Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 4034

GAZETTE NOTICE NO. 4034

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Kenya Ports Authority is proposing to relocate the Kipevu Oil Terminal (KOT) at Mombasa Port in Mombasa County. The project will involve construction of an offshore jetty near Dongo Kundu. The proposed offloading facility will have both subsea and land based pipelines connecting it to the storage facilities in Kipevu.The project will comprise of the island terminal with four berths, located slightly inlands capable of importation and exportation of five different hydrocarbon products; crude oil, heavy fuel oil and three types of white oil products (DPK — aviation fuel, AGO — diesel and PMS — petrol); Top side (initial implementation of topside will be for three berths but layout will recognize the need for implementation of the fourth berths at a later date); subsea pipeline (the subsea pipeline corridor and associated number of pipelines will have an element of pre-investment to accommodate all four berths); On-shore pipeline to a designated tie-in location; SCADA and control system. The subsea pipeline is 1.15 km long while the on shore pipeline is 1.05 km long. The following are the anticipated impacts and proposed mitigation measures: Impacts Mitigation Measures Vegetation damage, • Carry out evaluation of plant species habitat loss and and recommend appropriate methods of invasion by exotic handling clearing process. species • Utilize appropriate clearing techniques (e.g. hand clearing as opposed to mechanized clearing) by using human labor as opposed to heavy machinery. •Maintain native ground cover by selective removal of trees which cannot be incorporated in the project design. •Minimizing .clearing and disruption to riparian vegetation. Disturbance to marine • Evaluate marine species and recommend species and water appropriate dredging methods with pollution minimum impact. •Use appropriate equipment and dredging methods that do not adversely affect marine species. •Provide appropriate measures to avoid release of contaminants into the water. •Carrying out monitoring by a implementing a once a week measurement of Total Suspended Solids (TSS), TPH, BTEX and PAH at 3 points for 30 months during dredging and construction. •Likoni Beach. •Mombasa Marine Protected Area. •Mwangala-Mwache Area. Soil erosion • Soil excavation to prepare land for pipelines should be used for backfilling and excess disposed away from site. •Soils shall not be left exposed to wind/water. •Riverine vegetation shall be minimally disturbed during the construction to reduce soil erosion and enhance riverbank protection by re-vegetation on steep areas. Air pollution • Control speed of construction vehicles and prohibit idling. •Water shall be sprayed during the construction phase on excavated areas to reduce dust emission. •Regular maintenance of vehicle and equipment. •Use of dust masks while working- in dusty/smoky areas. •Use serviceable vehicles/machines to avoid excess smoke. Carry out air monitoring through Air Sampling and Analysis forPM10, NOx, SOx and Hydrocarbon once a week for 30 months during construction period. Noise pollution • Noise reduction/ hearing protection devices when working with noisy equipment. •Use serviceable equipment with low noise emission. •Instruct truck/machine operators to avoid raving of engines. •Carry out noise measurements once a week for 30 months during construction. Generation of solid waste • Provide solid waste collection facility (disposal container) for the temporary storage of waste prior to disposal at an appropriate and designated location. •The storage yards should be provided with solid waste disposal facilities such as waste bins/chutes. •KPA EHS Office to sensitize contractor staff on waste management. •Contractor to appoint an officer to be in- charge of waste management at the site during construction. •Liaise with local authority on suitable dumping site for waste. •Excavation activities to be done preferably during the dry season to avoid soil erosion and siltation of steams. •Use of the soil to backfill. Risk of fire • Monitor the handling of flammable products. •Observance of safety requirements on use of naked flame. Site area soil (land slide) • No waste is disposed of at the project and water pollution area. •Contaminents are provided for use during construction. •Carry out weekly monitoring by implementing soil and water analysis for TSS, TPH, PAH and BTEX. Injury to workers • Appropriate head, hand and foot protection (PPE) during the