Back
INQUIRY ORDER 100% confidence via regex

GAZETTE NOTICE NO. 1575

GAZETTE NOTICE NO. 1575

THE CO-OPERATIVE SOCIETIES ACT

(Cap. 490)

INQUIRY ORDER


WHEREAS I have on my own accord, decided that an Inquiry be held into the- (a)by-laws: (b)working and financial conditions; and, (c)the conduct of the management committee, and past or present members or officers of Magombe Multipurpose Co-operative Society Limited CS/2368 and in accordance with section 58 as read together with section 73 of the Co-operative Societies Act. Now therefore, I authorize (1) Mr. Peter Wanjohi Kiama, Chief Co-operative Officer, Headquarters, (2) Kenedy Bosire Otachi, Chief Co-operative Officer, Headquarters, to hold an Inquiry within twenty (20) days at such place and time as may be expedient and duly notified by them. The attention of all officers and members of the Society is directed to the following Sections of the Co-operative Societies Act. Section 60(l) —Cost of Inquiry Section 60(2) —Recovery of Costs of Expenses Section 94 —Offences Section 73 —Surcharges Dated the 10th February, 2016. P. N. GICHUKI, MR/ 88081623 Ag. Commissionerfor Co-operative Development. 1 1th March, 2016 THE KENYA GAZETTE GAzET,rE NOTICE No. 1576 THE COMPANIES ACT (Cap. 486) IN THE HIGH COURT OF KENYA AT NAIROBI COMMERCIAL AND ADMIRALTY DIVISION IN THE MATTER OF BLUE BIRD AVIATION LIMITED WINDING UP CAUSE No. 7 OF 2016 NOTIC is given that a petition for the winding up of the above named company, Blue Bird Aviation Limited, by the High Court of Kenya, was on the 9th of March, 2016, presented to the said court by Yusuf Abdi, of P.O. Box 68772, Nairobi. And that the said Petition is directed to be heard before the said court sitting at the Milimani High Court Commercial and Admiralty Division, Nairobi, on the 22nd of March, 2016, and any creditor or contributory of the said company desirous to support or oppose the making of an order on the said Petition, may appear at the time of the hearing in person or by his advocate for that purpose and a copy of the Petition will be furnished by the undersigned to any credito^ or contributory of the said Company requiring such copy on payment of the regulated charge for the same. AHMEDNASIR, ABDIKADIR & COMPANY, Advocatesfor the Petitioner, C.B.A. Building, 2nd Floor, Standard Street, MW8808166 P.O. Box 57731-00200, Nairobi. NOTE Any person, who intends to appear on the hearing of the said petition, must serve on or send by post to the above named, notice in writing of his intention so to do. The notice must state the name and address of the person, or if a firm, the name and address of the firm, and must be signed by the person or firm or his or their advocate, if any, and must be served, or if posted must be sent by post in sufficient time to reach the above named not later than Monday, 21 st March, 2016 at 4.00 p.m. GAz= NOTICE No. 1577 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF LOCAL DEVELOPMENT PLAN (PDP No. CKRI353116101 for Existing Commercial Plot, Kagio Town) NOTICE is given that the above-mentioned development plan was on 26th February, 2016, completed. The development plan relates to land situated within Kirinyaga West Sub-County, Kirinyaga County. Copies of the part development plan have been deposited for public inspection at the County Physical Planning Officer, Kirinyaga; County Commissioner's office, Kirinyaga Central and Deputy County Commissioner's office, Kirinyaga West. The copies so deposited are available for inspection free of charge by all persons interested at the County Physical Planning Officer, Kirinyaga; County Commissioner's office, Kirinyaga Central and Deputy County Commissioner's office, Kirinyaga West, between the hours of 8.00 a.m. to 5.00 p.m. Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 483, Kerugoya, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 7th March, 2016. W. L. LOKA, MR/88081 11 for Director ofPhysical Planning. GAzEm NOTICE No. 1578 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED EXPANSION OF MOMBASA CEMENT VIPING0 CLINKER AND CEMENT PRODUCTION PLANT, KILIFI COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 6f the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Mombasa Cement Limited (Vipingo Unit) proposed an expansion that will involve construction of two new cement factories for the manufacture of clinker and cement. The components of the expansion will include construction of a boundary wall to enclose each new cement factory, limestone crusher, limestone pre-blending stockpile, additive storages, raw material hoppers, raw mill building and bag house, blending silo, kiln feed, preheater tower, rotary kiln, clinker cooler building, clinker transport conveyer, clinker storage, gypsum storage, pozzolanastorage, coal stockpile, coal mill building, cement mill hoppers, cement mill building, cement silos, cement packing plant, cement loading for dispatch, clinker dispatch station, main sC6-station, central control room, laboratories, engineering offices, stores, weighbridges, dispatch offices, water reservoirs and water treatment plant. Mombasa Cement Limited Vipingo factory is located in Kilifi County, Kikambala Division, Takaungu iMavueni Location at Vipingo off Mombasa—Kilifi Road on two parcels of land namely MN/111/291/2 and MN/111/4391. The following are the anticipated impacts and proposed mitigation measures: Activity Potential Environmental and Health Impacts Release of sulphur gases- Pollution of upper atmosphere that result in the so formation of smog. x . Acid rain effect on plant, wildlife and property. . Precursor of fine particulate soot, which poses a significant health threat. Respiratory illness, alterations in the lungs' defences and aggravation of existing, cardiovascular disease. Proposed Mitigation measures Inherent scrubbing, oxygen control (increase), fuel substitution (lower total sulfur), raw material substitution (lower sulfide sulfur), raw material alkali/sunr balance, in-line raw mill, peheater upper stage hydrated lime injection, calcined feed recirculation, cement kiln dust internal scrubber, preheater upper stage trona injection and calcium-based internal scrubber. Activity Potential Environmental and Health Impacts NO x Emissions 0 Formation acid rain which may negatively plant and animal life, Visibility impairment through formation of brown cities". a Eutrophication that is, explosive algae growth which can deplete oxygen lit water bodies. It contributes to global warming. a Respiratory illness in young children and harin lung function in people with existing respiratory illnesses. 