GAZETTE NOTICE NO. 7474

GAZETTE NOTICE NO. 7474

THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT

(No. 8 of 1999)

REGISTRATION


Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment. Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, National Housing Corporation, is proposing to construct a fourteen-storey residential building (ground floor plus 14 floors) comprising of 182 units. The building will comprise 180No. one bedroomed units, 2No—studio/commercial units, walkways, gate- house, landscaped gardens, courtyards, driveways, parking, and other associated facilities and amenities on Plot L.R. No Eldoret Municipality block 11/42 in Uasin Gishu County. The following are the anticipated impacts and proposed mitigation measures: 9th August, 2019 THE KENYA,GAZETTE Impacts Proposed Mitigation Measures Air pollution • Frequent wetting of access roads to suppress and prevent fugitive dust generation. • Maintenance of effective exhaust systems on vehicles. • Watering of exposed soil areas. • Cover soil stockpiles and haul truck loads. • During the transportation, construction materials shall be covered with tarpaulin. • Workers must be provided with personal protective equipment. • The site will be fenced. Solid waste • All wastes shall be handled in accordance with generation the provisions of EMCA, Waste Management Regulations, 2006. • The proponent shall contract aNEMA licensed waste handler for proper waste disposal. • Regular collection of wastes for disposal at designated sites. • Prohibit littering by construction personnel. • Construction.waste will be recycled or reused. • The contractor shall designate on-site waste storage areas, provide adequate amount of waste storage facilities, and protect stored wastes from potential runoff by rain or wind. Increased water • Curing water will be sprayed on concrete demand structures and free flow of water not allowed. • Sensitize the workers on water conservation measures. Effluent • Effluent waste shall be connected to the generation existing sewer, line aystem; • Regular inspection and maintenance of the sewerage system. Increased traffic • Use adequate signage and impose appropriate maximum speeds. • Designate a route for vehicles entering the site. Noise and • Construction activities shall only be carried out excessive during the day to minimize disruption. vibrations • The workers will be provided with PPEs. • Engines shall be turned off when not in use. • The contractor shall sensitize the truck drivers on noise reduction. • Machinery and equipment in use to be serviced regularly. • The contractor shall ensure compliance with the Environmental Management and Co- ordination (Noise and Excessive Vibration Pollution) (Control) Regulations, 2009 on permissible noise levels. Social and • The contractor will employ workers from the economic immediate area to avoid social conflict. impacts • Sensitize workers on good behavior and the need to co=exist with the neighbors. • The contractor shall employ security personnel to protect constructor assets as well as the staff on site. • Sensitize workers on prevention of STDs, HIV and voluntary counseling and testing. • Workers not from area will be sensitized to respect and obey the local customs and, social norms of the area. Impacts Proposed Mitigation Measures • Establish a code of conduct for the workers. • The contractor shall ensure that there is adequate street lighting within the site. Soil erosion • Dispose of excavated material at a designated site. • Stabilize exposed areas susceptible to erosion by planting vegetation. • Top soil will be stockpiled and used for landscaping. • Control construction activities especially during rainy conditions. Excavation during, dry season and proper management of excavated soils. • Clearing all debris from site as soon as construction is over. Ocupational • Provision of clean drinking water, adequate health and toilet facilities, solid waste disposal system; safety • Provision of Personal Protective Equipment (PPEs) to all workers. Guarding of dangerous machine parts and maintenance of equipment. • Provision of a first aid kit on site. • Adequate provision of firefighting equipment. • All applicable laws and regulations pertaining to health and welfare at the workplace of the people will be adhered to. