Back
REGULATION
90% confidence
via regex
GAZETTE NOTICE NO. 1178
GAZETTE NOTICE NO. 1178
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No.8 of 1999)
REGULATION
Pursuant to Regulation 21 of the Environmental Management and
Co-ordination (Impaet Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Al-Sherman Limited, is proposing to carry out salt works on a section of L.R. No. 13536. This parcel of land is located in
Kilifi County, Magarini Sub-county, Fundi Issa Location, Marereni
Sub-location, Adu Ward at Musumarini Area
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Vegetation clearing • Vegetation to only be cleared from the actual areas where the salt ponds will be constructed.
and associate support infrastructure.
Large trees such the Baobab within the project area to be preserved.
• Management to plant more trees and other vegetation in open areas
• Management to support tree planting in areas outside the proposed project site such as in schools, health centers, compounds of religious institutions.
Air quality • Water sprinkling on dusty surfaces to be done to minimize fugitive dust.
• Flooding with water opened areas for construction of salt pans to be done during dry spells and windy conditions to reduce clouds of dust.
• Ensure construction equipment are properly serviced and maintained to minimize noise and vibration.
Soils disturbance • Minimize soil erosion by planting vegetation on all open areas of the proposed project Site where salt pans will not be constructed.
Noise and vibration • Ensure construction equipment are propealy from site serviced and maintained to minimize noise equipment use and vibration.
Generation of • Provide for adequate capacity settling ponds effluent from raw for handling effluent from salt washing.
salt washing
Effluent from salt washing to be channeled into settling ponds were sediments settle down and the resulting clear saturated brine recycled back to salt washing.
• Scoop out settled sediments fromnhe settling ponds and use them to fill low-lying areas with the salt works.
The design of the salt works should as much as possible avoid construction of perimeter dykes that are parallel to the coastline.
Avoid construction of dykes at or close to the high water mark.
Increased waste . Recycle and reuse waste including water.
generation
Exercising appropnate waste handling and good housekeeping practices and procedures.
.. Strict Adherence to Waste Management
Regulations, 2006.
Increased • Water pumps at the pump stations to be electricity demand solar energy power as opposed to drawing and use energy from the grid.
Increase fresh • The proponent should not source freshwater water demand and to be used at the salt works from local use community water wells.
Solid waste • All solid waste to be generated to be handled generation and disposed as provide for in the
Environmental Management and
Impacts
/ Proposed Mitigation Measures
Coordination (Waste Management)
Regulalions 2006.
• Waste oil an'd any other liquid waste to be generated to be handled and disposed as provided for in the Environmental
Management and Coordination (Water
Quality) Regulations 2006.
Labour Influx
• First priority to be given to people from the local community when recruiting workers for the operational phase.
• Unskilled and semi-skilled labor who will be hired during the operational phase of the proposed salt works to be strictly sourced from the local community.
• During the operational phase of the proposed salt works, required skilled labor to be sourced out of the local community after exhausting those available in the local community.
Blockage of local
• The design of the salt works should ensure ephemeral that no local ephemeral 'stream or any other streams surface water body flowing through sections of the proposed project site is blocked or its natural course altered.
• Project proponent to ensure that the proposed project to comply with all the provisions of the Water Act 2016 and its relevant subsidiary legislations.
Blockage of • All the community beach access road that community beach pass through sections of the, proposed access routes project site to be identified and appropriately documented.
• Design of the proposed salt works to factor in the access roads and ensure that they are not interfered with.
• In a case . wherç an existing community beach access road has to be altered consultations with the local community together with the local leadership to be don;
first to obtain consensus prior to the change.
The full report of the proposed project is available for inspection during working hours at:'
Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi.
County Director of Environment, Kilifi County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR/58 15447 National Environment Management Authority.
GAZETFE NoTIcE NO. 1179
TROPICAL TOWER LIMITED
DISPOSAL OF UNCOLLECTED GooDs
NOTICE is issued pursuant to the Disposal of Uncollected Goods
Act (Cap. 38) of the laws of Kenya, to the owner of motor vehicle reg.
