Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 2589

GAZETTE NOTICE NO. 2589

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent Greenfield Developers Limited, is proposing to construct a thirty five storey mixed use development on plot L.R. No. 209/8760 located in Upper Hill, off .Haile Selassie Road. The proposed development will mainly comprise of office space, retail space, apartments, serviced apartments, a hotel, retail parking and associated ancillary facilities within the proposed plot. The following are the anticipated impacts and proposed mitigation measures: Positive impacts Impact Description Employment The construction and operation of the opportunities proposed Project are expected to offer employment opportunities; these range from unskilled, casual workers, semi- skilled and formal employees. Impacts on local and • Gains in the local economy will result national economy from the utilization of locally available - materials including: building stones, iron sheets, timber, bricks, paint, electrical cables, water storage equipments, water pipes, steel, glasses, fencing posts, sand, cement, fuels, etc. and paying of taxes to the government. Optimal land use Change in land use from underutilized land to land on which a modem high-rise development stands - - will optimize land use in the area. Improved infrastructure • The operation of the proposed Project may induce improvements in • infrastructure around the facility e.g. improved roads, electricity connection, regular maintenance of roads, storm - water drainages and power lines around the building and environs. Noise and vibrations Comply with maximum permissible generation noise levels for constructions sites as per Second Schedule of the Environmental Management and Co- ordination (Noise and Excessive Vibration Pollution ,, Control) Regulations, 2009; apply for a license from NEMA whereby maximum permissible noise levels are to be exceeded; Prescribe noise reduction measures e.g. restricted working hours, transportation hours and noise buffering; Install portable barriers to shield compressors and stationary equipment where necessary and locate stationary noise sources as far from existing sensitive receptors as possible; Use quiet equipment (i.e. equipment designed with noise control elements such as mufflers). Air pollution (dust and • Provide 2.4 meter high hoarding along exhaust emissions) site boundary; Provide effective dust screen, sheeting or netting where a scaffolding is erected around the perimeter of a building under construction, from the ground floor level of the building, or if a canopy is provided at the first floor level, from the first floor level, up to the highest level of the scaffolding; Any skip hoist for material transport shall be totally enclosed by impervious sheeting; Water all active construction areas when necessary; Cover all trucks hauling soil, sand and other loose materials or require all trucks to maintain at least two feet of freeboard; Pave, apply water when necessary, or apply (non- toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction site; Down wash of trucks (especially tyres) prior to departure from site; Use of electrically operated construction machinery to avoid externalities produced by diesel engines. Health and safety risks • Security shall be enhanced by ensuring security guards Are always posted within and around the project site and strategic placement of security lights around the site; a roster of all construction workers shall be kept while measures shall be put in place to ensure that loitering by itinerant workers is discouraged; unattended public access to the construction site shall be restricted and only one entry/exit point shall be used; Appropriate health and safety measures shall be implemented as per the OSHA Act 2007; warning signs should be placed in appropriate places; Safety education and training of the construction workers should be undertaken; appropriate personal Protective Gear shall be worn at all times by all within the construction site including visitors; Install appropriate fire management equipment Deep trenching/ A barricade at least 3 feet high must be excavation risks erected around a trench that is I meter or more deep excavated material should not be placed less than 4 feet from the edge of a trench to minimize risk of collapse due to the weight of the spoil; where a possibility of collapse or cave of an excavation exists, it should be shored, shielded, benched or battered to prevent the collapse or cave-in; ladders must be provided no more than 20 meters apart in the area where excavation works are being carried Out. Soil erosion and water • Terrace, level and rip off compacted logging areas of the project site to reduce run-off velocity and increase infiltration of storm water into the soil; dig trenches and cut off drains to channel- runoff into existing peripheral storm water drains; Surface runoff should be harvested where applicable for reuse during construction works. Waste generation • Use durable, long-lasting materials that will not need to be replaced often, thereby reducing the amount of construction waste generated over time; Provide facilities for proper handling and storage of construction materials to reduce the amount of waste caused by damage or exposure to the elements; Use building materials that have minimal packaging to avoid the generation of excessive packaging waste; use construction materials containing recycled content when • possible and in accordance with accepted standards; Ensure adequate collection and storage of waste on site - and safe transportation to licensed disposal sites by licensed waste handlers. Increased traffic Any work that disturbs normal traffic signal operations shall be coordinated with the relevant authorities; Ensure that the Entry/Exit to the project site is located where it will cause minimal traffic along Haile Selassie and Lower Hill Roads; Ensure all construction vehicles to and from the construction site use the designated Entry/Exit to the project site. • All transportation of construction raw materials and excavated materials are to be conducted at traffic off peak hours only; Cover all trucks hauling soil, sand and other loose -materials to avoid spillage and dust emissions that may interfere with smooth motoring; "NO PARKING" signs will be posted around the building where Parking is prohibited and likely to cause obstruction as well as other necessary traffic signs; Traffic management/parking personnel shall be provided to monitor parking and ensure smooth motoring along the buildings adjacent roads. - Increased water demand • Promote -awareness on water conservation and reducing water wastage. • Reduce water delivery in taps, through the installation of low flow devices or aerators on taps; Press action taps, flush valves and urinal sensors shall be used to minimize water wastage in public washrooms; Install water efficient plumbing. Increased energy demand • Improve lighting efficiency by efficient window placement during project design (day-lighting); Identify and use equipment/systems having minimum energy consumption; Audit energy use occasionally; Use alternative energy sources such as solar power; Other - mitigation measures are outlined within the report. The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombsa Road, P.O. Box 67839-00200, Nairobi. - Principal Secretary, Ministry of .Envtronmeiit and Natural Resources and Regional Development Authorities, - N.H.I.F. Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126-00100, Nairobi. 1- County Director of Environment, Nairobi County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, - Director-General, MR/885 8264 National Environment Management Authority. GAZErIE NOTICE NO. 2590 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT - (No.8of1999) - THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED OFFICE BLOCK ON L.R. NO 1870/1/153, WESTLANDS AREA OF NAIROBI COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Alexander Forbes Retirement Fund - (Provident Section and Pension Section) is proposing to construct an office block to meet the current demand for office space in Nairobi. The proposed project is split into two phases. Phase 1 includes construction of a 13 storey tower consisting of retail; lobby space on ground floor; retail and commercial lettable spaces on 1St to 3rd floor; office suites on the 4th to 13th floor; a 4 storey commercial podium with retail and reception lobby on the ground floor; large atrium; retail and commercial lettable spaces on the 1st to the 3rd floor and a roof garden and terrace on the 4th floor. Phase 2 includes construction of a 20 storey office tower with retail and reception lobby on the ground floor; 1st to 3rd floor comprising of a large atrium; retail and commercial lettable spaces; office suites only from 4th to 20th floor and 200 parking spaces provision (3 basements). - The following are the anticipated impacts and proposed mitigation measures: Potential Negative Recommended Mitigation Measures - Impacts Noise and excessive Machinery, vehicles and equipment to vibration be maintained regularly. • Comply with provisions of the noise and excessive vibrations pollution control regulations for noise levels for permissible noise and vibration levels. • Provision of adequate and appropriate Personal Protective Equipment to the workers. 15th April, 2016 THE KENYA GAZETTE 1357 Sensitize construction truck drivers to switch off vehicle engines when not in use. Avoid hooting especially when passing through silent zones areas such as schools, churches, residential areas, offices, and hospitals. • Enclose noisy machines or processes with acoustic screens: Soil and water pollution • All heavy trucks and any other motorized machinery must be maintained well to avoid oil spills. • Equipment and washing activities during construction to be done in designated areas with impervious surface with interceptors for oily waste. Air pollution (dust, . Wetting exposed soil and site areas with gases) water. • Use tarpaulins to cover truck beds hauling soil and debris to and from the site. • Use dust screens to cover the buildings under construction to trap dust. • Provide appropriate personal protective equipment for employees exposed to 'dusts and gaseous emissions. • Stock piles , of earth should be enclosed/watered during windy conditions to reduce dust emission to neighbouring areas. • Strict enforcement of onsite speed controls. Increased Solid waste Appropriate budgets for purchase of raw generation materials to reduce wastage through exposure to weather elements. •' Solid wastes to be put in a designated area for appropriate disposal. • Segregation of waste at source so as to determine the recyclables. • Contract a licensed handler to collect waste at regular intervals. • Provide skips for wet and dry waste to hold before it is collected. • All wastes to be transported by licensed waste handlers by NEMA and to be disposed in licensed disposal sites. Increased traffic volumes • Construction vehicles will enter and leave the site at controlled points only. • Signage will be put in place to give warning and direct the traffic• appropriately. • Pedestrian walkways to be designated and protected by the placement, of temporary barriers. • Adhere to onsite traffic By-laws and Kenya Traffic laws. • Vehicle checkpoint to be designated inside the property to prevent snarl-up along the general Mathenge drive. Occupational safety and• Compliance with all international, health hazards national or local health and safety standards that may exist. • Issuance of Personal Protective Equipment (PPE) enforcing their use. • Clear marking of work site hazards and training in recognition of hazard symbols. • Regular - inspection, testing and maintenance of equipment and machinery. - • Development and implementation of site • emergency response plans. Training workers on health and safety precautions. - • • Provide fully stocked first aid kits. - •. Use of water sprays to arrest dust. • Containment of hazardous materials. • Fencing of the construction site to restrict entry and curb accidents. • Installation of firefighting appliances. • Provision of proper solid waste collection and disposal amenities. • Provision of proper sewerage - connections to prevent disease outbreaks. - - Increased energy demand • The building design to take advantage of natural light during the day. • Service and maintenance of powered machinery regularly - to ensure efficiency. • Use energy saving bulbs and appliances where possible. Increased effluent waste • Ensure that sewage pipes are not and surface/storm blocked or damaged so ,that the effluent runoff generation can be delivered to the sewer system to avoid land and water contamination. • Install adequate effluent and surface runoff management system. • Ensure that no surface runoff is directed to the sewer system to avoid sewer treatment plant overload. • The contractor's work camp must have sanitation facilities installed to jpclude a minimum of one latrine and washing area. Increased water • Use of water saving devices (e.g. low demand volume high pressure cisterns, time delay taps, automatic shut-off taps. • Rain water harvesting to be considered. • Rain water harvesting will be used to supply waiter for non-portable use. • Put in place measures for quick detection and repair of pipes and tanks leaks: - • Borehole water will be used to - supplement the piped water supply. Influx of people Provide adequate social and other infrastructure to meet needs of the tenants, visitors and Customers. The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Natural Resources and Regional Development Authorities, N.H.I.F. Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126-00100, Nairobi. County Director of Environment, Nairobi County. The National Environment Management Authority invites members of the public to submit oral or writtencomments within thirty (30) days from the date of publication of this 'notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. - GEOFFREY WAHUNGU, - Director-General, MR/885 8350 National Environment Management Authority.

Dated the 15th April, 2016.

GEOFFREY WAHUNGU,

- Director-General, 8350 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

2589

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
- Director-General, 8350 National Environment Management Authority
Date Signed
15th April 2016
Page
63
Extraction Method
regex