Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via regex

GAZETTE NOTICE NO. 2668

GAZETTE NOTICE NO. 2668

THE MINING ACT

(No. 12 of 2016)

COMPLETION OF DEVELOPMENT PLAN


NOTICE is given by virtue of section 34 of the Mining Act that an application for a mining licence, whose details and area boundary schedule are as described here below, has been made under section 101 of the Act and the said application has been accepted for consideration. Applicant Mombasa Cement Limited Address P.O. Box 83594-80100, Mombasa, Kenya Application No. ' ML/201 8/0047 Area 0.1056 km2 (Approx. 2 CBs) Within Land Parcels Bedzombo/Kitsoenil633, Chonyi/Bedzombo/736, Bedzombo/Kitsoeni/ 104 1, BedzombofKitsoeni/633 Bedzombo/Kitsoeni/813 Locality Kilifi County Mineral(s) Sought Shale/slate/Jaspilite/Schist(Dimension stones), Shale/Brickclay Any objection to the grant of the mining licence may be made in writing and addressed to the Cabinet Secretary, Ministry of Petroleum and Mining, P.O. Box 30009-00100, GPO, Nairobi, Kenya to reach him within forty two (42) days from the date of the publication of this notice in the Kenya Gazelle. SCHEDULE OF THE PROPOSED APPLICATION BOUNDARIES The proposed application's area is particularly described by the following WGS 84 co-ordinates. Deg. Mm. Sec. Long. Deg. Log. Mm. Lon Sec. 1 3 42 08.90 5 39 45 37.00 E 2 3 42 15.00 5 39 45 41.80 E 3 3 42 20.40 S 39 45 48.20 E 4 3 42 1 23.20 1 5 1 39 45 '49.20 E - 5 3 4 1 20.70 1,S 1 39 45 1 35.40 E 6 3 42 1 10.50 1 S 1 39 45 1 32.60 E The said application may also be accessed from the mining cadàstre portal vide web site: - https://portal.miningcadastre .go.ke Dated the 5th March, 2019. JOHN MUNYES, MR/60 19564 Cabinet Secretary, Ministry of Petroleum and Mining. GAZETTE NOT)CE NO. 2669 THE MINING ACT (No. 12 of 2016) APPLICATION FOR A MINING LICENCE NOTICE is given by virtue of section 34 of the Mining Act that an application for a mining licence, whose details and area boundary schedule are as described here.below, has been made under section 101 of the Act and the said application has been accepted for consideration. Applicant National Cement Company Limited Address P.O. Box 333194)0600 Application No. ML/2018/0036 Area 0.8636 km2 (Approx. 4 Cadastral Blocks). Within Land Parcel(s) Loitokitok/Mbirikanil730 Locality Merueshi Area within Kajiado East and South Sub-counties, Kajiado County Mineral(s) Sought Group A: Construction and Industrial Minerals Any objection to the grant of the mining licence may be made in writing and addressed to the Cabinet Secretary, Ministry of Petroleum and Mining, P.O. Box 30009-00100, GPO, Nairobi, Kenya to reach him within forty two (42) days from the date of the publication of this notice in the Ken'ya Gazette. SCHEDULE OF THE PROPOSED APPLICATION BOUNDARIES The proposed application's area is particularly described by the following WGS 84 co-ordinates. * )rder Lot. Deg. Lot. Mm. Lat.Sec. WS Long. Deg. Deg. Long. . Mm. Mm. Long. Sec. E/W 2 26 03.56 S 37 - 32 21.89 E 2 2 26 04.59 5 37 32 16.15 E 3 2 26 46.62 S 37 32 10.70 E 4 2 27 35.00 S 37 32 05.96 E 5 2 28 44.25 S 37 32 03.55 E 6 2 28 45.13 5 37 32 08.18 E 7 2 27 32.82 S 37 32 13.60 E 8 2 26 54.18 S 37 32 14.06 E The said application may also be accessed from the mining cadastre portal vide web site: - https://portal.miningcadastre.go.ke Dated the 28th February, 2019. JOHN MLJNYES, MR/60 19575 Cabinet Secretary, Ministry 0/Petroleum and Mihing. GAZETFE NOTICE No.2670 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLANS PDP No. 131 .KLF.1 .2018—Existing Sires for Public Utilities, Mariakani PDP No. 1341KLF1212018—Existing Site for Open Air Market, Kilfi PDP No.1341KLFIJ12018—Proposed Access Road, Kilifi PDP No. 1341KLF14120 18—Existing Site for Garbage Collection Point, Kilifi PDP No. 1341KLF1312018—Existing Site for Public Utility, Kilifi PDP No. 2091KLF/112018—Existing Bus Park, Kaloleni PDP No. 1271KLF1112018—Existing Site for Children Playground, Mtwapa PDP No. 1271KLF1212018—Existing Site for Mtwapa Dispensary, Mtwapa PDP No. 122IKLF1312018—Proposed Sewer Treatment Site, Mtwapa PDP No. 1471KLF/112018—Existing Health Center, Mtondia PDP No. 212/KLF/1/2018—Existing Site for Agricultural Demonstration, Tezo Notice is given that preparation of the above part development plans are complete. The part development plans relate to sites situated within Kilifi, Kaloleni, Mariakani and Mtwapa, Mtondia and Tezo townships, within Kilifi County. Copies of the part development plans as prepared have been deposited for public inspection at Mariakani, Mtwapa and Kaloleni Town/Sub-County Administrators Offices, respectively and at the County Physical Planning Office, Kilifi. The copies so deposited are available for