GAZETTE NOTICE NO. 5272
GAZETTE NOTICE NO. 5272
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
RESTORATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Four Forty Utawala Development Limited, is proposing to construct a Residential Apartments Scheme- 440 on L.R.
No. 6845/167 at Utawala in Nairobi City County. The project shall be developed on nine acre piece of land in Utawala. The project shall consist of twenty two (22) blocks of apartments; each will have 5 floors and 20 units of houses within the apartment and 42 parking spaces between two apartments. There will be a total of 160 two bedroom units and 280 three bedroom units. The project shall also include commercial centre with 24 shop.s at the main entrance;
recreational facilities which will include swimming pool with changing rooms and other facilities; a basketball court and green space to provide multipurpose recreational space.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Habitat and vegetation Minimize area of clearance.
disturbance
• Reintroduce the vegetation that coexist with the site.
Land degradation/soil • Silt fence should be established where erosion erosion is predetermined.
Introduce vegetation in already mined areas.
* Introduce physical barriers such as rocks to intercept soil material from being carried away by the run-off.
Air pollution • Constant sprinkling of water to the bare areas.
Identify wind direction during operation to avoid exposure to emission.
Minimize the generation of bad emission from trucks used by assessing and evaluating whether they contain toxic by products.
All the workers should be provided with masks to avoid inhaling such gases.
• Adherence to Air Quality Regulations, 2014.
Noise and resulting The operation should only be done vibrations during the day time.
• Planning the trips of the vehicles can reduce such impacts.
• Screening using baffle molds material e.g. soil and wastes that has already been remove to access the rock.
• Locate screening baffle molds on site boundary to reduce noise.
• The workers to be provided with earmuffs during operation hours.
• Correct stemming will aid the control of ground vibration.
• Adherence to Noise and Excessive
Vibration Pollution (Control)
Regulations, 2009.
Solid and effluent wastes • Soil and earth excavated wastes to be
(oil and other spills) used for backfilling excavated pits
Surface run-off from waste tips should be captured and treated to remove suspended solids prior to discharge.
• Safe disposal of oil spills and filters from machineries.
• Adherence to Waste Management
Regulations, 2006.
Water pollution • Harmonize and design drainage ditches with the natural drainage to avoid affecting nearby land.
• Divert run-off around working area.
• Install sedimentation traps or screen next to the silt fence by arranging a layer of stone chips and gravel to trap any loose soil to nearby water bodies
• Adherence to Water Quality
Regulations, 2006.
Land restoration and • Filling in the depressions to prevent landscaping ponding.
• Landscaping and replanting of trees and other similar vegetation.
• All pits where water may collect to form ponds should be filled.
• A layer of top soil should be introduced so as to achieve vegetation growth.
Change on land /loss of • Rehabilitation.
land
Occupational health and • Isolate the working site for rest of the safety community for their safety.
• All depressions should be filled and replanted.
• All moving parts of machine should be covered with suitable guards.
• Keep accidents and incidents records.
• Provide, and enforce use of personal protective equipment and trained on occupational health.
• Fire-fighting equipment and First aid kits should also be provided at the site.
• Comply with the provisions of OSHA
2007.
The full report of the proposed project is available for inspection during working hours at:
Director-General. NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126-
00100, Nairobi.
County Director of Environment, Nairobi City County
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of this project.
GEOFFREY WAFIUNGU, Director-General, MR/3403058 National Environment Management Authority.
Dated the 2nd June, 2017.
GEOFFREY WAFIUNGU,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
5272
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Signed By
- GEOFFREY WAFIUNGU
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 2nd June 2017
- Page
- 25
- Extraction Method
- regex
Source Gazette
Vol. CXIX No. 71
Published 15th February 2017