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (c) County Director of Environment, Uasiti Gishu County. The National Environment Management Authority invites I members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/6738811 National Environment Management Authority. GAZETTE NorncE No. 7475 THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT (No, 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED ASBESTOS DISPOSAL (LANDFILL) SITE AT TSANGATSINI ON PLOT L.R. NO. MATSAVINI 2- TSANGATSINI, MARIAKANI IN KILIFI COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Wiro Ventures Limited, is proposing to establish an asbestos disposal landfill on a bare piece of land of approximately 237 hectares on plot L,R. No. Matsavini 2-Tsangatsini in Mariakani, Kilifi County. The following are the anticipated impacts and proposed mitigation measure: Impacts Proposed Mitigation Measures Biodiversity • Preserve as possible indigenous trees and other surrounding vegetation that need not be removed. Air quality • Establish air quality monitoring systems. • Implement operational management plans to ensure that the system is being maintained properly. • Appoint a dust monitoring system to monitor and analyse dust and air quality. • Air monitoring should be done continuously in areas related to asbestos removal works. Storm water • Ensure all storm water from the site is directed management towards the established water drains. • Asbestos disposal site shall be marked clearly as hazardous material. • The asbestos will be appropriately contained and sealed to minimize exposure. • The asbestos prior to removal should be treated with a wetting agent to minimize asbestos dust. • Asbestos should be handled and disposed by skilled and experienced professionals. • The removed asbestos will not be reused. • The disposal and cleaning activities should be limited from 7 a.m. or sunrise (whichever is later) to 5 p.m. or sunset. • The company shall not permit any person to work in an environment in which he or she would be exposed to asbestos in excess of the prescribed occupational exposure limit. • The contractor will employ workers from the immediate area to avoid social conflict. • Workplaces to be maintained in a clean state and are free of asbestos waste. • Inspections should be done to ensure that temporary storage site is cleaned to a satisfactory standard. • Training on the potential health risk caused by exposure to asbestos and how to reduce these risks. Traffic and • Provision of safe passages and crossings for pedestrian pedestrians be made. safety • Active management by trained and visible staff at the site, if required for safe and convenient • passage for the workers. • Ensuring safe and continuous access to office facilities, shops and residences during disposal and cleaning activities. • Signposting, warning signs, barriers and traffic diversions. • Site should be clearly visible and the workers warned of all potential hazards. Solid waste • Inform cleaning and disposal workers of their responsibilities in terms of the EMP. • Place all general/dcimestic waste in refuse bins. • Collect waste paper generated at the work site in scrap paper bins. Management of • Ensure management of temporary waste temporary storage sites is in line set procedures and legal Impacts Proposed Mitigation Measures waste requirements. Spill control/emergency storage sites measures and training. • Register and monitor waste volumes at the temporary waste storage site; • Oversee the physical removal of the waste from the temporary waste storage sites. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (c) County Director of Environment, Kilifi County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, Mft/6708515 National Environment Management Authority. GAZETTE NcrricE No. 7476 THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED MIXED USE DEVELOPMENT (BUSINESS BAY SQUARE) ON PLOT L.R. Nos. NAIROBI BLOCK 36NI1/1059, 1060, 1061,1062, 1063, 1064,1065, 1066, 1067,1068, 1069, 1070, 1072, 1073,1074 AND 1075 ALONG GENERAL WARUINGI STREET IN EASTLEIGH ESTATE, KAMUKUNII CONSTITUENCY IN NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS • Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project The proponent, Ten Commodities Wholesale Limited, is proposing to set up a mixed use development(Business Bay Square) comprising of wholesale and retail stalls, a hotel, 3 blocks of residential units, a mosque and parking silos on plot L.R. Nos. Nairobi Block 36N1I/1059, 1060, 1061, 1062, 1063, 1064, 1065, 1066, 1067, 1068, 1069, 1070, 1072, 1073, 1074 and 1075 along General Waruingi Street in Eastleigh Estate, Kamukunji Constituency in Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures High demand of • Source building materials from local suppliers construction who use environmentally friendly processes in raw materials their operations. • Ensure accurate budgeting and estimation of actual construction material requirements. • Ensure that damage or loss of materials at the construction site is kept minimal; • Use at least 5%40% recycled, refurbished or salvaged materials. Increased solid • Use of an integrated solid waste management waste system. Asbestos management Disposal scheduling Asbestos exposure Occupational health and safety 9th August, 2019 THE KENYA GAZETTE 2925 Impacts. Proposed Mitigation Measures generation • Accurate estimation of the sizes and quantities of materials required. • Construction materials left over at the end of construction will be used in other projects rather than being disposed off. • Ensure that damaged or wasted construction materials will be recovered for refurbishing and use