inspection free of charge by all persons interested at Mariakani, Mtwapa and Kaloleni Town/Sub-County Administrators Offices, respectively and at the County Physical Planning Office, Kilifi, between 8.00 am, to 1.00 am, and 2.00 p.m. 105.00 p.m., Monday to Friday. Any interested person who wishes to make any representation in connection with or. objection to the above named part development plans may send such representation in writing to be received by the County Chief Officer for Housing, Physical 'Planning and Urban Development, P.O. Box 519, Kilifi, not later than sixty (60) days from the date of this notice and such representation or objection shall state the grounds on which it is made. Dated the 11th February, 2019. MOSES M. GUNDA, Chief Officer for Housing, Physical Planning MR/60 19998 and Urban Development. GAZETFE NoTIcE No. 2671 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT '(Cap. 387) IN EXERCISE of the powers conferred by sectioO 119 of the Environmental Management and Co-ordination Act, the Director-' General is mandated to designate laboratories by gazette notice for analytical or reference purpose. The Director-General designates the following as analytical laboratories for purposes of the Act. Laboratory I Function Parameter Authorized i Signatory Bureau Veritas AssessmenU1 Physical I Branch Laboratory, Analysis of I • Chemical Manager, Authorized Laboratory Function Parameter Signatory P.O. Box41622-80100, • Water • Microbiology • l.aboratory Mombasa . Effluent Manager Tel:+254(41)3 14463/31 Laboratory 4022 Analyst. Fax +254(41)226015 E-mail: Itd.mombasa@bureauve ritus .com - Location: Moi Avenue, Mombasa Precision Experts Assessment/ • Physical • Laboratory Limited Laboratory, Analysis o Chemical Manager P.O Box 42806-80 100, • Water Microbiology • Laboratory Mombasa • Effluent Head Tel+254729170640 E-mail: info@precisionexpert.co .ke Location: Shimanzi Road, Mombasa Lake Victoria South Assessment/ Physical Laboratory Water Service Board Analysis of • Chemical Head P.O Box 3325-40100 • Water • Microbiology Deputy Kisumu • Effluent Head Tel:+254(0)57-2025'l 28, +254(0)716525251 ±254(00202157233, Fax:±254(0)572025 127 E-mail: info@lvswaterboard.go. ke Location: Lavictors House, Millimani, Kisumu Spectralab Analytical Assessment/ •Physical Laboratory Services Limited, Analysis •Chemical Head P.O Box 50208-00200, • Water Microbiology Technical Nairobi • Effluent • Pesticides Manager Tel:020651 177,0775602 a Sludge •Hydrocarbons Senior • Soil Chemist Mobile:07740881 11 • Plant Email: material info@Spectralab.co.ke Food Location: Abc Bank Building, Dar-es-Salam •petroleum Road, Nairobi Aqualytic Laboratories Assessment Physical Quality Ltd / • Chemical Manager P.O Box 4600-056 Analysis of Microbiology Technical Nairobi • Water . Manager Tel:0722547344, 020- • Senior 5249675 Laboratory E-mail: Technologist lab@aqualiticlabs.com Location: Ramco Court, Mombasa Road Inorganic Laboratory Assessment • Air quality • Regional Gas Measurement ' / Manager Section, KEBS, •Analysis • Head of P.O. Box 54974-00200, of Air Testing Nairobi Tel:254206005490, 6005506 Mobile:0722202137/8, 07346004 171/2 E-mail: info@kebs.org Location: Nairobi Angie Aqua Solutions • Assessme . Physical . Laboratory Limited, nt/ • Chemical head P.O. Box 20999-00200, • Analysis • Microbiology• Laboratory Nairobi of analyst Tel: 0700220727, • Water 0796177342 • Effluent E-mail: angieaquasdolution@gm 22nd March, 2019 THE KENYA GAZETTE 1117 Laboratory Function Parameter Authorized Signatory ail.com Location: Fair Bank Arcade, Maimahiu Road Lab Works (Ea) • Assessme Physical . Laboratory Limited, nt/ • Chemical Manager P.O Box 47846-00100, b Analysis • Microbiology • Technical Nairobi of • Noise level Manager Tel: 0726209641, • Water • Senior Field 0202724481 • Air Supervisor E-mail: • Soil info@labworksea.com • Noise Longonot Road, Upper hill. CSI International • Assessm Physical Head of Limited, ent /analysis • Chemical laboratory P.O. Box 47846-00100, of 'Microbiology . Laboratory Nairobi • Water manager Tel:0705204610, • Effluent . Quality 0725692535 • Air assurance Email: manager info@csinternationalke. co.ke Quick Mall Langata, Nairobi Dated the 13th April, 2018. GEOFFREY WAHUNGU, Director-General, MR/55 18246 National Environment Management Authority GAZETFE NoTICE No.2672 THE ENVIRONMENTAL MANAGEMENT AND. CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED RESIDENTIAL APARTMENTS DEVELOPMENT ON PLOT L.R. NO. 209/3289 OFF OLOITOKTOK ROAD, ALONG KANGUNDO ROAD IN KILELESHWA AREA, WESTLANDS SUB-COUNTY,NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Tian Yu International Company Limited, is proposing to construct four blocks (A, B, C and D) of fourteen (14) leveled