Back
OTHER 79% confidence via regex

GAZETTE NOTICE NO. 3533

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.06Kenya cents per kWh for all meter readings to be taken in May, 2020. 15th May, 2020 Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units Purchased in April, 2020 Hydropower Plant (KWh.) Gitaru 68,277,000 Kamburu 34,222000 Kiambere 77,551,000 Kindaruma 15,043,380 Masinga 261,000 Tana 12,586,479 Wanjii - Sagana 852,784 Ndula - Turkwel 26,1871,350 Gogo 494,120 Sondu Miriu 42,172,000 Sangoro 13,787,070 Regen-Terem 2,402,706 Chania 148,809 Gum 2,735,669 Total units purchased from hydropower plants with capacity equal to or above 1MW = 297,405,367 kWh Total units generated and purchased (G) excluding exports in April, 2020 = 848,621,908 kWh. ROBERT PAVEL OIMEKE, MR/0455081 Director-General.

Extracted Entities (1)

previous_gazette_ref

3533

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Director-General
Date Signed
15th May 2020
Page
14
Extraction Method
regex