Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via regex

GAZETTE NOTICE NO. 2551

GAZETTE NOTICE NO. 2551

COMPANIES ACT

(Cap. 486)

COMPLETION OF DEVELOPMENT PLAN


PURSUANT to section 991 (3) of the Companies Act, it is notified for general information that the undermentioned company is dissolved. Number Name of Company F. 100/2006 Chemtura (PTY) Limited CF/201 1/52792 Inmobi PTE. Limited Dated the 26th February, 2018. ALICE MWENDWA, for Registrar of Companies. GAZETITE NOTICE NO. 2552 THE CROPS ACT (No. 16of2013) PROPOSED GRANT OF L10ENCES NOTICE is given that pursuant to section 20 (6), (7) and (8) of the Crops Act, the Agriculture and Food Authority proposes to grant licences to the following applicants. 08 THE KENYA GAZETFE 16th March, 2018 Name of Applicant Purpose of Licence Location Mbachi Processors Processing and Nairobi Limited export of Macadamia Nuts lCD; Mombasa Road, Nairobi Utility Group Limited, Processing and Nairobi Crossroads Plaza, export of Macadami Westlands Road, Nuts Nairobi Any objections to the proposed grant of licence with respect to the applicants, shouli be lodged in writing with the Agriculture and Food Authority, Nuts and Oil Crops Directorate, NSSF Building, 6th Floor, Nkurumah Road, P. 0. Box 84351-80100, Mombasa within fourteen days (14) from the date of this notice. The objection should state clearly the name, address and telephone Number of the person/s or entity objecting, the reasons for the objection to the grant of the licence and should be signed by the objector. The Agriculture and Food Authority proposes to issue the licence to the applicants who will have complied with the Crops Act of 2013, thn Kenya Coconut Development Authority Order (UN No. 165) and any other relevant written law on 23rd April, 2018. Dated the 15th March, 2018. ALFRED BUSOLO TABU, Interim Director-General, MR/4 143323 Agriculture and Food Authority. GAZETrE NOTICE NO. 2553 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF DEVELOPMENT PLAN PDP No. ELD/1 712016102—Proposed Site for Residential Plot in Eldoret Town NOTICE is given that the above-mentioned development plan was on 22nd February, 2016, completed. The development plan relates to land situated in Elgon View behind Hill School, Eldoret Town, Kesses Sub-county within Uasin Gishu County. Copies of the development plan have been deposited for public inspection at the office of the County Physical Planning Officer, Ardhi House, Eldoret and Deputy Commissioner's Office, Kesses. The copies so deposited are available for inspection free of charge by all persons interested at the office of the County Physical Planning Officer, Ardhi House, Eldoret and Deputy Commissioner's Office, Kesses, between the hours of 8.00 a.m. to 5.00 p.m., during working days. Any interested person who wishes to make any representation in connection with or objection to the above-named development plan may send such representations or objections in writing to be received by the County Physical Planning Officer, do P.O. Box 1464-30100, Eldoret, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 22nd February, 2018. GERTRUDE K. RAPONG'O, MRJ4 187346 for Director of Physical Planning. The part development plan relates to land situated within Ongata Rongai Township. Copies of the part development plan have been deposited for public inspection at the office of the County Executive Member for Lands, Physical Planning and Urban Development and the office of the County Physical Planning Officer, Kajiado. The copies so deposited are available for inspection free of charge by all persons interested at the office of the County Executive Member for Lands, Physical Planning and Urban Development and the office of the County Physical Planning Officer, Kajiado, between the hours of 8.00 a.m. to 5.00 p.m., Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 11- 01100, Kajiado, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 6th February, 2018. ISAAC K. PARASHINA, MR/4 187 188 for Director of Physical Planning. GAZErFE NoTIcE NO. 2555 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLANS PDP Nos. Title of Development Plan Centre/Town 326/2018/06 Existing Site for Farm Garissa 326/2018/07 Existing Site for Residential Development Garissa 326/2018/08 ______________ Existing Site for Commercial Development Garissa 158/2018/01 I Existing Site for Offices I Dadaab NOTICE is given that preparation of the above part development plans was completed. The part development plans relate to land situated within Garissa and Dadaab towns. Copies of the part development plans as prepared have been deposited for public inspection at the offices of the County Physical Planning Officer, Garissa, County Government of Garissa offices and the Garissa Sub-county offices. The copies so deposited are available for inspection free of charge by all persons interested at the offices of the County Physical Planning Officer, Garissa, County Government of Garissa offices and the Garissa Sub-county offices, between the hours of 8.00 am. to 5.00 p.m., during working days. Any interested person who wishes to make any representation in connection with or objection to the above development plans may send such representations or objections in writing to be received by the County Physical Planning Officer, Garissa, P.O. Box 563-70100, Garissa, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 22nd February, 2018. ALPHONCE K. A. ROTICH, MR14 187293 for Director of Physical Planning. GAZETFE NOTICE NO. 2556 GAZErFE NOTICE NO. 2554 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLAN PDP No. KAJ15271201811—Existing Residential Plot No. B285, Ongata Rongai Township. NOTICE is given that the above-mentioned part development plan was on 6th February, 