GAZETTE NOTICE NO. 5282
GAZETTE NOTICE NO. 5282
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
AUTHORIZATION
Pursuant to Regulation 21 of the Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environnient Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Mater Limited, is proposing to, construct an eight storey building ',kick (ground floor plus 8 floors' comprising of 144 units. The ground floor will comprise 45No.vehicle car .park and '
1No.retaiI outlet unit. Floors 1-8 will comprise 6No.2 bedroomed apartments and 12No.1 bedroomed apartments, driveways, sidewalks and other associated facilities and amenities on Plot L.R. No.
209/11011/3; off Moses Tanui Road, Imara Daima in. Nairobi City
County.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Exploitation of • Source building materials from local raw materials suppliers who use environmentally friendly processes in their operations.
• Ensure accurate budgeting and estimation of actual construction material requirements to ensure that the least amount of material necessary is ordered.
• Ensure that damage or loss of materials at the ,construction site is kept minimal through proper storage.
Use atleast 5%-10% recycled, refurbished or salvaged materials to reduce the use of raw materials and divert material from landfills.
Storm water
• Surface runoff and roof water shall be management harvested and stored in underground reservoir tanks for reuse..
• Apply soil erosion control measures such Is leveling of the project site to reduce run-off velocity and increase infiltration of storm water into the SOH.
• Ensure that construction vehicles are restricted to existing graded roads to avoid soil compaction within the project site.
• Ensure that any compacted areas are ripped to reduce run-off.
Impacts Proposed Mitigation Measures
• Use construction materials containing recycled content when possible and in accordance with accepted standards.
• Dispose waste more responsibly by dumping at designated dumping sites or landfills only.
Increased energy • Ensure electrical equipment, machinery and use lights are switched off when not being used.
• Install energy saving fluorescent tubes at all
' lighting points instead of bulbs which consume higher electric energy.
• Ensure planning of transportation of materials to ensure that fossil fuels (diesel, petrol) are not consumed in excessive amounts.
• Monitor energy use during construction and set targets for reduction of energy use.
Air pollution • Provide 2.4 m high hoarding along site boundary.
• Provide effective dust screen, sheeting or netting where a scaffolding is erected around the perimeter of a building.
• Water all active construction areas when necessary.
• Cover all trucks hauling soil, sand and other loose materials.
• Down wash of trucks (tyres) prior to departure from site.
•
• Personal Protective equipment to be worn by all staff members.
• Vehicle idling time shall be minimized.
• Alternatively fuelled construction equipment shall be used where feasible equipment shall be properly tuned and maintained.
Occupational health • Provide adequate well stocked first aid and safety boxes across the site and adequately train all staff on basic first aid administration.
• Adequate warning/inductions and instruction signs must be prominently displayed on the project site.
• Ensure that workers at the site are adequately protected through provision of suitable personal protective gears.
• Limit public access to the construction site.
• Ensure that all construction machines/ equipment are operated by experienced personnel and regularly serviced in order to avoid any accidents.
Increased traffic • Ensure all construction vehicles to and from obstruction the construction site use the designated
Entry/Exit to the project site.
• All transportation of construction raw materials and excavated materials are to be conducted at traffic off peak hours only.
• Sensitize truck drivers to avoid unnecessary road-obstruction.
• Cover all trucks hauling soil, sand and other loose materials to avoid spillage and dust emissions that may interfere with smooth motoring.
The full report of the proposed project is available for inspection during working hours at:
Impacts
Surface and groundwater
,contamination
Increased water demand
Solid waste generation
Noise and excessive • vibrations
Proposed Mitigation Measures
• Open drains all interconnected will be provided on site.
• Hazardous substance control and emergency response plan that Will include preparations for quick and safe clean-up of accidental spills.
• Hazardous-materials handling procedures to reduce the potential for a spill during construction to be prescribed.
• Identify areas where refueling and vehicle maintenance activities and storage of hazardous materials, if any, will be permitted.
• Ground water, will be collected during construction contained and disposed of in accordance with all applicable regulations.
• Connect to the existing NW&SCo main supply.
•. Harness rainwater for construction activities usage.
• Install a discharge meter at all water outlets to determine and monitor total water usage.
• Promptly detect and repair of water pipe and tank leaks.
• Ensure taps are not running when not in use.
Sensitize construction vehicle drivers and machinery operators to switch off engines of vehicles or machinery not being used.
• Use quiet equipment (i.e. equipment designed with noise control elements such as mufflers).