manual clearing of vegetation and construction. •Hard hats, safety boots, protective goggles, rigor gloves, •Nose masks, working overalls and first aid kit. •Adopting ergonomic work flow designs that fit physical tasks to employees while maintaining a balance with productivity. •Provision of first aid kits at construction site. •Induction of construction staff on administration of first aid. •Sensitization of construction staff on appropriate use of PPE. Reduced fish catch at the • Dredging should be conducted during project area BMUs high tide to allow some turbid water to activities be mixed by the movements of the tidal waters. •Active dredging should be done in the months that local fisher folks express low catch landings at BMUs. These are the months of October, November, December, January and February_ •Disposal of dredged materials should be restricted offshore at a site where the tidal currents will not bring sediments to the shore. •Disposal of dredged materials should not be dropped at the surface since this will cause long distance dispersal of sediment from the disposal site. •Provide for fishery activity disturbance/disruption during construction for a period of 30 months to the following 3 Beach. •Management Units (BMU's) located within the project area: •Mkupe. •Likoni. •Port Reitz. Health issues of the Sensitize workers on use of mosquito workers nets and appropriate gear when working in waterlogged areas to avoid Bilharzia. Sensitize workers on communicable diseases like sexually transmitted diseases and emphasize on use of condoms. Surface run off and • Ensure that excavated soil is not sedimentation exposed to wind/rainwater. •Compact excavated soil to avoid erosion. •Install sediment traps to control runoff and sedimentation. •Use ample culverts. Accidental fall and injury • Contractor to provide induction to arising working at personnel working at height and safety heights issues. •Use construction site barrier tapes to isolate the site(working)area to bar intruders from accessing the area in case of a dropping object. •Test structures for integrity prior to undertaking work. •Implement a fall protection program that includes training in climbing techniques and use of fall protection measures. •Provide harnesses for use when working at heights. •Inspection, maintenance, and replacement of fall protection equipment. •Use of helmets and other protective gear will mitigate against scratches, bruises; lacerations and head injuries due to dropping objects. •Provide first aid facilities at the site. The full report of the proposed project is available for inspection during working hours at: (a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b)Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30126- 00100, Nairobi. (c)County Director of Environment, Mombasa County. The National Environment Management Authority invites "members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of this project. GEOFFREY WAHUNGU, Director-General, MR/3134997 National Environment Management Authority. GAZE! IE. NOTICE No. 4035 ROBY AUTO GARAGE DISPOSAL OF UNCOLLECTED GOODS TAKE NOTICE that Robert Muthee Murage, of P.O. Box 103100-00100, Nairobi, in exercise of powers of under section 7 (i) of the Disposal of Uncollected Goods Act, notifies the owner of motor vehicle reg. No. KAZ 006A, that on or after expiry of thirty (30) days from the date of his notice, will sell the said motor vehicle, currently stored at his residence at plot L.R. No. Ngong/Ngong/58861, situated off Magadi Road, along Muringai Lane, Nkoroi Estate, Ngong Division in Kajiado County. On 8th July, 2014 and 27th March, 2015 notice was given to the owner, to pay and to collect the said motor vehicle but the owner neglected or refused to pay and collect the said motor vehicle. By the notice dated 27th March, 2015 a total sum of Kenya shillings ninety six thousand two hundred (KSh. 96,200) was outstanding. At the date of this, you owe me a total of sum of Kenya shillings one hundred and sixty-five thousand eight hundred only (KSh. 165,800) being storage charges from 14th November, 2013 up to 9th March 2016. Dated the 12th April, 2017. ROBERT MUTHEE MURAGE, MR/3134727 for Roby Auto Garage. 28th April, 2017 THE KENYA GAZETTE 2001

Dated the 12th April, 2017.

ROBERT MUTHEE MURAGE,

for Roby Auto Garage.

Extracted Entities (1)

previous_gazette_ref

4034

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Section
section 7 (i)
Signed By
ROBERT MUTHEE MURAGE
Title
for Roby Auto Garage
Date Signed
12th April 2017
Page
37
Extraction Method
regex