GAZETTE NOTICE NO. 8156

GAZETTE NOTICE NO. 8156

THE LAND REGISTRATION ACT

REGISTRATION


WHEREAS Josh Nyamaga Onunda (deceased), is registered as proprietor of that piece of land containing 3.4 hectares or thereabout, known as West KasipulfKodera Karabach, sittratc in the district of Rachuonyo, and whereas the chief magistrate court at Oyugis in succession cause No. 36 of 2013, arid whereas all efforts made to recover the land tide deed issued in respect of the said piece of land by the land registrar have failed, notice is given that after the expiration of thirty (30) days from the date hereof, I thall &spcnsc with the production of the said land title deed and proceed with registration of forms of R.L. 19 and R.L. 7 in the name of (1) John Otieno Nyamaga, (2) Joseph Oyoo Nyamaga, (3) Gabcicl Ongondo Chiko, (4) Joshua Patrick Odhiambo and (5) Kisilah Daniel Gte, and upon such registration the land title deed issued earlier to the said kuah Nynanaga Onunda (deceaset, slmJI be deenaril lobe cancelled and of no effect. Dated the 10th Augast, 2018. E. 0. ABUNDU, MR/51 11865 Land Registrar, Rachuonyn Northl&rsg/Sowth Distress. THE ENERGY REGULATORY COMMISSION SCHEDULE OF TARIFFS 2018 FOR ELECTRICITY TARIFFS, CHARGES, PRICES AND RATES FUEL COST CHRo PURSUANT to clausc I of Part ill of the Schedule of Tariffs 2018, notice is given that all pricesfor electrical enagy specified in Part H of the said Schedule will be liable to a fuel cost charge of plus 250 Kenya cents per kWh for all meter readings to be Iáau in Auguae 2018. Information used to calculate the fuel cost charge. Power Station FuelPricein Ju& ,2018 KShiKg. (Ci) Fuel Dispiacement Charge/Far! Charge, Jusy,2018KS1r1kWh Vtarufrour Unit, m.My, 2018te k7t (G) Iwcrease/(JJ.crea,e) Juan 2018 P1'ces Kipevu I Diesel Plant 49.71 0.57 1 I,3l 000 Kipevu 11 Diesel Plant (Tsavo) 46.01 -0.15 Kipevu III Diesel PJam 51.47 4,5 4S,667,( Otb August, 2018 THE KENYA GAZETFE 2845 EmbakasiGTl -Muboroni 103.06 1.51 2,233,880 Enkuj GT 2-.Embmkasi 96.36 0 0 Rabai Diesel without steana *wbine 56.22 4.48 633,200 Rabai Diesel with steam turbine 56.22 4.48 7,882,800 Iberafrica Diesel 53.83 0.03 657,780 iberafrica Dicsel-A4ditiopal Plairt 52.75 -0.17 2,196,770 ThikaPowerDieselPiant 57.71 -1.37 1.672,600 Thiks Power Diesel Plant (with steam unIt) 57.71 -1.37 0 Gulf Power 57.73 -0.19 887,516 Triumpb Power 60.42 -0.2 686,900 Triumph Power 60.42 -0.2 0 OlkariaIVSteamChssge __________________ 2.01 -0.01 94,231,645 Olkaria I Unit IV and V SteasnChage 2.01 -0.01 88,620,626 Ue*cl lmpca't(Neaconsmercial) - 12.4 0.65 4,698,986 Uetcl import (Commercial) 17.75 0.67 3,490,304 Uetcl Export(NonC-ommercial) 12.4 0.65 -3,349,145 Uetcl Export (CommercIal) 11.51 0.55 0 Lodwar Diesel (Thermal) 137.01 5.84 899,151 Mandera Diesel (Thermal) 142,96 2.18 908,562 Marsabit Diesel (Thermal) 13166 1.17 504,439 Wajir Diesel 135.99 5.84 933,667 Moyale Diesel (Thermal) 137.15 0.92 270,626 Mciii (Thermal) 142.33 0 36,541 Ilabaiwein (Thermal) 12695 1.37 120,007 EIwak (Thermal) 139.81 3.17 83,522 Baragoi 129.6 -1.52 35,388 Mfsngano(rhermal) 16932 9.01 37,748 Loklohogio 140.83 9.14 123,150 Takabs (Thermal) 135.6 3.99 49,010 Was 127.66 0.78 26,651 RhamÜ 135.88 4.39 52,156 ______________________________ 117.93 5 20,546 North }jorr 133.93 0 8,711 