residential apartment building comprising a total of two hundred and ten (210) units. The ground floor (upper and lower ground floor) will consist of 3No. 210 basement parking, 2No. generator rooms, 8No. lobby areas, 2No. garbage collection points and drive-way. Block A will comprise of 98No. one bedroom units (7No. units on each floor), Blocj B will comprise of 56No. two bedroom units (4No. units on each floor), and Block C and D will comprise of 56No. two bedroom units on each block (2No. units on each floor) and other associated facilities and amenities on plot L.R. No. 209/3289 off Oloitoktok Road, along Kangundo road in Kileleshwa area, Westlands Sub-County in Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Exploitation of • The contractor will obtaio raw materials for the raw materials construction from sources that are compliant with NEMA Regulations. Impacts Proposed Mitigation Measures • The contractor will procure quantities that are sufficient for the intended works only and recycle as far as practical to curtail wastage. • The contractor will commit to extensive use of recycled raw materials as will be appropriate and in a manner that does not compromise the safety of the development. Effluent • The waste water from the premises will be discharge connected to the existing sewer line that serves the area. • Conduct regular inspections for waste water pipe blockages or damages and fix appropriately. • Ensure regular monitoring of waste water discharged from the project to ensure that the stipulated sewage/effluent discharge rules and standards are not violated. • All drain pipes passing under the building, driveway or parking should be of heavy duty PVC pipe tube encased in 150mm conôrete all round. • All manholes on driveways and parking areas should have heavy duty covers Set and sealed airtight s approved by specialists. • All waste pipes should be accessible from outside and free to every part of the system for inspection, cleaning and repair. Increased water • Installation Of flush toilets with low volume demand cisterns and high pressure. • Waste water recycling and rain water harvesting: • Immediate repair of water pipe and tank leaks. • Install water conserving taps that turn-off automatically when water is not being used. • Ensure taps are not running when not in use. Noise and • Workers working with machinery, vehicles and excessive instruments that emit high levels of noise should vibrations be provided with ear plugs and ear muffs. • Proper servicing of mhinery and equipment (oiling, greasing etc.). • Installation of portable barriers to shield compressors and other small stationary equipment where necessary. • Construction activities to be carried out between 8.00 am. —5.00 p.m. • Monitor noise levels as per NEMA guidelines. Solid waste • Order materials in the sizes and quantities they gçneration will be needed. • Use excavated soil for backfilling and landscaping. . • Use solid waste management system i.e. through a hierarchy of options: source reduction; recycling; composting and reuse; combustion; sanitary land filling. • Provide facilities for proper handling and storage of construction materials to reduce the amount of waste caused by damage or exposure to the elements. • Reuse materials such as cartons, cement bags, steel metals, and plastic containers to reduce waste. • Dispose the excess excavated soil and any other waste by use of a licensed waste hauling company. Impacts Proposed Mitigation Measures increased • Switch off electrical equipment, appliances and energy use lights when not in use. • Install occupation sensing lighting at various locations such as storage areas which are not in use all the time. • Tap solar energy for heating and lighting purposes. • Install energy saving at all lighting bulbs. • Monitor energy use during the operation of the project and set targets for efficient energy use. • Sensitize residents in use of energy efficiently. Air pollution • Spray water on exposed areas during dry weather to suppress dust. • Cover loads of friable materials during transportation. • Building under construction to be covered with adequate screens to contain dust particles. • Stock piles to be covered with tarpaulins. • Control speed of construction vehicles and switch off machines when not in use. • Regularly service and maintain vehicles and mobile plants and machinery. • Provide personal protection equipment to workers. Occupational • Provide adequate well stocked first aid boxes health and across the site and adequately train all staff on safety basic first aid administration.. • Adequate warning/inductions and instruction signs must be prominently displayed on the project site. • Ensure that workers at the site