• Ensure efficiency of drainage structures through proper design and maintenance.
• Provide gratings to the drainage channels.
Liquid waste
• Ensure sanitary facilities are kept clean always through regular cleaning.
• Ensure regular maintenance of foul water drainage works at the premises to prevent clogging and fore-stall breakdowns.
• Frequent monitoring of the internal drainage system.
• Ensure effluents are discharged responsibly to the public sewer system.
Increased energy
• Solar energy will be used as an alternative use source of energy.
• Use energy efficient appliances such as
LED bulbs for lighting.
• Switch off electrical appliances when not in use.
• Regular maintenance of all the electrical components.
• Regular inspection and maintenance of the solar panels.
Noise pollution
• Erect suitable barriers to control noise.
• Sensitize drivers of construction machinery on effects of noise.
• Maintain plant equipment (if present).
• Post clear warning signs e.g. `No unauthorized use of machines', ensure there are guards on moving parts, e.t.c.
• Provide fully equipped First Aid kits and train staff on its use. Ensure adherence with the legal requirements —OSH Act, 2007
Install firefighting equipment as provided elsewhere in the report. Conduct training on firefighting, evacuation and emergency response.
• Sensitize the residents on fire risks i.e.
conduct regular fire drills.
Fire safety and • preparedness
10th June, 2022 THE KENYA GAZETTE 3457
Possible Impacts Mitigation Measures
• Construction activities to be restricted to daytime.
• Workers in the vicinity of or involved in high-level noise to wear safety and protective gear.
• Work to be confined between 8.00 a.m. and
5.00 p.m. weekdays and 8.00 am. to 1.00 p.m. on weekends. There should be no construction works on Sundays and public holidays.
Solid waste
• Use of an integrated solid waste management system through a hierarchy of options: source reduction, recycling, composting and reuse, will facilitate waste handling.
• Ensure segregation of waste (organic and inorganic) at source.
• Provide clearly marked dustbins cubicles to serve the specified use.
• Ensure that wastes generated are efficiently managed through recycling, reuse and proper disposal procedures.
Possible Impacts Mitigation Measures
• Design of sewerage system should be as provided in the plans.
• Post strategically the Occupational Safety and Health Act, 2007 Abstract and provide material safety data sheets.
• Adapt effective emergency response plan.
• Maintain service firefighting machinery regularly.
• Provide emergency numbers at strategic points.
Oil pollution
• Engage services of a registered NEMA waste handler to dispose the waste regularly at approved disposal points.
• Proper storage, handling and disposal of new oil and used oil wastes as per waste regulations.
Record keeping • Collection and analysis of relevant environmental data of the site throughout the project cycle.
Traffic management • Conduct a traffic Impact Assessment and generate a traffic management plan.
• Maintain plant and equipment to avoid leaks.
• The Traffic management plan should be followed throughout the project cycle.
Air pollution
• Maintenance of construction vehicles should be carried out in the contractors yard (off the site).
• Provide oil interceptors along the drains leading from car park and potentially oil risk areas.
• Enclose the site with dust-proof nets during construction.
• Water should be sprayed during the construction phase of excavated areas during dry conditions.
• Control speed and operation of construction vehicles.
• Prohibit idling of vehicles.
• Ensure sound condition of construction machinery and equipment.
• Engage sensitive construction workers.
Management of water usage. Avoid unnecessary wastage.
Recycling of water at the construction phase where possible. Make use of roof catchments to provide water i.e. for general purposes.
Train staff/workers on occupational health hand safety.
Provide full protective gear and workmen's compensation cover in addition to the right tools and operational instructions and manuals during construction.
• Adopt sound housekeeping practices.
• Sensitize residents on environmental management.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO, Director-General, MR/3850913 National Environment Management.
Dated the 10th June, 2022.
MAMO B. MAMO,
Director-General, National Environment Management.
Extracted Entities (1)
previous_gazette_ref
6783
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 10th June 2022
- Page
- 36
- Extraction Method
- regex
Source Gazette
Vol. CXXIV No. 109
Published 20th January 2022