GAZETTE NOTICE NO. 3080

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II - (A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.16 Kenya cents per kWh for all meter readings to be taken in April, 2020. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units Purchased in March, 2020 Hydropower Plant (KWh.) Gitaru 88,702,000 Kamburu 39,274,000 Kiambere 99,750,000 LKindaruma 20,061,090 Masinga 380,000 Tana 13,592,696 Wanjii - Sagana 874,589 9th April, 2020 Units Purchased in March, 2020 Hydropower Plant (KWh.) Ndula - Turkwel 35,262,400 Gogo 481,982 Sondu Miriu 44,278,000 Sangoro 11,307,220 Regen-Terem 2,238,215 Chania 126,266 Gura 2,577,867 Total units purchased from hydropower plants with capacity equal to or above 1MW = 358,906,325 kWh Total units generated and purchased (G) excluding exports in March, 2020 = 978,148,111 kWh ROBERT PAVEL OIMEKE, MR/0455081 Director-General.

Extracted Entities (1)

previous_gazette_ref

3080

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Director-General
Date Signed
9th April 2020
Page
12
Extraction Method
regex