Back
OTHER
79% confidence
via regex
GAZETTE NOTICE NO. 3080
PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -
(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.16 Kenya cents per kWh for all meter readings to be taken in April, 2020.
Information used to calculate the WRMA levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Units Purchased in March, 2020
Hydropower Plant (KWh.)
Gitaru 88,702,000
Kamburu 39,274,000
Kiambere 99,750,000
LKindaruma 20,061,090
Masinga 380,000
Tana 13,592,696
Wanjii -
Sagana 874,589
9th April, 2020
Units Purchased in March, 2020
Hydropower Plant (KWh.)
Ndula -
Turkwel 35,262,400
Gogo 481,982
Sondu Miriu 44,278,000
Sangoro 11,307,220
Regen-Terem 2,238,215
Chania 126,266
Gura 2,577,867
Total units purchased from hydropower plants with capacity equal to or above 1MW = 358,906,325 kWh
Total units generated and purchased (G) excluding exports in March, 2020 = 978,148,111 kWh
ROBERT PAVEL OIMEKE, MR/0455081
Director-General.
Extracted Entities (1)
previous_gazette_ref
3080
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General
- Date Signed
- 9th April 2020
- Page
- 12
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 64
Published 13th February 2020