Lokori 165.53 0 13,366 Diadab 120.78 0.06 94,509 FaraI,1and .i$6.96 -- -2,03 49,472 __________________________________ 139.71 0 6771 Kiunga 133,62 8.29 10,398 Kakuma 138.39 2.58 75,970 Banisa 142.51 142.51 13 Total units generated and purchaserl (G) excluding exports in July, 2018 = 951,852,359kWh ROBERT PAVEL OIMEKE, MR/4167093 Director-General. GAZETrE NoTIcE NO. 8158 THE ENERGY REGULATORY COMMiSSION SCHEDULE OF TARIFFS 2018 FOR ELECTRiCITY TARIFFS, CHARGES, PRICES AND RATES FOREIGN EXCHANGE FLUCTUATION ADJUSTMENT PURSUANT to clause 2 of Part Ill of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a fbreign exchange fluctuation adjustment of plus 5 Kenya cents per KWh for all meter readings to be taken in August, 2018. bifbmiation used to calculate the adjustment: I I KenGen (Z) Imcm LJPPS (IPPZ) I Total (ZF+ZFI+IPPZ) 1ExchseeGniWfLoss 25,086.971.75 5,940,86V.37) I a5,355,694 3,790,407.80 - - Total units generated and purchased (0) Excluding exports in July, 2018 951,852,359kWh ROBERT PAVEL OLMEKE, M114167093 Director-General. GAZE'rrENoncENo. 8159 THE ENERGY REGULATORY COMMISSION SCHEDULE OF TARIFFS 2018 FOR ELECTRICITY TARIFFS, PRICES, CHARGES AND RATES WATER RESOURCE MANAGEMENT AUTHORITY LEVY PURSUANTtoclause5ofPsztUlof the Schedule of Tariffs 2018,noticeisgiven thatall pricesfor electricalenergyspecifiedinPartil - (A) ol'the said Sebedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 259 Kenya cents per kWh for all meter readigstobe taken in August, 2018. Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units purchased in July, 2018 Hydropower Plant (Kwh.) Gitaru 113,062,000 Kamburu 36,785,000 Kiambere 107,843,000 Kindarum a 26,021,460 Masinga 23,751,000 Tana 12,568,052 Wanjii 1,304,382 Sagana 861,631 Ndula 0 Turkwel 33,956,350 Gogo 486,758 Sondu Miriu Sangoro 15,441,460 Regen-Terem 3,190,188 Chania 63,920 Gu m 0 Total units purchased from hydropower plants with capacity equal to or above 1MW 419,861,201 kWh Total units generated and purchased including hydros excluding exports in July, 2018 = 951,852,359 kWh ROBERT PAVEL OIMEKE, MRJ4167093 Director-GeneraL GAZETFE NOTICE No.8160 THE ENERGY REGULATORY COMMISSION SCHEDULE OF TARIFFS 2018 FOR ELECTRICITY TARIFFS, CHARGES, PRICES AND RATES INFLATION ADJUSTMENT PURSUANT to clause 3 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to an inflation adjustment of plus 5 cents per kWh for all meter readings taken in August 2018. Information used to calculate the adjustment: INFAKenGen JNFAKPLC INFAIPPs Last Half-year Period Inflation Costs Under/(over) Total Recovery Escalated Cost 136,019,810.00 307,058.041.95 115,553,854.62 23,518.558.21 582,150,264.78 Total projected units generated or purchased by the Company in August-December 2018- (Gp) = 4,581,346,788 kWh ROBERT PAVEL OLMEKE, MRJ4 167093 Director-General.

Dated the 10th August, 2018.

E. O. ABUNDU,

11865 Land Registrar, Rachuonyn Northl&rsg/Sowth Distress.

Extracted Entities (6)

case_number

36 of 2013

previous_gazette_ref

8156

person

John Otieno Nyamaga Joseph Oyoo Nyamaga Gabcicl Ongondo Chiko Joshua Patrick Odhiambo

Details

Act / Legislation
THE LAND REGISTRATION ACT
Signed By
E. O. ABUNDU
Title
11865 Land Registrar, Rachuonyn Northl&rsg/Sowth Distress
Date Signed
10th August 2018
Page
36
Extraction Method
regex