2018, completed. THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No.8of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED VOl VILLAGE COMPLEX ON L.R. No. VOL MUNICIPALiTY BLOCK 1/1658, 1/595 AND 1/576 AT VINDO AREA IN VOl OF TAITA TAVETA COUNTY 16th March, 2018 THE KENYA GAZEfl'E 809 INVITM1ON OF PUBLiC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Voi Village Company Limited, is proposing to construct Voi Village Complex (VVC) which will be a modem multi- purpose commercial and residency luxury complex. The proposed project shall be located on L.R. No's. Voi Municipality Block 1/1658, 1/595 and 11516 in Vindo area at Voi in Taita-Taveta County. The parcels of land lie adjacent to each other and add up to a total of 11.12 Ha (27.48 acres). The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Air quality • Continuous sprinkling of water on the degradation access road especially during dry seasons. • Drivers to be cautioned against over speeding. • Switch off engines when not in use. • Haulage trucks most be covered with tarpaulin or the aggregates sprayed with water before loading the haulage trucks. • Regular maintenance of construction equipment to minimize exhaust emissions. • Staff working in dust generating activities to be provided with PPE such as dust masks / respirators and the use of PPE be enforced. • Screenlcordon off the site to minimize dust migration by wind. Strict adherence to Air Quality kegUlat1ons 2014. • Limit the times of construction to daylight hours (8 a.m-5 p.m.). • Erect signage to prohibit unnecessary hooting. • Ensure that noise and excessive vibration from construction activities are within permissible levels as per the provision of the EMCA (Noise and Excessive Vibration P.O.11ution) (Control) Regulations, 2009. • Provision of hearing protection gears to workers exposed to noise levels above 85 dB(A). • Regular servicing of machinery and vehicles to reduce friction on the moving pans. • Adherence to Noise and Excessive Vibration P.O.liution (Control) Regulations. 2009. • Practice rain water harvesting with sufficient water reservoirs. Sensitize workers to use water sparingly. • Encouragement of water re-use/recycling during both construction and occupation phases of the project. • Proper treatment of waste water via the WWTP so that it is reused for non-potable uses such as watering gardens, flushing and cleaning. • Regular audits of water systems. Impacts Proposed Mitigation Measures • Internal monitoring of water consumption through water meters to enable proper performance review and management. • Install aerated taps on sinks and hand- wash areas to save on amount of water utilized. Oil leaks/spills from • All machinery must be keenly observed machineries and and maintained to prevent oil leaks. storage area • Maintenance must be earned out in a designated area (impermeable service bays) and where oils are completely restrained from reaching the ground. • All oil products and materials like containers should be stored in site stores or in the contractor's yard and handled appropriately to avoid spills and leaks. • In case of an oil spill, oil absorbent materials should be used to clean up the spill then put in disposal bags to be collected and managed as hazardous waste by a NEMA licensed hazardous waste handler. Increased energy • Design of the buildings should allow demand adLqiiate ventilation and lighting during we day. • Switch off electrical appliances when not in use. • Use of energy conserving electric bulbs for general lighting. • The solar power plant will supplement energy from KPLC. • Carry out energy audits every three (3) years after commencement of operations. Increased surface • Provision of soil conservation structures water runoffs and like planting ground cover vegetation soil erosion (grass) on erosion prone areas to control occurrence of soil movement. • Provide specific access routes so that trucks does not loosen soil all over the site. • Control construction activities especialiy during rainy seasons to reduce loosening topsoil. • Avoid unnecessary soil excavations on the' site to prevent loosening soil and exposure to eroding agents like water and wind. • Landscape open areas after completion of the • Monitor the natural flow system during heavy rains and make improvements where necessary. Solid waste • Excavation waste should be re-used or management backfllled. • Adopt the 3R Waste Management Approach, that is; Reduce, Reuse and Recycle whereby waste shall be segregated - plastics, glass, tins, papers, wood, metals etc. (later to be re-used or recycled). • Contract a NEMA licensed waste handler to collect construction waste. • All waste holding containers to be labelled/ color-coded depending on waste category. —4 —( Excessive noise and vibrations I Increased water demand Impacts Proposed Mitigation Measures • After construction, Contractor must clear the site of all debris and restore it to a state acceptable to the supervising architect and environmental consultant. • Strict adherence to Waste Management Regulations, 2006. Waste water • During construction, the contractor shall management provide temporary sanitary facilities for the workers. • A waste water treatment plant shall be used to treat all waste water from the development during operational phase. • Regular maintenance of the WWTP. • Strict adherence to Water Quality Regulations, 2006. Loss of vegetation Confirm sites and locations in order to cover avoid unnecessary clearing of vegetation. • Landscape open areas after completion of the project. Disruption of utility In case of construction works that will services affect the existing power lines, inform the local community earlier through KPLC giving clear timelines so that locals are able to adjust