GAZETTE NOTICE NO. 8055
GAZETTE NOTICE NO. 8055
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Kithaayoni Self Help Group through the County
Government of Machakos, through the Kenya Climate Smart
Agricultural Project (KCSAP), has proposed the development of
Kithaayoni Concrete Dam for domestic /livestock and micro irrigation.
The projects will benefit 800 people and 2000 livestock located in
Makaveti Village, Kyanzasu Sub-location of Kimutwa Location in
Machakos County.
The following are the anticipated impacts and proposed mitigation measures:
Potential Mitigation Enhancement Measures
Impacts
Interference • Adequate survey should be done on the dam with the location and its extent.
physical setting
• Engagement shall be to assess whether there are grievances.
• Landscaping.
Noise • Noise maintained in accordance to EMCA pollution and specification standards.
vibration
• Equipment Operators to wear PPEs to prevent direct noise from the machinery.
• Machines with minimal vibrations to be used.
• Time restrictions for high vibrating machines
(avoid working during the night for such machines).
Air quality
• Supply and construction vehicles will only use the degradation/ designated transport routes. The drivers will also dust be advised to stick to prescribed speed limits.
emissions
• The contractor will ensure proper repair and maintenance of vehicles and equipment to minimize exhaust gases.
• The contractor shall ensure the appropriate speed limits are observed at along all road sections that will be used by construction vehicles on a needs basis to eliminate the creation of dusts.
• Construction workers will be provided with dust masks to mitigate.
Potential Mitigation Enhancement Measures
Impacts
Workers • The Project Contractor will be required to provide accidents and appropriate personal protective equipment and a hazards safe and healthy environment for construction during workers.
construction • There should be a crisis management team to administer First Aid to injured persons.
• The Project Contractor should test and approve equipment before use.
• The Project Contractor should train workers on how to use various PPE and safe use of machinery.
Extraction and • The construction extraction site should be use of backfilled to help retain the value of the land construction resource.
materials
• Fencing to be done before backfilling to prevent accidents of humans and livestock. Putting a sign to warn people.
Generation of • Sensitization of construction workers on proper liquid and disposal of solid wastes.
solid waste
• Temporary latrines will be provided on site to be used by construction workers.
• Oils and greases emanating from repair and maintenance activities will be collected in containers to avoid entry into local drainage channels.
• Water from cleaning of equipment will be utilised within the project site and will not be discharged into watercourses.
Loss of flora
• Cutting of trees should be done only where and fauna necessary.
• The proponent shall ensure that clearing of vegetation clearing is limited to the pipeline trench area (i.e. 0.5 meters width).
• Transportation of construction materials to be done through the existing local roads.
• Avoidance of vegetation clearing along riparian land.
• Sensitization of construction work-force on environmental conservation and ecological protection.
Increased
• Transportation of construction material to specific vehicular and sites will be done through the existing local roads.
human traffic • The contractor will rehabilitate the local roads that will be damaged during construction activities
• Consultation with the local communities on planned road diversions if any.
• Restriction of Vehicular and Human Traffic to the road reserve where possible.
• Sensitization of drivers to comply with prescribed speed limits.
Influx of • Preference is given to local residents for unskilled workers from jobs where necessary.
other areas
Occupation
• Continuous supervision of occupational, health health and and safety management to ensure compliance.
safety
• Occupational Safety and Health Training for contractor's staff.
• Conduct orientation talks and visits.
• Conduct toolbox talks (safety meetings).
• The contractors will develop a SOPs for managing the spread of Covid-19 during project execution and submit them for the approval of the
Supervision Engineer and the Client before mobilization. The SOPs shall be in line with the
World Bank guidance on COVID-19, Ministry of
Health Directives and site-specific project conditions.
Spread of
COVID-19 amongst workers
Extracted Entities (1)
previous_gazette_ref
8055
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Page
- 37
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 182
Published 6th January 2020