Back
COMPLETION OF DEVELOPMENT PLAN
100% confidence
via regex
GAZETTE NOTICE NO. 3151
GAZETTE NOTICE NO. 3151
THE PHYSICAL PLANNING ACT
(Cap. 286)
COMPLETION OF DEVELOPMENT PLAN
NOTICE is given that the preparation of the above development plan was on llth March, 2009, completed.
The development plan relate to land situated within Busia
Municipality.
Copies of the development plan as prepared has been deposited for public inspection at the Office of County Physical Planning Officer, Basta and office of Chief Officer, Lands, Housing and Urban
Development, Busia County.
The copies so deposited are available for inspection free of charge by all persons interested at the the Office of County Physical Planning
Officer, Busia and office of Chief Officer, Lands, Housing and Urban
5th April, 2019 THE KENYA GAZETTE 1287
Wastewater
Oil pollution
Solid waste management
Impacts
Storm water
Proposed Mitigation Measures engineering controls.
• Monitor quality of stack emissions.
• Use of air—conditioned, closed cabins where necessary.
• Install dust extraction systems.
• Dust reduction through engineering and administrative measures.
• Air ventilation (suction).
• Workers to use appropriate PPE.
• Obtain air Emission license from NEMA as required under Air Quality Regulations, 2014.
• Storm water should be separated from prpcess and sanitary wastewater streams.
• Runoff should be minimized and the peak discharge rate be reduced (e.g. through landscaping, retention ponds etc.).
• Oil water separators and grease traps should be installed and maintained as appropriate along the drainage channels.
• Drainage channels should be lined with impervious surface to minimize soil erosion.
• Proper storage, handling and disposal of new oil and used oil and•related wastes.
• Provide oil interceptors along the drains leading from car wash areas.
• Maintenance of construction vehicles should be carried out in the contractor's yard (off the site).
• Recycle and reuse where applicable.
• Segregate for appropriate disposal.
• Process and Technological improvement to minimize waste generation.
• Material substitution to minimize waste generation.
• Waste disposal as provided for in the
Environmental Management and
Coordination (Waste Management)
Regulations, 2006.
• Provide appropriate waste handling receptacles.
• Safe disposal of electronic waste.
• Adaption of water conservation measures.
• Formulation of an elaborate Waste Water
Management Plan.
• Segregation of wastewater streams.
• Treatment of wastewater to meet national standards for sanitary wastewater discharge before release into the environment.
• Obtain an Effluent Discharge License from
NEMA for discharge into the environment.
• Quarterly monitoring of wastewater quality as required under Water Quality
Regulations, 2006.
Impacts Proposed Mitigation Measures
• Using personal protective equipment.
• Minimizing the work time required in high temperature environments by implementing shorter shifts.
• Use of air- or oxygen supplied respiratPrs.
Occupational health • Conduct a workplace risk assessment.
and safety
• Conduct Safety and Health Audits on annual Basis.
• Conduct Fire Safety Audit on annual Basis.
• Installation of fire detection and fire fighting system.
• Training of workers on occupational safety, health and welfare.
• Provision of appropriate Personal
Protective Equipment and clothing to all workers.
• Training and sensitization programme.
• Medical examination of exposed workers.
• Full compliance with requirements of
OSHA, 2007 and its subsidiary legislations.
• Formulation of Environment, Health and
Safety Policy. •
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi.
(c) County Director of Environment, Nakuru County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFPREY WAHUNGU, Director-General, MR/6024687
National Environment Management Authority.
Dated the 5th April, 2019.
GEOFPREY WAHUNGU,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
3151
Details
- Act / Legislation
- THE PHYSICAL PLANNING ACT
- Reference
- Cap. 286
- Signed By
- GEOFPREY WAHUNGU
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 5th April 2019
- Page
- 68
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 39
Published 6th February 2019