are adequately protected through provision of suitable personal protective gears. • Limit public gccess to the construction site. • Ensure that all construction machines/ equipment are operated by experienced personnel and regularly serviced in order to avoid any accidents. Fire hazards • Installation of an automatic fire alarm system for the building. • Provision of firefighting equipment and hydrant points. • Display fire excavation procedures and emergency at strategic points in the building. • Regular maintenance of fire electrical and first aid equipment. • Provision of emergency exit and fire assembly points. The full report of .the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Forestry, NF Building, Community, P.O. Box 30126-00100, Nairobi. County Director of Environment, Nairobi City County The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MRJ60 19791 National Environment Management Authority.. GAZETFE NOTICE No.2673 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED 53 KM 220 KV TRANSMISSION LINE (TL) FROM MARIAKANI-DONGO KUNDU TO SUPPLY ELECTRICITY TO THE MOMBASA SPECIAL ECONOMIC ZONE (MOMBASA SEZ) IN DONGO KIJNDU, MTONGWE LOCATION, LIKONI SUB-COUNTY IN MOMBASA COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Kenya Electricity Transmission Company Limited, is proposing to build a 53 Km, 220kV transmission Line (TL) from Mariakani-Dongo Kundu to supply electricity to the Mombasa Special Economic Zone (Mombasa SEZ) to be built in Dongo KundU, Mtongwe Location, Likoni Sub-County in Mombasa County. The project will comprise: development of 220 kV overhead double circuit transmission line supported by steel-lattice type transmission towers from Mariakani 400/220 kV Substation to Mombasa SEZ; development of 220/33 kV substation inside. Mombasa SEZ, th& substation will mainly consist of transformers (75 MVA x 2 units), control building and access road; and development of 33 kV overhead double circuit distribution line (supported by concrete pole/foundation) inside Mombasa SEZ from 220/33 kV substation. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Environmental • Regular inspection of vehicles and degradation machines for oil and fuel leaks. Leaking vehicles and machines to be removed until repaired. • Maintenance activities to be conducted at designated faciities with appropriate pollution control. • Spill response kit to be readily available at the construction site. • Fuel tanks to be installed on an impermeable base with bunds. Air pollution • Implement regular maintenance and vehicles emitting visible pollutants. • Construction vehicles without inspection certjficate will not be allowed to operate. • Slow driving on dusty roads within the community area. • Regular water spraying of access road. • Cover truck loading bed when transporting loose materials such as rOck, sand and mud. • Avoid to the extent possible passing through sensitive areas. Noise and excessive Equipping vehicles and machinery with vibrations exhaust mufflers and carry out proper maintenance. • Instructing truck and machinery operators to avoid raving of engines. • Avoiding as much as possible use of roads that pass through sensitive areas. • Avoiding as much as possible the conducting of noisy works during night time. 22nd March, 2019 THE KENYA GAZETTE 1119 Impacts Proposed Mitigation Measures • Locate towers at least over distance of 25 in from the nearest structure. Safety and health • Use of safety harness during working at risks to personnel height. • Install barriers around excavated pits. • Engage only qualified operators. • Use of PPE. • Construction contractor to prepare an Occupational Health and Safety Plan in accordance to Kenyan laws and regulations. Water pollution • Exposed cut and fill slopes at the substation/access road to be protected as soon cut and fill works are completed. • Install temporary erosion control measures as necessary. • Stockpiles to be covered by sheet. • Temporary construction yard to be located as far as, possible from surface water bOdies and wetlands. Waste • Minimize waste generation through reuse and recycling. • Use transformer oil free of PCBs. • Wastes to be handled and disposed only by NEMA authorized firms. • Waste disposal containers tobe provided onsite for each waste category. • Oil pit to be regularly emptied and kept in containers for disposal by NEMA approved firms.. • Preparation of Waste Management Plan (WIvIP) that identifies the different wastes that will be generated and their proposed disposal procedure Conservation area • Before commencement of construction, hold meetings with Kaya elders to inform about the construction schedule and works, and consult for necessary mitigation measures. Prohibit