Back
ACT 58% confidence via regex

GAZETTE NOTICE NO. 1936

GAZETTE NOTICE NO. 1936

THE COMPETITION ACT

(No. 12 of 2010)

ACT


PURSUANT to the provisions of section 18 (5) of the Competition Act, 2010 ("the Act"), it is notified for general information that in exercise of the powers conferred by section 18 (1) (a) of the Act, the Competition Authority intends to carry out a sector study into the regulated and unregulated digital credit markets in Kenya under financial support from Innovations for Poverty Action (IPA). Financial Sector Deepening (FSD-Kenya) and IPA will also extend technical support to this study. The main objective of the study is to identify and address potential consumer protection concerns in the regulated and unregulated digital credit markets. The specific objectives of the study will include— (a) provide evidence regarding the size and nature of the digital credit market; (b) identify potential consumer protection risks and consumer outcomes within Kenya's digital credit sector; (c) increase transparency and comprehensiveness of product information and terms and conditions; (d) address probable fraud in digital financial services; (e) improve consumer redress for digital credit products; (f) increase consumer control over personal information to expand choice and competition; and (g) inform the development of policies to aware adequate consumer protection across regulated and unregulated lenders and equal protection of all Kenyan consumers. &XXI, hvivhaed Mitigasicrt Afeappys Drat *04 • Preece* widiiiiroper shielding scaffolds, ,diction and transportation • Spraying water. machinery Suspended • Dont. cellection and particles, SO2 desulphurization techniques. lerimbuStiOn 01 cod, fuel br"" heavy oil) CO2 FrorMetittiff heat heat to sea smoke emission *Cricers,wear riroteitiVe masks. Periodic latitintettimee and repair. tractors Effect on plant • Avoid valuable plantecosystems site. life ecology cr;nshUen machinery fla Melt as bulldozers, mentors, and Loss ofmarine • Design. brine pipe:otrtfall, with proper ports, life which, can increase, the mixing of the brine discharge. , , , • There will be no risk of decommissioulau, the brine is diluted constantly., and after decommissioning the seawater will beterit used to be in just hours by itself, with tideamoisnas. • Extend the brine discharge pipe by at least lksn to discharge at least in. the amok of h*waPa creek. Eradication of • Survey before construction to determine if Site vegetation affect contains rare or endangered species. • animal ecology The zone affected by dredging must be limited as narrow as possible. Noise-affect local Sird population Intake, drainage and conveyance Pilatlinecaffect flow regime and substrate • The seabed affected, must be matinee* with proper beckfilling. • Brine must, be neutlelized to adequate pH, before discharging. Noise dampening. Installation of stop flow facilities is necessary *deal with direct nuort sedimentation. Effect of drainage numagetnent , -rapid discharged alkaline (brine) surrounding seawater. dilution of within the conflict ;in land • Undlitrairn A dispetaiou model that simulates and analyzes in order to assess the proposed reject point andixitential alternatives. Cartain relevant ownership documents before construction. • Maintain cordial relationship with Shim La Tewa. 66Maird TI'S '.4,A 1223 In conduntinalbtlti*P!;4,NY.7- (n) elteil. WS We 110009f:Cit Weetider• irt such places andsin tin* nth minmanoWnrueefone,inf the proper 4tacberfle• its functiCatiK. (b) will receive views from members of the publi, and receive Oral and written submissions from any peraon with relevant inforMatien: and Any pot*y frfalt:athObt the Authority' Mai require ortnation from in.ffintheralleketa jite altak calutundekan,obligation privide the information ia Ant 4494ffence under asellOn 18 (6) of the Competition Act, 2010. Members of the public with relevant information may submit oral or within submissions to the Secretariat within twentrooe 01) days of peel. of this Ft9tice• The Seeretaviat of the' studs/14MM benbased at the 'Authority's offices located at Kea .Ya Reliways Staff Retirement ileneat &beg*, Block D, 114 Pt i304, Halle genuine 4f..;fillite, P.O. BOX 161654/200, Nairobi, E-natal: infrOcalt.go.ke, Tel.: +254-20-2628233. WA,NG'OMBE KA:ma MR/0786584 Director-General.

Extracted Entities (1)

previous_gazette_ref

1936

Details

Act / Legislation
THE COMPETITION ACT
Reference
No. 12 of 2010
Section
section 18 (5)
Page
50
Extraction Method
regex