• Install portable barriers to shield compressors and other small stationary equipment where necessary and locate stationary noise sources as far from existing sensitive receptors as possible.
• Ensure that construction machinery are kept in good condition to reduce noise generation.
• Ensure that all generators and heavy duty equipment are insulated or placed in enclosures to minimize ambient noise levels.
• Use of an integrated solid waste management system i.e. through a hierarchy of options including: Source reduction, Recycling, Reuse, Combustion and Sanitary land filling.
• Through accurate estimation of the sizes and quantities of materials required, order materials in the sizes and quantities they will be needed.
• Ensure that construction materials left over at the end of construction will be used in other projects rather than being disposed off.
• Ensure that damaged or wasted construction materials will be recovered for refurbishing and use in other projects.
• Provide facilities for proper handling and storage of construction materials to reduce the amount of waste caused by damage or exposure to the elements.
• Use building materials that have minimal or no packaging to avoid packaging waste.
14th June, 2019 THE KENYA GAZETTE 2241
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box. 30126-00100, Nairobi.
(c) County Director of Environment, Nairobi City County.
The National Environment Management Authority invites members of the public to submit oral or written comments, within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY•WAHUNGU, Director-General, MR/6338007 , National Environment Mahagement Authority.
GAZE= NOTICE No. 5283
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED DUALLING OF EASTERN AND
NORTHERN BYPASS ROADS IN KIAMBU AND NAIROBI CITY
COUNTIES
INVITATION OF PUBLIC COMMENTS 4
Pursuant to Regulation 21 of the. Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an Environmental Impact 'Assessment Study Report for the above proposed projects
The proponent, Kenya Urban Roads Authority, is proposing to undertake the duelling of both the Eastern and the Northern Bypasses involving increasing the current two lanes to four lanes, construction of service lanes and roads in highly developed locations, construction of overpasses and underpasses, construction of footbridges and.
footpaths and provision of matatu bus stops.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Material sourcing • Construction materials will be sourced from approved sources.
• Contractor to prepare a tacking document of materials received vis a vis utilization to ensure proper materials management to avoid wastage.
Biodiversity loss • Contractor to ensure clear delineation of construction work areas to avoid unnecessary vegetation clearance.
• Obtain prior authorization for felling trees
' from relevant authorities.
• Where invasive species are identified, disposal of cleared vegetation will be done a manner as not to allow for invasive species to be transferred in other areas.
Blockage of access • Inform the property owners prior to start of of properties the work in places where accesses may be adjacent to the blocked.
bypasses
•. Provide temporary alternative accesses to the affected properties.
• For Embakasi Garrison, Administration
Police Training College, Embakasi and
General Service Unit Training School, Embakasi, KURA should liaise with the
Inspector-General and the Principal
Impacts
Proposed Mitigation Measures
Secretary, Ministry of Defence, for guidance on how to handle their accesses during the construction phase.
Interruption of • Timely -liaison with the affected service existing utility providers to ensure that the relocation of infrastructure services is done first before we kick-off any construction activities in that area.
• Observe the requirements of the Kenya
Roads Act, 2007 section 27 when handling utility infrastructure and services along the
A8 road and A8-South.
• Liaise with service providers to ensure that all the affected consumers are notified of the anticipated. inconveniences at least one week prior to disruption as well inform them the date of reinstatement.
• Design team will consult with utility providers to ensure proper accommodation of the utilities in the new designs.
Soil management. • Adopt soil conservation best practice method.
• Ensure clear delineation of construction work areas to avoid unnecessary vegetation clearance and soil loosening.
• Implement planned erosion control measures to avoid erosion in areas that are prone to erosion.
• Where possible, vegetation clearance and excavation activities will be scheduled to occur outside of the rainy season, to reduce the anticipated volume of runoff during construction.
Noise pollution and • Workers shall use ear protectors when vibration performing noisy operations.
• Post appropriate notices to warn drivers against unnecessary hooting of vehicles.
• Switch off engines or reduce idling time when not in use..
• Noise levels at the construction site boundary should be kept within acceptable limits of 60 dB(A) during the day and 35 dB(A) during the night as stipulated within the Environmental Management and Co- ordination (Noise and Eicessive Vibration
Pollution) (Control) Regulations, 2009.
• Dust suppression by regularly spraying water on the diversion roads and work sites.
• Wetting or covering stockpiles in dry weather.
• Covering loaded trucks during the transportation of material.
• Activities generating dust (excavation, blasting, handling and transport of soils) to be carried out in calm weather.