6 Increased susceptibility to respiratory infection and alterations in the lung, nattseaj irritated eyes and/or nose, fluid forming in lungs and shortness ofbreath. CO emission and CO, a CO contributes to the fortnation of smog, ground- P-inission level ozone, which can trigger serious respiratory problems. 6 Greenhouse gas hence tontribution to global Warming. 6 Formation of acid rain potentially damaging to plants, animals and property. 6 Harmful health effects by reducing oxygen delivery to the body's organs (like the heart and brain) and tissues. 4 Central Nervous System Effects. Clinker and cement dusto Occupational illness (lung infection, itching skin, Pollution eye irritation, coughing, to workers and other people exposed to the cement dust; Reduced visibility. Chocking of plant. High noise level ai thei Noise induced hearing loss. workplace Poor concentration at the workplace. Reduced productivity. Process solid waste- Air pollution especially from kiln dust. management and disposal * Skin irritation when in contact. and Office waste management and disposal * Water pollution. . Production loss. . Irritation of eyes. . Chocking of plants. . Some electronic office waste such as used tormer cartridges and absolute office electronic equipment container hazardous substances. Utilities operations- Water shortage due to high use wastewater Water contamination due to high dissolved solids and other contaminants. Proposed Mitigation measures Oxygen control (decrease), indirect firing, low-NOX burner, mid-kiln firing, process improvements, process control improvements, low-NOX calciner, staged combustion, semi-direct firing, mixing air fan and cement kiln dust insufflation, 11 Good combustion practice, excess air (increase), raw material substitution, preprocessing system design and mixing air fan. 4- improved thermal efficiency, Clinker substitution, improved electrical efficiency, raw material substitution and mineralizers. Ensure de-dusting system is always efficient. workers to use appropriate PPE. Strict enforcement on PPE use. Ventilation at workplace to be sufficient. Developing and implementing an effective noise control and hearing consefvation programme. Carrying out periodic noise measurements. Fitting noise machines with noise reduction devices. Providing suitable hearing protection to all workers exposed to noise levels above 85dB(A). Posting notices and signs in noisy areas. • Carrying out audiometric test by a designated medical practitioner to all workers exposed to noise levels above 85dB(A). • Educating all workers on importance of marking correct use of PPE provided to protect them against high noise levels. • Recycle and reuse where applicable. • Segregate for appropriate disposal. • Process improvement to minimize waste generations. • Material substitution to minimize waste generation. • Technological improvement to minimize waste generation. • Absolute electronic equipment and other electronic waste to be returned to manufacturers for safe disposal. • Adaption of water conservation opportunities. • Minimizing use of antifouling and corrosion inhibiting chemicals. • Testing for residual biocides and other pollutants of concern. • pH adjustment. • Sedimentation for suspended solids reduction using settling basins or clarifiers. • Multimedia filtration for reduction in non settleable suspended solids. I I I th March, 2016 Dust 6 Lung infection. 6 Itching skin. . Eye irritation. . Coughing, to workers and other people exposed to the cement dust. Heat . Physical burns of workers exposed to heat. 6 Burning and damage to process equipment. Parking of lorries outside- Inconvenience to other motorists and other road MCL premises users. Proposed Mitigation measures * Segregation of wastewater streams. 0 Treatment to meet national standards for sanitary wastewater discharge. 6 Storm water should be separated from process and sanitary wastewater streams in order to reduce the volume of wastewater to be treated prior to discharge. # Runoff from areas without potential sources of contamination should be minimized (e.g. by minimizing the area of impermeable surfaces) and the peak discharge rate should be reduced (e.g. by using vegetated swales and retention ponds). 6 Oil water separators and grease traps should be installed and maintained as appropriate tit refueling facilities, workshops, parking areas, fuel storage and containment areas. -1 Good housekeeping and maintenance. 6 Use of air—conditioned, closed cabins; 6 Dust extraction and recycling systems. b Air ventilation (suction). 6 Shielding surfaces. 4- Using personal protective equipment. a Minimizirig the work time required in high temperature environments by implementing shorter shifts. 