in other projects. • Donate/sell recyclable/reusable or residual materials. • Use of durable, long-lasting materials. • Provide facilities for proper handling and storage of construction materials. • Purchase of perishable construction materials. • Use building materials that have minimal or no packaging. • Use construction materials containing recycled content when possible and in accordance with accepted standards. • Reuse packaging materials. • Dispose waste more responsibly by dumping at designated dumping sites or landfills only. • Waste collection bins to be provided at designated points on site. • Private waste disposal company to be contracted to transport and dispose the solid waste from site. • Running educational campaigns amongst employees. • Vehicle idling time shall be minimized. • Sensitize truck drivers to avoid unnecessary racing of vehicle engines at loading/offloading points and parking areas. • Ensure strict enforcement of on-site speed limit regulations. • Ensure adequate dust mitigation measures are in place such afl dust nets around the construction site. • Sprinkle water on graded access routes. • Sensitize construction vehicle drivers and machinery operators to switch off engines of vehicles or machinery not being used. • Sensitize construction drivers to avoid gunning of vehicle engines or hooting. • Ensure that construction machinery is kept in good condition. • Ensure that all generators and heavy-duty equipment are insulated or placed in enclosures. • Comply with the provisions of Environmental Management and Co-ordination (Noise and Excessive Vibration Pollution) (Control) Regulations, 2009 regarding noise limits at the workplace. • Ensure electrical equipment, appliances and lights are switched off when not being used. • Install energy saving fluorescent tubes at all lighting points. • Ensure planning of transportation of materials to ensure that fossil fuels (diesel, petrol) are not consumed in excessive amounts. Impacts Proposed Mitigation Measures • Monitor energy use during construction and set targets for reduction of energy use. High water • Install water conserving taps that turn-off demand automatically when water is not being used. • Promote recycling and reuse of water as mucb as possible. • Promptly detect and repair of water pipe and tank leaks. • Sensitize staff to conserve water. • Ensure taps are not running when not in use. Generation of • Provide clean and adequate sanitary facilities wastewater for construction workers. • Monitor effluent quality regularly. Increased • Ensure that all building plans are approved by accidents and the Local Authority and the loCal dangerous Oceupational Health and Safety Office. occurrence • Registration of the premises as a workplace under the Occupational Safety and Health Act, 2007 laws of Kenya is mandatory. • Enforcing adherence 'to safety procedures and preparing contingency plan for accident response. • Safety education and training shall be emphasized. • Ensure that the premises are insured as per statutory requirements (third party and the Work Injury Benefit Act, No. 13 of 2007). • A general register should be kept within the facility as stipulated in sec. 122 and 123 of the Occupational Safety and Health Act, 2007. • Securely fence or cover all openings on floors. • Ensure that construction workers are not locked up such that they would not escape in case of an emergency. • Equipment such as fire extinguishers must be examined by a government authorized person. • Provide measures to deal with emergencies and accidents including adequate first aid arrangements. • Well stocked first aid box which is easily available and accessible. • Provision must be made for persons to be trained in first aid and firefighting, with certificates issued by a recognized body. Increased health • Suitable, efficient, clean, well-lit and adequate risks and sanitary conveniences should be provided for issues construction workers. • Arrangements must be in place for the medical examination of all construction employees. Insecurity • providing day and night security guards and adequate lighting within and around the construction site. • Body-search the workers on entry. • Eniure only authorized personnel get to the site. • • Security alarms will be installed. The full report of the proposed project is available for inspection during working hours at (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (c) County Director of Environment, Nairobi City County. Increased dust and exhaust emission Noise and vibration Increased energy consumption The National Environment Management Authority invites members of the public to subniit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/6708851 National Environment Management Authority.

Dated the 9th August, 2019.

GEOFFREY WAHUNGU,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

7474

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, National Environment Management Authority
Date Signed
9th August 2019