their activities during that period. High demand for • Switch off electrical appliances and lights electricity when not in use. • Install occupational sensing lights at various locations such as storage areas which are not in use all the time. • Install energy saving fluorescent tubes. • Monitor energy use during the operation of the project and set targets for efficient use. • Sensitize housing units occupants to use energy efficiently. Risks of electrocution • Maintain a minimum of 30-metre right- from existing high of-way at the area around the pylons and voltage transmission the spans between the pylons by erecting line and proposed barriers 30 meters from the pylons. solar power project • Avoid constructing tall structures or planting tall trees under the transmission lines that can touch cables or can interfere with maintenance of the lines. Install warning signs near transmission pylons to warn driven of tisk of electrocution in case they knock them. • Enfoece a speed limit of 5 kin/br within the pylons to ensure drivers are more careful not to knock pylons. • After compleflon and equipping of the solar project, secure the area to control access to power house. Occupational health . Proper fencing of the Site and restricting and safety unauthorized persons' access. • Provide well-stocked first aid kits to be managed by trained first alders. • Nominate an EHS officer to oversee compliance of all construction activities to OSHA 2007 and regulations under it. • Provide appropriate PPE to all site workers: respirators, overalls, safety boots, head gears, hand gloves, ear muffs and googles. Impacts Proposed Mitigation Measures • Use barriers, guards and warning / caution signage as necessary to protect employees and visitors from physical hazards. • Ensure that operational manuals are available and accessible for every equipment /machinery used at the site during construction and operation phases. • Proper maintenance of all machinery and equipment to prevent premature failure or possible accidents. • Only properly trained workmen to operate equipment or machinery. • Display emergency numbers for area police, fire outbreak and medical emergencies. • Provide fire-fighting equipment and mark a fire assembly point. • Conduct statutory trainings under OSHA, 2007 and Rules under it. i.e. basic first aid, fire safety training, and Occupational Safety and Health committee training through approved training institutions by the Directorate of Occupational Safety and Health Services (DOSHS). The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30126- 00100, Nairobi. County Director of Environment, Taita Taveta County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/41 87295 National Environment Management Authority. G..Zgrrtt NOTICE NO. 2557 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No.8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED CONSTRUCTION OF THE MOMBASA NORTHERN BYPASS AND BAMBURI LINK ROADS IN MOMBASA COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Kenya National Highway Authority, is proposing to construct the Mombasa Northern Bypass and Bamburi Link roads in Mombasa County. The Project comprises of two sections amounting to 38 km as follows: Mombasa Northern Bypass (27.1 Km) and Bamburi Link Road (11.5 Km). The Mombasa Northern bypass Section targets to connect the Mombasa-Nairobi (Al09) Highway at Miritini to the 16th March, 2018 THE KENYA GAZETTE 811 Mombasa—Malindi (B8) Road at Kwa Kadzengo, Mtwapa. The Bamburi Link Road is targeted to link the new Moinbasa Northern Bypass Road to the Mombasa—Malindi (B8) Road at Bainburi. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Loss of biodiversity • Mapping of genetic resources will be required for re-introduction elsewhere. • All top soil from Kaya sites will be recovered and re-deposited at designated undisturbed sites where the gene bank can be preserved and recovered through natural germination. • A reforestation plan will be implemented to replace over 40,000 trees to be displaced by the road and settlements. • The clearance of the site for construction purposes shall be kept to a minimum. Use of un-vegetated or distuibed areas for the contractor's Camp, stockpiling of materials etc. shall be encouraged. Soil pollution Practice sound road engineering by maintaining good drainage and natural water flows. However, the drainage ditches should only be constructed where necessary. • To minimize potential soil erosion the contractor should consider planting appropriate grass on back slopes, side slopes and other sites prone to erosion. • Develop an erosion control and revegetation plan that stipulates measures to minimize soil loss and reduce sedimentation to protect water quality especially for sections that will interact with water resources. • Design run off control features especially on the roadside drainages channels to minimize soil erosion. • Limit cleared areas to protect footprint to avoid unnecessary exposure of soil to agents of erosion. • Line side- drains with concrete or by stone pitching in erosion prone soil to avoid gully formation. Water resources • Uncontrolled water discharges should not be channeled into water sources. • Camp sites, waste disposal and soil dumping areas should be located at least 20m from the highest water level of any surface water body. • Grey water should be channeled to a soak pit to prevent mixing with run off that would eventually find their way to nearby water sources. • The contractor should ensure that concrete wing walls, gabions, riprap or other suitable control are established at or near bridge structures. • Water permit for the abstraction of water shall be obtained from WARMA to ensure that existing water rights and uses will not be affected by the