6 Use of air- or oxygen supplied respirators. & Use of silencers for fans. Room enclosures for mill operators. Noise barriers. Personal hearing protection. Implementation of ionizing radiation protection measures. PPE use. Appropriate handling as per material safety data sheets; Training and sensitizations. Medical examination of exposed workers. Provide sufficient space for internal parking of lorries awaiting to deliver material or to collect material. Activity Potential Environmental and Health Impacts Sanitary Wastewater 6 Contamination of ground water. . Odor. Storm water Degradation of the quality of water of the receiving water body. 6 Contamination of soils. . Erosion. Noise and vibrations . Noise induced hearing loss. b Poor concentration at workplace. . Reduced productivity. Radiation - i Exposure to radiafions. Chemical hazards and other, Physical bums. industrial hygiene issues . Sickness/disease/ill health. The full report of the proposed project is available for inspection during working hours at: (a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b)Principal Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30126-00100, Nairobi. (c)County Director of Environment, Mombasa County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/8808079 National Environment Management Authority. GAzErTE NOTICE No. 1579 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED CERAMIC FACTORY ON PLOT L.R. NO. KJD/DALALEKUTUK/1320 IN INKWANCHANI VILLAGE, KAJIADO COUNTY. INVITATION OF PUBLIC COMMENTS PURSUANT to Regulation 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The Proponent, Twyford Ceramics Company Limited, is proposing a ceramic factory on Plot L.R. No. Kjd/Dalalekutuk/1320 in Inkwanchani Village, Kajiado County. The project shall entail development of the factory's facilities such as the warehouse, dormitories, waste management plant, water resources, establishment of energy sources including KPLC power, constructing a concrete perimeter fence, crushing fields, among other amenities. Once operational, the factory shall process ceramics and floor/wall tiles. The project shall be done in two phases. Phase I shall comprise construction of a dormitory, a warehouse, Office block, sources of energy, perimeter wall and later on Borehole&. On the other hand, a phase 11 shall entail construction of the remaining Dormitories, two warehouses plus other facilities. The following are the anticipated impacts and proposed mitigation measures: Potential impacts Mitigation measures CONSTRUCTION PHASE Vegetation Loss . Vegetation loss is set to be confined to the project location and will mainly consist of grass and weeds as the ground is not in use. Increase in solid . The waste designated area will be well wastes protected from the elements to ensure reduced chances of them being carried away by wind or rain. . Surplus material that cannot be reused in any way will be removed from site by licensed waste handlers. . Solid wastes will be sorted for its different components. There shall be different waste bins for emptying at dry garbage and wet garbage areas. . These wastes will invariably be sent to recycling depots. . Transport of such waste to follow the laid down regulations. Dust Emissions . Water to be sprinkled on the earth surface . Control of speed and operation of construction vehicles . Prohibit prolonged engine idling . Maintenance of plant and equipment . All bare areas should be landscaped after construction to reduce dust • Provide respiratory protection devices Noise pollution • Construction work to be restricted today time only. • Constructor to be advised to use well serviced machines. Traffic congestion • Scheduling for material delivery and obstruction • Trucks to be parked at the site Occupational health , Employees to be provided with appropriate and safety risks personal protective clothing . First aid services to be readily available on site Firefighting equipment to be provided at the site Storm water Constructor to provide proper drainage trenches with barriers to prevent erosion of soil by storm water OPERATION PHASE Fire hazard . Provision of firefighting appliances • Making clearly the fire points at the site • Workers trained on how to avoid fire incidents Increase in waste Waste water will be recycled after primary water generation settling, mud pressure filtration, separation and solid waste of water and mud. Increase in traffic to - Proper signage to be put in place to notify the surrounding neighbors of the activity and presence of heavy vehicles . Strict adherence to the traffic rules Occupational health * Employees to be provided with appropriate and safety risks personal protective clothing . First aid services to be available on site. . Provision of proper sanitary facilities for employees Micro Climate . Ensure there will be an area within the site Modification planted with grass and flowers to give the plant some beauty and coolness . Ensure that areas outside the perimeter wall are planted with short indigenous trees and flowers to reduce the heat and for beauty of the surrounding. Security . Installation of an entrance and exit security check. • Well trained security officers from a reputable company to patrol the grounds. • The company should install an internal surveillance system that will monitor the plant at all times. The full report of the proposed project is available for inspection during workingbours at: (a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b)Principal Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30126- 00 100, Nairobi. (c)County Director of Environment, Kajiado County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, NIRJ8808065 National Environment Management Authority.

Dated the 10th February, 2016.

P. N. GICHUKI,

MR/ 88081623 Ag. Commissionerfor Co-operative Development.

Extracted Entities (1)

previous_gazette_ref

1575

Details

Act / Legislation
THE CO-OPERATIVE SOCIETIES ACT
Reference
Cap. 490
Section
section 58
Signed By
P. N. GICHUKI
Title
MR/ 88081623 Ag. Commissionerfor Co-operative Development
Date Signed
10th February 2016
Page
34
Extraction Method
regex