Back
RESTORATION 74% confidence via regex

GAZETTE NOTICE NO. 9759

GAZETTE NOTICE NO. 9759

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

RESTORATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The Proponent Fairvalley Heights Limited, proposes to develop residential apartments comprising of 229No. units (103No. three bedroom units, 85No. two bedroom units, 24No. one bedroom units, I 8No. four bedroom villas), shops, playground, associated facilities and amenities on Plot L.R. No. 10426/61 located in Gimu Area, Mavoko Sub-County, Machakos County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Change in land • use Soil Excavation • leading to site disturbance. • Transmission • of covid- 9 • Soil Erosion • • Noise Pollution • and Vibration which may • affect workers . onsite, neighbours • and buildings in the neighbourhood • • • Air Quality • • • Apply for and obtain a change of user from the County Government of Machakos. Excavate only areas to be affected by buildings. Dumping of excess excavated materials to sites designated by NEMA and County Government. Restoration of sites excavated via landscaping. Social distancing where applicable. Use of masks. Screening of workers on daily basis. Create and maintain soil traps and embankments. Landscaping after completion of construction. Ensure use of serviced and greased equipment. Switch off engines not in use. Ensure use of earmuffs by machine operators. Use light machinery most during excavation to reduce vibration. Encourage human labour. Conduct noise monitoring in collaboration with a NEMA designated laboratory. Sensitize drivers to avoid running vehicle engines and hooting unnecessarily. Comply with the Noise and Excessive Vibration Pollution (Control) Regulations„ 2009. Water sprinkling of driveways to reduce dust emission during construction. Use of trap nets to reduce dust. Ensure servicing of vehicles regularly. 20th November, 2020 THE KENYA GAZETTE 4713 Impacts Proposed Mitigation Measures Risks of • Education and awareness to all construction accidents and workers. injuries to workers • Ensure use of appropriate personal protective clothing. • Provide First Aid Kits on site. • Ensuring Building Strength and stability. • Proper supervision. • Ensure waste materials are disposed of on County and NEMA approved sites. • Ensure re-use of materials that can be re-used. • Reuse the generated overburden in backfilling. • Procure and provide adequate solid waste collection bins with a capacity for segregation. • Create awareness on best waste management practices. • Use of the 3rs — Reduce, Re-use, Re-cycle. • Use electricity sparingly since high consumption of electricity negatively impacts on these natural resources and their sustainability. • Use of standby generators. • Encourage energy saving appliances. • Keep records and analyze Kenya Power bills to identify areas of unnecessary use. • Undertake energy audits. • Harness solar energy. Excessive • Excessive water use may negatively impact on water use the water source and its sustainability. Avoid leakages and running water while not in use. • Sensitize the staff and tenants on the need to conserve the available water. • Monitor the amount of water being abstracted from the borehole and any other source. • Use water meter as a control measure. Storm water • Provide roof gutters to collect and direct roof impacts water to drains and water harvesting tanks. • Construct drains to standard specifications. • Develop a storm water drainage system and linkage to natural drains. Solid waste • Regular inspection and maintenance of the waste generation disposal systems during operation phase. and management during occupation • Provide waste disposal bins to each house, well protected from adverse weather and animals. • Ensure waste materials are disposed of on County and NEMA approved sites. • Use of the 3rs — Reduce, Re-use, Re-cycle. Liquid waste • Regular inspection and maintenance of the waste generation disposal systems during the operation phase. The and development must be properly connected to the management sewer system in the neighbourhood. during occupation Health and • Provide First Aid Kits on site. safety • Proper signage and warning to public of heavy vehicle turning. • Ensuring building strength and stability. Solid waste generation during construction Energy consumption • Establish a collective waste disposal and management system for each component of the development.

Dated the 20th November, 2020.

Extracted Entities (1)

previous_gazette_ref

9759

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Date Signed
20th November 2020
Page
39
Extraction Method
regex