Back
REGISTRATION
100% confidence
via regex
GAZETTE NOTICE NO. 8156
GAZETTE NOTICE NO. 8156
THE LAND REGISTRATION ACT
REGISTRATION
WHEREAS Josh Nyamaga Onunda (deceased), is registered as proprietor of that piece of land containing 3.4 hectares or thereabout, known as West KasipulfKodera Karabach, sittratc in the district of
Rachuonyo, and whereas the chief magistrate court at Oyugis in succession cause No. 36 of 2013, arid whereas all efforts made to recover the land tide deed issued in respect of the said piece of land by the land registrar have failed, notice is given that after the expiration of thirty (30) days from the date hereof, I thall &spcnsc with the production of the said land title deed and proceed with registration of forms of R.L. 19 and R.L. 7 in the name of (1) John Otieno Nyamaga, (2) Joseph Oyoo Nyamaga, (3) Gabcicl Ongondo Chiko, (4) Joshua
Patrick Odhiambo and (5) Kisilah Daniel Gte, and upon such registration the land title deed issued earlier to the said kuah Nynanaga
Onunda (deceaset, slmJI be deenaril lobe cancelled and of no effect.
Dated the 10th Augast, 2018.
E. 0. ABUNDU, MR/51 11865 Land Registrar, Rachuonyn Northl&rsg/Sowth Distress.
THE ENERGY REGULATORY COMMISSION
SCHEDULE OF TARIFFS 2018 FOR ELECTRICITY TARIFFS, CHARGES, PRICES AND RATES
FUEL COST CHRo
PURSUANT to clausc I of Part ill of the Schedule of Tariffs 2018, notice is given that all pricesfor electrical enagy specified in Part H of the said Schedule will be liable to a fuel cost charge of plus 250 Kenya cents per kWh for all meter readings to be Iáau in Auguae 2018.
Information used to calculate the fuel cost charge.
Power Station
FuelPricein Ju&
,2018
KShiKg. (Ci)
Fuel Dispiacement
Charge/Far!
Charge, Jusy,2018KS1r1kWh
Vtarufrour
Unit, m.My, 2018te k7t (G)
Iwcrease/(JJ.crea,e)
Juan 2018
P1'ces
Kipevu I Diesel Plant 49.71
0.57 1 I,3l 000
Kipevu 11 Diesel Plant (Tsavo) 46.01 -0.15
Kipevu III Diesel PJam 51.47 4,5 4S,667,(
Otb August, 2018 THE KENYA GAZETFE 2845
EmbakasiGTl -Muboroni 103.06 1.51 2,233,880
Enkuj GT 2-.Embmkasi 96.36 0 0
Rabai Diesel without steana *wbine 56.22 4.48 633,200
Rabai Diesel with steam turbine 56.22 4.48 7,882,800
Iberafrica Diesel 53.83 0.03 657,780 iberafrica Dicsel-A4ditiopal Plairt 52.75 -0.17 2,196,770
ThikaPowerDieselPiant 57.71 -1.37 1.672,600
Thiks Power Diesel Plant (with steam unIt) 57.71 -1.37 0
Gulf Power 57.73 -0.19 887,516
Triumpb Power 60.42 -0.2 686,900
Triumph Power 60.42 -0.2 0
OlkariaIVSteamChssge __________________ 2.01 -0.01 94,231,645
Olkaria I Unit IV and V SteasnChage 2.01 -0.01 88,620,626
Ue*cl lmpca't(Neaconsmercial) - 12.4 0.65 4,698,986
Uetcl import (Commercial) 17.75 0.67 3,490,304
Uetcl Export(NonC-ommercial) 12.4 0.65 -3,349,145
Uetcl Export (CommercIal) 11.51 0.55 0
Lodwar Diesel (Thermal) 137.01 5.84 899,151
Mandera Diesel (Thermal) 142,96 2.18 908,562
Marsabit Diesel (Thermal) 13166 1.17 504,439
Wajir Diesel 135.99 5.84 933,667
Moyale Diesel (Thermal) 137.15 0.92 270,626
Mciii (Thermal) 142.33 0 36,541
Ilabaiwein (Thermal) 12695 1.37 120,007
EIwak (Thermal) 139.81 3.17 83,522
Baragoi 129.6 -1.52 35,388
Mfsngano(rhermal) 16932 9.01 37,748
Loklohogio 140.83 9.14 123,150
Takabs (Thermal) 135.6 3.99 49,010
Was 127.66 0.78 26,651
RhamÜ 135.88 4.39 52,156
______________________________ 117.93 5 20,546
North }jorr 133.93 0 8,711
Lokori 165.53 0 13,366
Diadab 120.78 0.06 94,509
FaraI,1and .i$6.96 -- -2,03 49,472
__________________________________ 139.71 0 6771
Kiunga 133,62 8.29 10,398
Kakuma 138.39 2.58 75,970
Banisa 142.51 142.51 13
Total units generated and purchaserl (G) excluding exports in July, 2018 = 951,852,359kWh
ROBERT PAVEL OIMEKE, MR/4167093
Director-General.
