Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 9490
GAZETTE NOTICE NO. 9490
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
Pursuant to Regulation 21 of the-Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an Environmental, Impact Assessment Study Report for the above proposed project
The proponent, African Gas and Oil Company Limited, is proposing to install additional LPG import pipeline and phase IC bulk
LPG mound on plot No. MN/VI/4838 in Miritini, Mombasa County.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Air pollution • Control speed of vehicles and prohibit idling.
• Spray water during construction.
• Maintenance of vehicles and equipment regularly.
• Provision of dust masks for use in dusty conditions.
• Use serviceable vehicles/machinery to reduce smoke.
Excess noise and • Use noise hearing protection devices when vibration working with noisy equipment or noisy environment.
• Use serviceable equipment with low noise emission.
• Instruct truck/machinery operators to avoid raving engines.
Generation of
• County Government/NEMA to provide waste solid waste dumping site.
• Engage a NEMA Registered Waste Collection
Firm.
• Excavation activities to be done during the dry season to avoid soil erosion and siltation of streams.
• Site soil to be used to backfill excavated sites.
• Provide communal solid waste collection containers (skip) for the collection and storage prior to appropriate disposal.
Generation of
• Construct a paved containment for storage of liquid waste oils and other liquid chemicals being used in the construction site.
• Provide containers for storage of used oils from vehicles /machines/equipment being used at the construction site.
• Engage a NEMA Registered Firm for th;
collection, transportation and appropriate disposal of used oil.
Risk of fire
• Provide firefighting equipment at the construction site area.
• Contractor staff to be sensitized on firefighting equipment use.
• No burning of materials is to be permitted at the site.
Potential • No disposal of domestic waste at the project pollution of site.
surface and
• Provision of used oil containers at a central groundwater point.
• Use of waste bins/proper waste management.
• Pave parking area for trucks and direct drainage to containment.
• Analysis of water at the site area 2 times a year.
Safety of workers • Use of construction site harrier tapes to isolate and other the site(working) area to bar intruders from visitors to accessing the area in case of a dropping object.
construction site
Appropriate head, hand and foot protection
(PPE) during the manual clearing of vegetation and construction activities.
• Construction site visitors require appropriate safety gear.
• inspection, maintenance, and replacement of fall protection equipment.
• Provide first aid facilities at the site.
Impacts
Proposed Mitigation Measures
Health issues of
• Sensitize workers and community on sexually construction transmitted diseases especially STIs and workers and
H1V/AIDS.
community
• Sensitize workers on use of protection facilities like mosquito nets, appropriate gear when working in waterlogged area to avoid
Bilharzia.
• Facilitate the development of a Health facility at the project area together with ministry of
Health and interested donor agencies.
Increase in social • Conduct information education and vices/security communication (IEC).
concerns
• Hold meetings between contractor staff and community.
• Have regular police patrols at the beginning of project development.
• Collect information on persons coining into the project area to settle during project implementation.
• Construction of effective drainages and culverts.
• Plant soil binding grasses and other native plants.
• Installation of appropriate sanitary facilities.
• Having a monitoring programme for septic tanks.
• Contractor to be strictly advised not to engage any underage persons (under 18 years of age).
• Contractor will be required to comply with
Employment Act, 2007.
The full report of the proposed project is available for. inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi.
(c) County Director of Environment, Mombasa County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
MAMBO B. MAMBO, Ag. Director-General, MR/6656362
National Environment Management Authority.
Dated the 4th October, 2019.
MAMBO B. MAMBO,
Ag. Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
9490
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMBO B. MAMBO
- Title
- Ag. Director-General, National Environment Management Authority
- Date Signed
- 4th October 2019
- Page
- 31
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 132
Published 4th March 2019