Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 7143

GAZETTE NOTICE NO. 7143

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


Pursuant to Regulation 21 of the Environmental Manageinent and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, ACME Dream Limited, is proposing to construct a modem commercial hotel comprising 225 hotel rooms, one gate, a cleaners' store, parking and drive ways, generator house and shops, associated facilities and amenities on L.R. No.I5136 in Embakasi area in Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Air pollution • Soil exposure to the elements should be over relatively short periods of time. • Off-site disposal of construction debris. • Watering all active construction areas as and when necessary to lay dust. • Cover all trucks hauling soil, sand and other loose materials. • Apply water when necessary. • Sweep daily all paved access roads, parking areas and staging areas. Noise and excessive • Workers on site should be provided with vibrations appropriate noise PPEs. • Regular servicing of vehicles and machinery. • Limit vehicle and other small equipment to an idling time of five minutes. • Vehicles should be properly maintained and the exhaust systems should be muffled as required. • All construction activities must be limited to between 8 a.m. and 5 p.m. during weekdays and 8 a.m. and 1 p.m. on Saturdays. • No heavy construction activities/ noise generating activities shall be undertaken on Sundays and public holidays. • No blasting of stones if any shall be carried out within the project without prior notice. Generation of solid • Procure the services of a NEMA licensed wastes. waste handler to manage solid wastes. • All recyclable materials should be collected and sent to a NEMA licensed company for recycling. • Use of durable, long-lasting materials. • Purchase of perishable/ high risk construction materials when needed. • Use of building materials that have minimal packaging. Occupational • The contractor will provide all workers and health and safety visitors with relevant and appropriate Personnel Protective Equipment (PPEs) and ensure their use. • Workers to be trained on equipment use. • First aid facilities to be available on site. • Contractor to comply with the requirements of the Occupational Safety and Health Act (OSHA). Soil erosion and • Terracing and leveling the project site. impeded drainage Construction vehicles will be restricted to designated areas. • Compacted areas will be ripped to reduce run-off • Install silt fences to control sedimentation and surface run-off from the site. • Construction vehicles should use designated routes and enter and leave the site at Controlled points only. • Speed bumps with corresponding signage will be put in place. • Walkways will be protected by the placement of temporary barriers. • Contractor and the proponent are expected to adhere to Nairobi City County Government traffic by-laws and Kenya traffic laws. • Develop water abstraction plan. • Abstraction licenses should be obtained from the required authorities. • Contractor to generate water utility management plan. • Contractor to minimize damage to public water utilities. • Sensitize construction workers on the importance of proper water management. • Replace or repair leaking pipes supplying water to the construction sites. • Reuse of waste water from the construction activities. Possible pollution • Maintenance, re-fuelling and cleaning of from waste oil and equipment. fuel spills • The site design should incorporate oil sumps at the parking areas to isolate oil spills. • No solid waste, fuels or oils shall be discharged on land surface or into drains. • All machinery must be keenly observed not to leak oils on the ground. • All oil _products and materials should be stored in site stores or in the contractor's yard. Radiological • Control exposure to ionizing radiation. impacts • Control contribution from external exposure. • Personal monitoring for radiation impacts exposure at the facility. Socio-economic • Employ workers from the immediate area impacts where feasible. • Establish a code of conduct for the workers. • All communications with the community should be documented. Increased traffic flow Pressure on water resource and on public water supply 2nd August, 2019 THE KENYA GAZETTE 2795 Impacts Proposed Mitigation Measures • Display communicative posters within site on HIV/AIDS related messages. • Employ security personnel to protect contractor assets. • Ensure the site has adequate lighting and signage. • Keep ,records of entry and exits for people and vehicles and materials to site. • Issue workers with uniforms or name tags and strictly enforce their use. Increased demand • The contractor to ensure prudential use of for water water resources. • Sensitize construction workers on the importance of proper water management. • Replace or repair leaking pipes supplying water. • Reuse of waste water. • Direct construction water runoff to areas where it can soak into the ground or be reused. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal 'Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (c) County Director of Environment, Nairobi City County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/6738784 National Environment Management Authority.

Dated the 2nd August, 2019.

GEOFFREY WAHUNGU,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

7143

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, National Environment Management Authority
Date Signed
2nd August 2019
Page
46
Extraction Method
regex