No. KCP 981P Toyota Land Cruiser TX to take delivery of the said motor vehicle which is currently lying at Tropical Towers, Komo
Lane, Nairobi, within thirty (30) days from the date of publication of
Blockage of free flow of tides within the creek from constructed dykes
8th February, 2019 THE KENYA GAZETTE 375 this notic'e upon payment of storage charges, together with other Costs that may be owed including cost of publication and any other incidental costs, failure to which the same shall be disposed off under the Disposal of Uncollected Goods Act, either by public auction, tender or private treaty and the proceeds of the sale be defrayed against all accrued charges without any further reference to the owner.
Dated the 25th January, 2019.
J. M. GIKONYO
MR/58 18427 for Garam Invetments Auctioneers.
GAZETrE NOTICE NO. 1180
NGOMO MULTIPURPOSE CO-OPERATIVE SOCIETY LIMITED
DISPOSAL OF UNCOLLECTED GOODS
NOTICE is issued pursuant to th& Disposal of Uncollected Goods
Act (Cap. 38) of the laws of Kenya, to (1) Bank of Baroda (Kenya)
Limited, (2) Samuel Kirango Mama, (3) National Industrial Credit
Bank Limited and (4) Lidan Enterprises Limited, the registered owners of motor vehicles reg. Nos. KBS 401N and KBS 595V, to take delivery of the said motor vehicles within thirty (30) days from the date of publication of this notice upon payment of all storage charges, together with other costs including the cost of publishing this notice, failure to which the same shall be sold either by public auction or private treaty and the proceeds of the sale be defrayed against accrued charges and the balance if any, shall remain at the owners credit but should there be a shortfall, the owners bshall be liable thereof.
Dated the 5th February, 2019.
MERCY MUMO & COMPANY, Advocates for Ngomo Multipurpose
MR/5818979 Co-operative Society Limited.
GAZETI'E NOTICE No. 1181
ASTORION AUCTIONEERS
DISPOSAL OF UNCOLLECTED GOODS
NOTICE is issued pursuant to the provisions of the Disposal of
Uncollected Goods Act (Cap.38) of the laws of Kenya and following an authority and order under the miscellaneous application Case No.
29 of 2019 by the Chief Magistrate's Court, Makadara, Nairobi, to the owners Of motor vehicles and motor bikes which are lying idle and unclaimed within Kamukunji Police Station, to collect the said motor vehicles and motor bikes at the said yard within thirty (30) days from the date of publication of this notice. Failure to which Astorion
Auctioneers Nairobi shall proceed to dispose off the said motor vehicles and motor bikes by way of public auction on behalf of
Kamukunji Police Station if they remain uncollected/unclaimed:
KAMUKUNJI POLICE STATION
Motor Vehicles and Motor Bikes
Reg Number Make
KVZ 471 Datsun Saloon
KAB 215E Volkswagen Kombi
KAC 942T Nissan Bluebird
KAA 274E Mitsubishi Lancer
KBL 135W
KMDB 236X Rider
KMCL481D Skygo
KMCL 226M Dayun
KMCY 439E Jincheng
KMCF 637N Hongya
KMDB 020N Yamaha
Numberless TVS
Numberless Dayun
Dated the 17th January, 2019.
KEVIN N. GITAU, MRJ5555045 for Astorion Auctioneers.
GAZErFE NOTICE NO. 1182
LIBERTY LIFE ASSURANCE KENYA LIMITED
Head Office: P.O. Box 30364-00100, Nairobi
LOSS OF POLICY
Policy No. 6946665 in the name and on the life of Pravinchandra
Jamnadas Kakad.
APPLICATION having been made to this company on the loss of the above numbered policy, notice is given that unless objection is lodged to Liberty Life Assurance Limited within thirty (30) days from the date of this notice, a duplicate policy will be issued and shall be used as the only valid document by the company for all future transactions.
Dated the 23rd January, 2019.
CHARLES THIGA, MR/55 18320 Head of Customer Service, Liberty Life.
Dated the 25th January, 2019.
J. M. GIKONYO,
Extracted Entities (3)
previous_gazette_ref
1178
person
Samuel Kirango Mama
National Industrial Credit Bank Limited
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No.8 of 1999
- Signed By
- J. M. GIKONYO
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 25th January 2019
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 16
Published 4th January 2019