Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 11130

GAZETTE NOTICE NO. 11130

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Gingalili (1968) Limited, is proposing to construct a mixed use facility comprising of residential, commercial, educational, five star hotel and an office block on both sides of the Nakuru–Nyahururu Highway, B5 between Maili Saba and Maili Tisa. The entire project spreads over 692 acres. The following are the anticipated impacts and proposed mitigation measures Impacts Proposed Mitigation Measures Soil erosion • Control earthworks. • Management of excavation works. • Construction of appropriate drainage structures. Noise pollution and vibration • Erect signs indicating construction activities. • Ensure maintenance of all equipment. • Use of attenuated equipment. • Use barriers to shield compressors and other stationary equipment where necessary. Impacts Proposed Mitigation Measures Dust from construction activities • Provide workers with appropriate PPE. • Sprinkling water to control dust. • Use of dust screens where appropriate. Health and safety • Provide appropriate PPE to all workers. • Use trained workers for all the tasks at the site. • Ensure that a crew member is trained in first aid administration and basic fire fighting. • Place a fully equipped first aid tool box in the project site. Solid waste generation • Setting contracts with licensed waste collectors. • Practise waste segregation and recycling of recyclable waste. • Separation of waste and refuse at the source. • Sensitization training for cleaning team and tenants with the view of maintaining environmental sustainability • Using recycling bins with clear separation in public areas. For example different coloured bins for different types of waste. Social-economic impacts • Employment of people from the neighbouring areas. • Develop a Corporate Social Responsibility (CSR) programme for the community. Energy Consumption • Greener designs which maximize use of natural day light without increasing the ventilation load. • Use of natural ventilation wherever possible and solar shading. • Use of renewable/low carbon technologies such as solar water heating, photovoltaic and ground coupled water cooling systems where possible. • Use of building management systems. Water Resource • Rain water harvesting. • Put in place appropriate measures to ensure water conservation and sustainable use of available water resources. Accidents/Injuries • Put clear and adequate signage next to and along the road leading into the site. Traffic • Construction vehicles to transport materials to the construction site during off peak hours. • Put adequate signage on the construction site. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) County Director of Environment, Nakuru County. THE KENYA GAZETTE 26th October, 2018 3782 3782 The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/5342007 National Environment Management Authority.

Dated the 26th October, 2018.

GEOFFREY WAHUNGU,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

11130

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, National Environment Management Authority
Date Signed
26th October 2018
Page
87
Extraction Method
regex