GAZETTE NOTICE NO. 3533
PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.06Kenya cents per kWh for all meter readings to be taken in May, 2020.
15th May, 2020
Information used to calculate the WRMA Levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Units Purchased in April, 2020
Hydropower Plant
(KWh.)
Gitaru
68,277,000
Kamburu
34,222000
Kiambere
77,551,000
Kindaruma
15,043,380
Masinga
261,000
Tana
12,586,479
Wanjii
-
Sagana
852,784
Ndula
-
Turkwel
26,1871,350
Gogo
494,120
Sondu Miriu
42,172,000
Sangoro
13,787,070
Regen-Terem
2,402,706
Chania
148,809
Gum
2,735,669
Total units purchased from hydropower plants with capacity equal to or above 1MW = 297,405,367 kWh
Total units generated and purchased (G) excluding exports in April, 2020 = 848,621,908 kWh.
ROBERT PAVEL OIMEKE, MR/0455081
Director-General.
Extracted Entities (1)
previous_gazette_ref
3533
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General
- Date Signed
- 15th May 2020
- Page
- 14
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 87
Published 24th January 2020