GAZETTE NOTICE NO. 1258

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II - (A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.11 Kenya cents per kWh for all meter readings to be taken in February, 2020. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units Purchased in January, 2020 Hydropower Plant (KWh.) Gitaru . 75,188,000 Kamburu 37,935,000 Kiambere 107,305,000 K indaruma 18,581,650 Masinga 1,483,000 Tana 13 516,856 Wanjii — Sagana 1,015,894 Ndula Turkwel 37,922,340 Gogo - 593,645 Sondu Miriu 43,953,000 Sangoro 14,761,650 Regen-Terem 2,636,536 Chania 106,944 Gura 2,086,477 Total units purchased from hydropower plants with capacity equal to or above 1MW = 357,085,992 kWh Total units generated and purchased (G) excluding exports in January, 2020 = 995,409,219 kWh ROBERT PAVEL OIMEKE, MR/0455081 Director-General.

Extracted Entities (1)

previous_gazette_ref

1258

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Director-General
Page
18
Extraction Method
regex