Back
REGULATION 58% confidence via regex

GAZETTE NOTICE NO. 6987

GAZETTE NOTICE NO. 6987

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Gerick Kenya Ltd. is, proposing to construct a Filling Station on plot No. West Mugirango/Siamani/5818, Konate in Nyamira County. The components of the project includes: a forecourt paving, a U-shaped drainage tunnel, underground fuel tanks (5m3 diesel tank, 5m3 kerosene, 5m3 super petrol), station manager office, station sales office, a store, sanitary facilities, 4 digital fuel pumps, a septic tank, steel canopy, a compressor and generator section. The following are the anticipated impacts and proposed mitigation measures: Impact Mitigation Increased noise and • Barricading the area (erecting a vibration levels boundary wall. •Construction activities to be conducted during the day. •Provision of appropriate Personal Protective equipment to protect workers from occupational noise. •Regulat maintenance of plants and equipment. •Shutting down of engine vehicles when not in use to reduce on noise levels. •Conducting of noise measurements from different positions within and outside the workplace to establish prevailing noise levels and recommending appropriate. mitigation measures. Increased air pollution as • Use of dump method to mitigate on dust a result of dust particles by sprinkling water on areas to be emanating from earth excavated. works and construction

Extracted Entities (1)

previous_gazette_ref

6987

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Page
37
Extraction Method
regex