Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via regex

GAZETTE NOTICE NO. 4077

GAZETTE NOTICE NO. 4077

THE COMPANIES ACT

(Cap. 486)

COMPLETION OF DEVELOPMENT PLAN


PURSUANTto section 339 (5) of the Companies Act, it is notified for general information that the undermentioned companies are dissolved. Number Name of Company CPR/2012/90454 Artisan Electrical and Hardware Limited C.98770 Archer Outpost Management Limited CPR/2014/137386 China Inspur Kenya Limited C. 147167 Cross Cut Limited C. 168777 Femwood Business College Kenya Limited CPR/2013/96000 Flyover Limited CPR/2011/54915 Forty Six Parallels Kenya Limited C. 30568 Henkam Limited CPR/2011/55648 Josab East Africa Limited CPR/2013/126252 Kilifi Block Limited CPR/2013/123408 Mara River Lodge Limited CPR/2011/63918 Occasions N Style Limited CPR/2015/174509, Racing Claws Auto Limited CPR/2011/47954 Real People Investments Limited C. 94629 Romat Limited CPR/2009/2427 Sema Leatherworks Limited GAZh I IE NOTICE No. 4080 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLAN PDP No. HMB/162/2016104 for Existing Site for Homa Bay Police Station. NOTICE is given that the above-mentioned development plan was on 30th May, 2016 completed. The development plan relates to land situated within Homa Bay Town and belongs to the Kenya Police Service. Copies of the part development plan have been deposited for public inspection at the offices of the County Physical Planning Officer, Public Works Building, Homa Bay. The copies so deposited are available for inspection free of charge by all persons at the at the offices of the County Physical Planning Officer, Public Works Building, Homa Bay, between the hours of 8.00 a.m. to 5.00 p.m. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 529, Homa Bay, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 30th May, 2016. GEORGE 0. ONDITI, MR/9383034 Ag. County Director of Physical Planning, Homa Bay County. GAZh I I h NOTICE No. 4081 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLAN PDP No. MKS/56/2016/04—Existing Site for K.R.A. Offices NOTICE is given that the above-mentioned part development plan was on 11th May, 2016, completed. The part development plan relates to land situated within the Sub- County of Machakos. Copies of the part development plan have been deposited for public inspection at the office of the Machakos Sub-County Administrator and County Physical Planning Office, Machakos. The copies so deposited are available for inspection free of charge by all persons interested at the Machakos Sub-County Administrator and County Physical Planning Office, Machakos, between the hours of 8.00 a.m. to 5.00 p.m., Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 333, Machakos, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the llth May, 2016. K. CHEGE, MR/9496931 for Director of Physical Planning. GAZE! I h NOTICE No. 4082 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLAN PDP No. NYA/C112812016/01—Proposed Formalization of Existing Extension of P.C.E.A. Church NOTICE is given that the above-mentioned part development plan was on 20th April, 2016, completed. The part development plan relates to land situated within Gathundia Township: Copies of the part development plan have been deposited for public inspection at the Chief's office, Tumaini Location, County Physical Planning Office, Nyahururu. The copies so deposited are available for inspection free of charge by all persons interested at the Chief's Office, Tumaini Location, County Physical Planning Office, Nyahururu, between the hours of 8.00 a.m. to 5.00 p.m., Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 1135, Nyahururu, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 19th May, 2016. M. W. MURIUKI, MR/9496842 for Director of Physical Planning. GAZE! NOTICE No. 4083 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED HIGH GRAND FALLS MULTI-PURPOSE DAM ALONG THE RIVER TANA IN THARAKA-NITHI COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed. The proponent, Tana and Athi Rivers Development Authority, is proposing to develop a high grand falls multi-purpose dam on River Tana located 50 km downstream of the Kiambere Hydro Power Station along the River Tana in Tharaka-Nithi County. The main objective of the High Grand Falls Project is to provide a large-scale multi-purpose water reservoir catering for public water supply, irrigation, river regulation, flood control and power generation in order to effectively contribute to the regional and national social-economic development. The following are the anticipated impacts and proposed mitigation measures: Project Activities Environmental and Social Issues Management Action Plans Site Preparation Activities — Surveys • Social conflicts. • Notify and sensitize all affected land owners before surveying their land. — Camp site setting • Involve the local administration and other social groups in social moderations. — Material holding site setting 3rd June, 2016 THE KENYA GAZEilt, Project Activities Environmental and Social Issues Management Action Plans Preliminary Construction Activities — Land acquisition and compensation, •Acquisition process of required land for the project construction and buffer zone as well as camp sites. •Negotiating with land owners on compensation of land and development. •Undertake a comprehensive . land acquisition and resettlement action plan (LAP & RAP) as a basis for compensations. •Compensate appropriately any land acquired for the main dam, evacuation power line corridor, access roads and the power house, buffer zones, water treatment plant, sand traps, the pipelines and storage tanks, •Sensitize landowners on necessary land use changes for the protection of the dam. Preliminary Construction Activities — Dam Catchment delineation •Potential social conflicts. •Collaborate with the local leadership to avert social conflict Site clearing — Vegetation removal — Biodiversity loss •Riverine vegetation removal, •Damage to related aquatic biodiversity. - •Confine vegetation removal to the surveyed necessary project area only. •Plan for vegetated buffer zones with suitable indigenous tree species around the dam and along the banks of the rivers. — Access to the river and livestock watering point •Disruption of existing access to the river by the residents. •Blockage of livestock watering and mineral eating locations. •Provide for approved direct access to the river upstream and downstream of the dam. •Allow landowners disposal of trees and other vegetation on their land through controlled commercial charcoal burning and charcoal briquette making. •Removal for offsite disposal all plant matter and organic residual for future water quality safety. Site clearing — Removal of houses, sanitary facilities and cattle pens, — Relocation of graves •Pollution of water from human waste residuals. •Pollution at waste disposal sites. •Cultural aspects of graves relocation, •Future effects to water quality from manure and biomass residuals. •Undertake a controlled and supervised decommissioning of pit latrines (current and abandoned) on the affected settlement locations. •Undertake a procedural relocation of all identifiable graves to locations pre-agreed and identified by each of the relevant families. •Allow the landowners to dispose off manure from cattle pens at market rates. Construction Works and related components — Earth moving •Siltation of river downstream of the dam, •Lubricants and oil spills from construction machinery, •Spoil materials disposal. •Provide barriers or other measures to prevent discharge of silt downstream Tana river. •Any oil spills from machines to be contained for safe disposal. •Construction to stick to the schedule or shorter period Construction Works and related components • — Dam formation •Possible intrusion to the local communities private life by foreign contractors. •Migration into the project area (from within project sub-county and other parts of the country). •Potential social diseases transmissions including HIV and AIDS. •Provide an awareness and sensitization forum for the workers as well as the neighbouring communities, especially on communicable social infections such as HIV/AIDS, TB, etc.. •Sensitize the communities on co-existence with foreign workers. — Health and safety of workers and communities •Safety of the workers and adjacent communities. •Noise and vibrations from construction machinery. •Negative social interactions (cultural interference, immorality, etc.. •Provide workers with appropriate personal protective gear and enforce application of the same at all times while at work. •Provide appropriate sanitation facilities and waste holding bins at the workers camps and other project areas. •Involve local labour to the extent possible on the project construction activities. Construction Works and related components — Machinery, materials and•waste management •Dust emissions and depositions into settlements and cultivated land. •Emissions from construction machinery into the atmosphere. •Waste discharges from construction camp sites. •Material sites management.. •Maintain all construction equipment in good operating conditions to reduce noise and emissions. •Earth moving and excavations be under damp conditions. Dry dusty materials be stored covered. •Material sites are fenced up for the safety of the neighbouring communities. Dam Operations — Sustainability and equity •Wastage of water especially if irrigation is allowed. •Reduced opportunity to other potential dependents of Tana river downstream. •Potential sand harvesting from the dam locations. •Unequal accessibility of water by all around the dam area (limitations in direct access the dam water). •Encourage residents to give priority to domestic and livestock for sustainable utilization of available water. •Irrigation should only be undertaken upon approval by relevant authorities and compliance with water resources management regulations. •Sand harvesting should only be undertaken at the approved sand interceptors upstream. •Provide safe locations for water abstraction and watering livestock for residents. Project Activities Environmental and Social Issues Management Action Plans Dam Operations Safety risks at and downstream the dam •Injuries of the operators and visitors. •Safety risks of a dam break to downstream installations aquatic ecosystems, social and economic features. •Risks of drowning into the dam to children, the aged and livestock. •Potential safety risks from wildlife (hippos, crocodiles and snakes). •Safety Risks Assessment of the cascade system. •Undertake a safety risk assessment of project. and safety audit of the entire cascade system as a whole and develop emergency response strategy. •Maintain a fence around the dam with provision for limited and/or controlled access to the dam water, •Enhance close surveillance for the community, especially those living on risk prone areas. •Sensitize the communities on dam safety issues associated with the dam, particularly in relation to settlements and institutional siting. •Provide safe water access points for the communities. Dam Operations •Social and economic issues, •Downstream dependants, •Water use trends and accountability, •Facility Ownership •Base Environmental flow must always be allowed downstream the dam. •Illegal water abstraction alongside the dam and wastage of water (especially if exposed for irrigation). . Sand harvesting from the dam area and upstream. •Tree harvesting in the buffering zone •Access to biodiversity resources in the area. •Water abstraction for irrigation should be as permitted by ' ERMA. •Sand harvesting to take place from authorized locations only (e.g. sand interception dams on the dam catchment area). •Identify social linkages and collaborations with respect to water use through the CSR policy. •Collaborate with WRMA and Ministry of Agriculture to facilitate easy and safe access to irrigation water by the local communities. Catchments' Management (a)Pollution control, (b)Runoff interception efficiency, (c)Soil erosion control •Effects of changing land use practices, •Enhanced vegetation removal in the Catchment. •Influenced sanitation trends in the neighbouring homesteads. •Encourage immediate landowners to take responsibilities of the dam safety. - •Immediate landowners to be motivated into maintaining buffer zones along the river banks and the dam itself. •Consider participating in the global Tana River Catchment Management and influencing change in land use practices. •Provide additional sand traps where appropriate. The full report of the proposed project is available for inspection during working hours at: (a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi, (b)Principal Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30126-00100, Nairobi. (c)County Director of Environment, Tharaka Nithi County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the •irector-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, MR/9383023 Director-General, National Environment Management Authority.

Dated the 30th May, 2016.

GEORGE O. ONDITI,

Ag. County Director of Physical Planning, Homa Bay County.

Extracted Entities (1)

previous_gazette_ref

4077

Details

Act / Legislation
THE COMPANIES ACT
Reference
Cap. 486
Section
section 339 (5)
Signed By
GEORGE O. ONDITI
Title
Ag. County Director of Physical Planning, Homa Bay County
Date Signed
30th May 2016
Page
49
Extraction Method
regex