GAZETTE NOTICE NO. 9008
GAZETTE NOTICE NO. 9008
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Ja Recycling Limited, is proposing to install a plastic and tyre pyrolysis plant in an open shade adjacent to Kang’oki dumpsite in Thika. The project design and technology is a world class, eco-friendly and cost-effective waste pyrolysis plant. The waste pyrolysis equipment has been designed to have a lower cost and higher fuel oil output. The machine combines continuous and batch type pyrolysis plant. The continuous pyrolysis machine is to feed the raw materials, such as tyre and plastic, on one side and discharge the carbon black continuously from the other side. However, the batch
15th September, 2017 THE KENYA GAZETTE type is to feed the machine with a batch of raw material and take the process and start the next process after cooling down the machine and discharging the carbon black. The proposed plant is based on the green technology (pyrolysis) to achieving the environmentally friendly process, which is the excellent waste tyre management solution for tyre recycling.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Vegetation cover • Introduction of vegetation (trees, shrubs and grass) on open spaces within and around the site. Indigenous species would be preferred.
Waste management • Disposal of waste shall be done in accordance to waste regulations.
• Contractor to undertake safe waste disposal.
• Verify legality of waste disposal destination.
• Adherence to Waste Management
Regulations of 2006.
Air quality • Dry materials shall be kept dump or covered at all time.
• Install gadgets to intercept the particulate matter as well as controlling gaseous emissions.
• Strict adherence to Air quality
Regulations, 2014.
Environmental pollution • Ensure contractor undertaking on environmental considerations.
• Monitor trends on health and safety of construction workers and neighborhood.
• Contractor to maintain material balance records at all times.
• Equipment specifications to conform with environmental standards.
• Integrate environmental components in the site design (waste management, emission controls, etc.).
• Apply to the extent possible provisions of the waste management regulations, Thika Municipal Council by-laws, Public Health Standards, etc.
• Enhance in-house awareness and sensitization on environmental protection initiatives.
Noise levels • Initiate a noise mapping programme and keep monitoring.
• Undertake a annual hearing survey of all the workers.
• Train, provide ear muffs/corks and enforce application.
• Adherence to Noise And Excessive
Vibration Pollution (Control)
Regulations, 2009.
Social aspects • Draw of-site contracts to enhance socially acceptable procedures.
• Involve more independent interested parties (waste collectors) in establishing options for waste recycling.
Occupational health and safety
• Constitute health and safety committee, • Maintain safety reticulation (e.g. fire detection and fighting equipment).
• Train on HS issues and provide PPEs and enforce applications.
• Install all machines and equipment with protective guard rails at the moving parts.
• Comply with the provisions of OSHA
2007.
The full report of the proposed project is available for inspection during working hours at:
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126–
00100, Nairobi.
(c) County Director of Environment, Kiambu County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR/3534895 National Environment Management Authority.
Dated the 15th September, 2017.
GEOFFREY WAHUNGU,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
9008
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- GEOFFREY WAHUNGU
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 15th September 2017
- Page
- 38
- Extraction Method
- regex
Source Gazette
Vol. CXIX No. 136
Published 9th March 2017