Back
ACT 100% confidence via regex

GAZETTE NOTICE NO. 9326

GAZETTE NOTICE NO. 9326

THE ENERGY ACT

(No. 1 of 2019)

ACT


PURSUANT to the provisions of section 11 (c) and section 163 (1) of the Energy Act, 2019, the Energy and Petroleum Regulatory Authority notifies the general public that it has considered the tariff renewal application made by NAL Offgrid Limited in Lolupe, Longech, Kataboi and Nadwat sites, Turkana County, and approved applicable tariffs for a period of three (3) years with effect from the 1st October, 2020 as follows: Tariff Structure Energy Charge Rate (KSh.lkWh) Connection Fee (KSh.) Kataboi Nadwat Lolupe Longech Domestic Consumer 82.95 84.95 86.85 79.76 12,000 Business Customer 88.4 75.78 85.04 77.84 12,000 Institution 7925 7835 78.42 76.29 12,000 MUENI MUTUNG'A, MR/1443145 Ag. Director-General.

Dated the 1st October, 2020.

MUENI MUTUNG'A,

Ag. Director-General.

Extracted Entities (1)

previous_gazette_ref

9326

Details

Act / Legislation
THE ENERGY ACT
Reference
No. 1 of 2019
Section
section 11 (c)
Signed By
MUENI MUTUNG'A
Title
Ag. Director-General
Date Signed
1st October 2020
Page
18
Extraction Method
regex