GAZETrE NoTIcE NO. 8158
THE ENERGY REGULATORY COMMiSSION
SCHEDULE OF TARIFFS 2018 FOR ELECTRiCITY TARIFFS, CHARGES, PRICES AND RATES
FOREIGN EXCHANGE FLUCTUATION ADJUSTMENT
PURSUANT to clause 2 of Part Ill of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a fbreign exchange fluctuation adjustment of plus 5 Kenya cents per KWh for all meter readings to be taken in
August, 2018.
bifbmiation used to calculate the adjustment:
I
I KenGen (Z) Imcm LJPPS (IPPZ) I Total (ZF+ZFI+IPPZ)
1ExchseeGniWfLoss 25,086.971.75 5,940,86V.37) I a5,355,694 3,790,407.80 - -
Total units generated and purchased (0) Excluding exports in July, 2018 951,852,359kWh
ROBERT PAVEL OLMEKE, M114167093
Director-General.
GAZE'rrENoncENo. 8159
THE ENERGY REGULATORY COMMISSION
SCHEDULE OF TARIFFS 2018 FOR ELECTRICITY TARIFFS, PRICES, CHARGES AND RATES
WATER RESOURCE MANAGEMENT AUTHORITY LEVY
PURSUANTtoclause5ofPsztUlof the Schedule of Tariffs 2018,noticeisgiven thatall pricesfor electricalenergyspecifiedinPartil -
(A) ol'the said Sebedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 259 Kenya cents per kWh for all meter readigstobe taken in August, 2018.
Information used to calculate the WRMA Levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Units purchased in July, 2018
Hydropower Plant (Kwh.)
Gitaru 113,062,000
Kamburu 36,785,000
Kiambere 107,843,000
Kindarum a 26,021,460
Masinga 23,751,000
Tana 12,568,052
Wanjii 1,304,382
Sagana 861,631
Ndula 0
Turkwel 33,956,350
Gogo 486,758
Sondu Miriu
Sangoro 15,441,460
Regen-Terem 3,190,188
Chania 63,920
Gu m 0
Total units purchased from hydropower plants with capacity equal to or above 1MW 419,861,201 kWh
Total units generated and purchased including hydros excluding exports in July, 2018 = 951,852,359 kWh
ROBERT PAVEL OIMEKE, MRJ4167093
Director-GeneraL
GAZETFE NOTICE No.8160
THE ENERGY REGULATORY COMMISSION
SCHEDULE OF TARIFFS 2018 FOR ELECTRICITY TARIFFS, CHARGES, PRICES AND RATES
INFLATION ADJUSTMENT
PURSUANT to clause 3 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to an inflation adjustment of plus 5 cents per kWh for all meter readings taken in August 2018.
Information used to calculate the adjustment:
INFAKenGen JNFAKPLC INFAIPPs Last Half-year Period
Inflation Costs Under/(over) Total
Recovery
Escalated Cost 136,019,810.00 307,058.041.95 115,553,854.62 23,518.558.21 582,150,264.78
Total projected units generated or purchased by the Company in August-December 2018- (Gp) = 4,581,346,788 kWh
ROBERT PAVEL OLMEKE, MRJ4 167093 Director-General.
Dated the 10th August, 2018.
E. O. ABUNDU,
11865 Land Registrar, Rachuonyn Northl&rsg/Sowth Distress.
Extracted Entities (6)
case_number
36 of 2013
previous_gazette_ref
8156
person
John Otieno Nyamaga
Joseph Oyoo Nyamaga
Gabcicl Ongondo Chiko
Joshua Patrick Odhiambo
Details
- Act / Legislation
- THE LAND REGISTRATION ACT
- Signed By
- E. O. ABUNDU
- Title
- 11865 Land Registrar, Rachuonyn Northl&rsg/Sowth Distress
- Date Signed
- 10th August 2018
- Page
- 36
- Extraction Method
- regex
Source Gazette
Vol. CXX No. 95
Published 5th February 2018