entrance of construction workers inside the Kaya. • Establish temporary construction yard as. far as possible from the Kaya. • Use as far as practical low-noise' construction machines. The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. County Director of Environment, Mombasa County The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHIJNGU, Director-General, MR16019731 National Environment Management Authority. GAzarrE NOTICE No. 2674 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED MEDICAL CYCLOTRON FACILITY FOR CANCER MEDICAL IMAGING, OFF FALCON ROAD, INDUSTRIAL AREA IN NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Advanced Molecular Imaging Limited, is proposing to refurbish and equip an existing godown (go down no. 9) with medical cyclotron facility equipment and tools. The project will. comprise; the ground floor will comprise loading/ unloading area, dispatch area, storage area, packing, hot lab, gowning room, clan room and waste material room, Q.C. lab, cyclotron area; there also will be parking spaces; the first floor will comprise offices, meeting room, training centre and pantry, and associated amenities and facilities. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Noise pollution . Ensure that all vehicles and construction machinery are kept in good condition all the time to avoid excessive noise generation. Ensure that all workers wear ear muffs and other personal protective gear/equipment when working in noisy sections. • Undertake loud noise and vibration level activities during off-peak hours during the day (i.e. preferably between 12.00 noon and 2.00 p.m.). • Comply with conditions provided by the Environment Management and Co-ordination, Noise and Excessive Vibrations Pollution Control Regulations, 2009. Air pollution • Maintenance of plant and equipment and sensitize workforce. • Turn off vehicle engines when idle. • Operations to be done during the day only. Solid Waste • Workers to be encouraged to segregate waste management from the source, use the 3R Management Approach: Reduce, Reuse and Recycle. • Limit waste quantity by proper planning. • Godowns management to be carrying out inspections within and around the building. • Godowns management staff to have a functional waste management system. • Waste disposal bins to be placed in all departments in the godowns. • Comply with provisions of the Environmental Management and Co-ordination, Waste Management Regulations, 2006. Radiological • Workers to wear radiation badge while in the Safety building only. • Workers should not bring food, drinks, makeup or their packaging in the working area, especially cyclotron room. Impacts Proposed Mitigation Measures Cyclotron room • Ventilation and air changes shall be in and possible accordance with DIN 6844, Pt 1. exhausts • The cyclotron roon pressure shall be maintained at negative pressure relative to, the surrounding areas. • All exhaust from cyclotron and chemistry enclosures must pass through a proper filtration. • Monitoring system to meet national and local safety code requirements. • Specified temperature and humidity levels are maintained during daily operation. Fire • Hoses and fire extinguishers are checked and maintained on schedule for continued operability. • Necessary fire related training. • Implement monitoring programs, parameters and procedures for control and corrective actions in case of emergencies, e.g. fire and workplace accidents. - • Fire training' sessions for all employees are carried out, with practical demonstrations on how to combat fire. Occupational Provide and enforce use of appropriate health and protective gear, -dust masks, protective shoes safety etc. • The godowns construction site to be Out of bounds to unauthorized intruders, food vendors orjob seekers. • Develop liaison with health provision arms for emergency response. • Provide security services within the godowns. • All firefighting equipment to be constantly inspected by authotizeU agents for continual operability. • Staff of the godowns to have at least one trained First Aider, aware of firefighting techniques, precautions etc. The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. County Director of Environment, Nairobi City County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, M'/60 19509 National Environment Management Authority.

Dated the 5th March, 2019.

JOHN MUNYES,

19564 Cabinet Secretary, Ministry of Petroleum and Mining.

Extracted Entities (1)

previous_gazette_ref

2668

Details

Act / Legislation
THE MINING ACT
Reference
No. 12 of 2016
Section
section 34
Signed By
JOHN MUNYES
Title
19564 Cabinet Secretary, Ministry of Petroleum and Mining
Date Signed
5th March 2019
Page
31
Extraction Method
regex