GAZETTE NOTICE NO. 3548
PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.67 Kenya cents per kWh for all meter readings to be taken in April, 2019.
Information used to calculate the WRMA levy.
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Units Purchased in March, 2019
Hydropower Plant (KWh.)
Gitaru 77,461,000
Kamburu 40,972,000
Kiambere 60,782,000
Kindaruma 19,019,190
Masinga 17,075,000
Tana 2,163,127
Wanjii 1,729,999
Sagana 173,494
Ndula 0
Turkwel 57,109,000
Gogo 407,109
Sondu Miriu 3,849,000
Sangoro 1,135,000
Regen-Terem 569,553
Chania 6,338
Gura 290,509
Total units purchased from hydropower plants with capacity equal to or above 1MW, 282,742,319 kWh
Total units generated and purchased (G) excluding exports in March, 2019 = 994,454,056 kWh
ROBERT PAVEL OIMEKE, MR/5353451 Director-General.
1460 1460
Extracted Entities (1)
previous_gazette_ref
3548
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General
- Date Signed
- 12th April 2019
- Page
- 21
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 45
Published 12th January 2019