road project for its diverse water needs. Impacts Proposed Mitigation Measures Solid waste • The contractor should develop a comprehensive waste management plan • Provision for responsible management of any hazardous waste generated during the Construction works. • Adherence to Waste Management Regulations of 2006. Liquid waste and • Water containing such pollutants such as effluent cements, concrete, lime, chemicals and fuels shall be discharged into a conservancy tank for collection to avoid ground water contamination. • The contractor shall also prevent runoff loaded with sediment and other suspended materials from the site/working areas from discharging to adjacent watercourses andlor water bodies. • Wash areas shall be placed and constructed in such a manner so as to ensure that the surrounding areas (including groundwater) are not polluted. Noise and vibration . Exploit quarries that are located in isolated areas away from settlement or human made structures. Employ careful blasting methods and warn nearest residents of your intention to blast one week to schedule blasting. • Carefully select batching plant locations that are at least 200m away from any sensitive institution or settlements. • Hoard the batching plant area at least 5m tall buffer barrier that will limit noise transmission from the site. • Restrict working hours to daytime when ambient noise levels are generally high and avoiding working at night. • Inform potentially affected people or institution located within 200m of a potentially noisy activity at least one week in advance. • Adherence to Noise and Excessive Vibration Pollution (Control) Regulations, 2009. Air quality • Restrict excavation to the project foot-print to minimize surface exposed to wind erosion. • Manage stockpiles by covering those that are not of immediate use. • Carefully control works close to the listed sensitive receptors such that minimal dust is generated and whenever earthworks are being undertaken, then dust suppression should be implemented continuously. • Ensure contractor's staff working at high dust generating site are provided with appropriate PPEs to include dust masks and/ or suitable aspirators. • The contractor should inform the management of sensitive institutions on the day that excess dust is likely to be generated so they can be prepared. The same applies to workers along urban centres • Adherence to Air Quality Regulations, 2014. • Consultation with the Water Resource Users I Association (WRUA) should be done prior Material sites and • All access routes to material sites should be borrow pits planned ahead of construction to abstraction to gain their support. . Impacts Public health and HI V/AIDS Proposed Mitigation Measures • Develop a rehabilitation/ reinstatement plan for borrow pits. • Haulage routes should be maintained by watering to minimize the impact of dust • Contracts with the land owners should be signed before excavation begins which include terms and conditions for payment, the area of land to be excavated, the rehabilitation measures to be carried out on the gravel sites, if required. • The contract documents should instruct the contractor to construct and maintain fences and rehabilitate after use. • Material site areas must be excavated should be cordoned off. • Gravel pits must be landscaped then reinstated or backfilled with overburden if the depth of the overburden is sufficient to allow for this. • Ensure separate stockpiles for overburden and gravel. • Landowners should be informed of the environmental implications of the excavation works at the time of identification of the gravel pits. • Initiate an awareness creation, prevention and training programme on HI V/AIDS upon commencement of works. APARTMENTS ON PLOT L.R. No. 209/14070 IN NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, United Africa Construction Limited, is proposing to construct residential apartments on Plot L.R. No. 209/14070 situated along Kodi road 2 which connects Mombasa Road and borders southern By pass. The development comprises three blocks of 15 floors, inclusive of ground floor and lower ground floor. The apartments on the first and second floor will have general facilities. The thirteen typical upper floors will have necessary sanitation facilities. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Hydrology and water • Hazardous substance control and supply quality emergency response plan that will include degradation preparation for quick and safe clean-up of accidental spill. • Hazard pus-materials handling procedures to reduce the potentials for spill during construction. • Identify areas where refueling and vehicle maintenance activities and storage of hazardous materials, if any, shall be permitted. • Establish weilness centre including VCT and ARV centres at strategic location of the project corridor. • Incorporate HIV/AIDS control program as part of the construction deliverables. Resettlement and • A resettlement action plan has been compensation separately undertaken and reported in a separate volume. Occupational health . Comply with the provisions of OSHA 2007. and Safety The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 678394)0200, Nairobi. Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30126- 00100, Nairobi. County Director of Environment, Moinbasa County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/4 187114 National Environment Management Authority.

Dated the 26th February, 2018.

ALICE MWENDWA,

for Registrar of Companies.

Extracted Entities (1)

previous_gazette_ref

2551

Details

Act / Legislation
COMPANIES ACT
Reference
Cap. 486
Section
section 991 (3)
Signed By
ALICE MWENDWA
Title
for Registrar of Companies
Date Signed
26th February 2018
Page
51
Extraction Method
regex