Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 6611

GAZETTE NOTICE NO. 6611

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations. 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed Project The proponent, Athi Water Service Board, is proposing to improve Githunguri sanitation project. This project will comprise of 2No. outfall sewers to drain approximately 90% of the Githunguri urban area, a new 2900m3/day Sewerage Treatment Plant (STP), a new network for the two catchments, and other associated facilities and amenities in Githunguri Constituency. Kiambu County. 19th July, 2019 THE KENYA GAZETTE 2627 The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Vegetation • Re-plant vegetation as much as practically clearance possible once work is done. • Limit vegetation clearance unless unavoidable. Air quality • Maintain construction equipment at operational conditions. • Carry out earth moving under dump conditions as much as possible. • Piled materials should be maintained dump to prevent emission of dust. • Notify the immediate neighbours on potential odours during excavations. • Sprinkle water regularly at the construction site to suppress dust. • Provide workers with PPEs. Noise and excessive • Clearly label the high noise areas. vibrations • Provide workers with PPEs such as ear muffs. • Equipment should be fitted with standard noise attenuation features. • Inform local residents when construction activities are likely to generate excessive noise. • Sensitize truck drivers to avoid hooting especially when passing through sensitive areas such as hospitals, churches and residential areas. Drainage and • Excavated channels to follow contours to hydrology avoid interference with surface drains. disruption • Drains along the construction line should be directed towards existing drainage system. • Level excavated ground where necessary and cover water and sewer lines laid in the ground. • Ensure compliance with environmental laws. Interruption of • Formal request for permission to cross, existing facilities break in and lay the pipelines should be sought from affected property owners. • Develop a work plan with clear responsibilities for each part. • Work in collaboration with the local community to ensure replacement of disrupted community water pipes that will be affected. Solid waste • Develop a comprehensive waste management plan prior to commencement of works. • Provide properly labelled and strategically placed waste disposal containers. • Litter bins should have secured lids to prevent birds and animals scavenging. • All personnel shall be instructed to dispose off all waste in a proper manner. • Recycling of construction materials shall be practiced where practical. • Earth spoils shall be disposed of in predetermined sites. Impacts Proposed Mitigation Measures Liquid wastes • Contaminated water should be directed to a conservancy tank for removal from the site. • Poiential pollutants of any kind shall be kept, stored and used in such a manner that any escape can be contained. • No grey water runoff or uncontrolled discharges from the site or working areas. Hazardous wastes • Ensure that the machines and equipment are in good condition to prevent oil pollution. • Ensure proper handling of lubricants, fuels and solvents during maintenance. • Any chemical or fuel spills shall be cleaned up immediately. • Proper storage of fuel, oil and bitumen. Public health and • Ensure proper and periodic maintenance of safety sewer lines and treatment plant. • Create awareness among the community members to not dump solids in manholes. • Develop an inventory system of the components for monitoring. • Regular cleaning of grit chambers and sewer lines. • Design manhole covers to withstand anticipated load and ensure that broken covers are readily, replaced. Occupational health • Provide workers with PPEs. and safety • Provide temporary toilets and bathrooms for the workers at the work sites. • Provide onsite first aid kit accessible to the workers whenever needed. • Control persons allowed to access the site for their safety. • Provide Health and Safety Plan prior to the commencement of work. • Adhere to the provisions of Occupational Health and Safety Regulations of 2007. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (c) County Director of Environment, Kiambu County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/6017457 National Environment Management Authority.

Dated the 19th July, 2019.

GEOFFREY WAHUNGU,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

6611

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, National Environment Management Authority
Date Signed
19th July 2019
Page
32
Extraction Method
regex