Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via regex

GAZETTE NOTICE NO. 6780

GAZETTE NOTICE NO. 6780

THE PHYSICAL PLANNING AND LAND USE ACT

(No. 13 of 2019)

COMPLETION OF DEVELOPMENT PLAN


NOTICE is given that the preparation of the above part development plan was on 10th March, 2022, completed. The part development plan relates to land situated within Makindu Township, Kibwezi West Sub-County. Copies of the above part development plan have been deposited for public inspection at the office of Chief Officer, Lands, Mining, Physical Planning and Urban Development and office of CECM, Lands, Urban Development, Environment and Climate Change, Makueni County. The copies so deposited are available for inspection free of charge by all persons interested at the office of Chief Officer, Lands, Mining, Physical Planning and Urban Development and office of CECM, Lands, Urban Development, Environment and Climate Change, Makueni County, between 8.00 a.m. and 4.30 p.m., during working days. Any interested person who wishes to make any representation in connection with or objection to the above development plan may send such representations or objections in writing and to be received by CECM, Lands, Urban Development, Environment and Climate Change, Makueni County, P.O. Box 78-90300, Wote, within sixty (60) days from the date of publication of this notice and such representations or objections shall state the grounds on which it is made. Dated the 10th March, 2022. bulk water supply systems and associated works in Mikuyuni Sub- location, Kathekalcai Location, Machakos Central Division, Machakos Sub-County in Machakos County. The following are the anticipated impacts and proposed mitigation measures: Possible Impacts Mitigation Measures Provide notices, signage and information to the public for their safety at all locations. Install barriers along walkways, crossings and public places affected by the works for public safety. • Where there are potential for nuisance from dust generation, ensure earth moving is under dump conditions (consider watering where necessary). • Inform immediate communities or stakeholders of the activities. • Construction activities will be limited to project sites / routes which already exist therefore limited destruction to vegetation cover. • Stock piling of top soil, construction material and wastes should be done only at designated sites approved by the supervising engineer, erosion prevention through beaming of loose soil sites should be done in all areas susceptible to agents of erosion. • Notify public the intent to cut sections of the road for safety precautions. • Provide signage and safety information in all work areas. • Notify other services providers and open small sections that can be reinstated within the shortest period to avoid disruption of public services. • Mark the lines to avoid conflicts with other activities. The Contractor will be responsible for ensuring that appropriate authorization to use the proposed borrows pits and quarries have been obtained before commencing activities. VINCENT KIGEN, Earth moving and • excavations (vegetation clearance, • channeling and site preparations) Materials sourcing, • from burrow pits and quarries delivery and storage MR/3850613 JULIUS M. KALOI, CECM, Lands, Urban Development, Environment and Climate Change. • Topsoil shall be stripped prior to removal of borrow and stockpiled onsite. This soil shall be replaced on the disturbed once the operation of the borrow site or quarry is complete. Concrete/cement batching plant

Dated the 10th March, 2022.

CECM,

Lands, Urban Development,.

Extracted Entities (1)

previous_gazette_ref

6780

Details

Act / Legislation
THE PHYSICAL PLANNING AND LAND USE ACT
Reference
No. 13 of 2019
Signed By
CECM
Title
Lands, Urban Development,
Date Signed
10th March 2022
Page
32
Extraction Method
regex