• Strict adherence to Air quality Regulations, 2014.
• Provision of suitable, segregated and well labelled solid waste containers to proper disposal of the wastes.
Proper segregation of solid waste prior to disposal.
• Reuse of top soil for landscaping of the site.
• Reduction of generation of solid waste at the source.
Air control
Solid waste generated
Impacts Proposed Mitigation Measures
• The contracts for project employees will detail codes of conduct with regard to interaction with the local community, use of public and social amenities in the locality, handling of complaints from the local community.
Oil and fuel spills • Vehicle/machinery maintenance will be done on purpose-built impervious concrete platforms With oil and grease traps. •
• Ensure that all .equipment 'Are • in 'good condition, clean and five" front leaks.
• Excavated material to be stockpiled at designated locations within the construction zone as approved by the Resident
Engineer/Consulting Engineer.
Increased storm • KURA together with relevant authorities water generation such as Nairobi City County and Kiambu
County Government should ensure that the storm water drainages along the two bypasses are well maintained and functional to avoid flooding incidences.
HIV/AIDS • The Contractor in collaboration with local health facility will carry out HIV/AIDS sensitization, awareness and management for both skilled and semi-skilled staff on site.
• Provide condoms at strategic points within the contractor's camp, dispensers near lodges and hospitals where people are likely to pick them.
• Liaise with the nearest VCT centres to offer visit services to workers and neighbouring community.
• We will institute STIs and HIV/AIDS awareness and prevention campaign amongst workers for the duration of the contract.
Occupational health • The contractor to employ traffic marshalls to and safety -ensure flow of traffic in diversions and construction sites. ' •
• The contactor should provide adequate
Personal Protective Equipment (PPE) for use by the workers .
• Conduct relevant training to workers e.g.
training on proper use of PPE and safety issues.
Land acquisition • The proponent will compensate land and asset owners for loss of land or properties.
before the project commences.
The full report of the proposed project is available for inspection during working hours at:
(a) Director—General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi.
(c) county Director of Environment, Nairobi City and Kiambu
Counties.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director—General, NEMA, to assist the Authority in the decision making process of the, plan, GEOFFREY WAHUNGU, Director-General, MR/6338292
National Environment Management Authority.
Impacts
Proposed Mitigation Measures
• Contract a licensed waste handler as stipulated in the Environmental
Conservation and Management (Waste
Management) Regulations, 2006.
Polliition and • Implement Standard Operating Procedures sedimentation of
(SOPs) for working in water.
existing natural water sources
• Storage areas for fuels, oils or any other liquid chemical will be located far away from surface drains.
• Hydrocarbon/chemical storage areas will be built with an impermeable base and bund with a capacity of 110% and would not drain directly into the surface water drains. Where necessary, drainage from storage compounds would be passed through oil interceptors prior to discharge.
• In case of soil contamination, the contaminated soil will be handled as hazardous waste and will be properly removed from site and disposed off safely as required by the Environmental Management and Coordination (Waste Management)
Regulation, 2006.
Increased Water
• Ensure that water is used efficiently at the demand site by sensitizing construction workers to avoid irresponsible water use.
• An assessment and evaluation of the identified water sources should be done against the estimated water demand during construction. These details should be provided to the Water Resource
Management Authority before a license for abstraction is issued.
Waste water
• Properly channel all grey water runoff or management uncontrolled discharges from the site/working areas (including washdown areas) to nearby water courses.
• Discharge any water containing pollutants such as cements, concrete, lime, chemicals and fuels into a conservancy tank for removal from site.
• Potential pollutants of any kind and in any form will be kept, stored and used in such a manner that any escape can be contained so as the water table not endangered.
• Develop a wastewater management plan and emergency procedure on remedying any pollution incidents on site.
Traffic impact
• Develop an implementable traffic mragement plan.
• Install temporary road signs that are visible both during the day and at night indicating road works and restrictions along the active construction sites.
• We will plan schedules for construction traffic and update it on a regular *basis.
• Set aside parking bays for heavy goods vehicles and public transport vehicles where feasible.
Negative social
• Establish a community liaison system to change handle any complaints from the community.
• We will establish a grievance management system to handle internal and external complaints.
.414th June, 2019 THE KENYA GAZETTE 2243
Dated the 14th June, 2019.
Extracted Entities (1)
previous_gazette_ref
5282
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 27
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 14th June 2019
- Page
- 29
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 77
Published 4th April 2019