Back
ACT
100% confidence
via regex
GAZETTE NOTICE NO. 8761
GAZETTE NOTICE NO. 8761
THE PHYSICAL. AND LAND USE PLANNING ACT
(No. 13 of 2019)
ACT
NOTICE is given that the preparation of the above draft plans was on the 14th October 2020, completed.
The plans relate to land situated within Bute, Eldas, Griftu, Hadado, Habaswein, Khorof-Harar and Tarbaj Towns and their environs.
Copies of the draft plans have been deposited for public inspection free of charge at the Office of the County Director of Physical
Planning at the lands offices in Wajir Municipality.
The copies are available for inspection free of charge by all persons interested at at the Office of the County Director of Physical
Planning at the lands offices in Wajir Municipality, from Monday to
Friday between the hours of 8 a.m. and 5 p.m.
Any interested person who wishes to make any representation in connection with or objection to the above plans may send the same to the below-mentioned address by 14th December, 2020. All representations or comments shall state the grounds upon which they are made.
Comments or views should he addressed to:
Naema Soma, CECM, Department of Lands, Housing and Physical Planning, County Government of Wajir, Wajir.
Dated the 14th October, 2020
NAEMA SOMO, MR/I 320194 CECM, Lands, Housing and Physical Planning.
Project Activity and Management Action Plans and
Issues Responsibilities recruitments.
Site clearing • Ensure proper handling and disposal of the waste.
• All the graves on the project site should be identified and exhumed.
• Follow the required cultural procedures in the grave relocations.
Decommissioning of • Ensure proper handling and disposal of sanitary facilities and the waste generated.
graves
• All the graves on the project siteshould be identified and exhumed.
Earth moving
Dam formation
Social interactions
Economic issues
Post-construction
Health and sanitation
Catchments' management
• Practice soil control measures
(terracing).
• Spoil dumping only in approved locations.
• Construction to be carried out during dry seasons.
• Limit construction to day time.
• Make certain regular maintenance of contractors machineries and vehicles.
• Provide adequate signage and reflective tapes for restricted areas.
• Training workers on environmental health and safety procedures.
• Implement the rehablitation plan for material sites.
• Provide workers with personal protective gear and enforce application.
• Provide awareness and sensitization to the workers including HIV/AIDS.
• Collaborate with the local leadership on selecting camp site locations.
• Provide public safety signage and information appropriately.
• Create awareness to the public for allconstruction operations.
• Provide opportunities for local labour
(upto 60%).
• Integrate access to water points into the construction.
• Enhance benefits from materials procurements to the local communities.
• Ensuring 24 Hr security to the dam area.
• Ensure regular water quality monitoring and maintenance of the water supply.
• Influence the surrounding land-use activities.
• Creation of awareness on water resource management and conservation.
• Initiate afforestation programmes of slopes and other steep sections of the watershed area in collaboration with landowners.
• Undertake catchment management plan for Kipchorian River basin.
• Integrate a Land Use Management Plan, Pest Control Management Plans.
30th October, 2020 THE KENYA GAZETTE 4335
Dated the 14th October, 2020.
NAEMA SOMO,
MR/I 320194 CECM, Lands, Housing and Physical Planning.
Extracted Entities (1)
previous_gazette_ref
8761
Details
- Act / Legislation
- THE PHYSICAL. AND LAND USE PLANNING ACT
- Reference
- No. 13 of 2019
- Signed By
- NAEMA SOMO
- Title
- MR/I 320194 CECM, Lands, Housing and Physical Planning
- Date Signed
- 14th October 2020
- Page
- 28
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 195
Published 19th June 2020