GAZETTE NOTICE NO. 8633
GAZETTE NOTICE NO. 8633
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The Proponent (Portofino Properties Limited) is proposing to construct on a three acre plot; a total of 43 high-rise residential units in six (6) blocks, parking area on the ground floor, and a sewage treatment plant on Plot L.R. No. 1870/11/251 and 1870/11/162 off
General Mathenge Road in Westlands, in Nairobi County.
The following are the anticipated impacts and proposed mitigation measures:
Environmental Impacts Mitigation Impacts
High demand for raw materials
Source building materials from local suppliers who use environmentally friendly processes in their operations.
Ensure accurate budgeting and estimation of actual construction material requirements to ensure that the least amount of material necessary is ordered.
Ensure that damage or loss of materials at the construction site is kept minimal through proper storage.
Use of some recycled/refurbished or salvaged materials to reduce the use of raw materials and divert material from landfills.
Increased storm water runoff and soil erosion
Roof water to be harvested and stored in underground reservoirs.
A storm water management plan that minimizes impervious area infiltration by use of recharge areas and use of detention and/or retention with graduated outlet control structure should be designed.
Apply soil erosion control measures such as leveling of the project site to reduce run-off velocity and increase infiltration of storm water into the soil.
Ensure that construction vehicles are restricted to existing roads to avoid soil compaction within and around the project site.
Site excavation works to be planned such that a section is completed and rehabilitated before another section begins.
Construction of soil-galleys on sloppy sections.
Increased solid waste generation
Use of an integrated solid waste management system
Estimate and procure just the required amount of materials
Ensure that construction materials left- overs are reused elsewhere.
Donate recyclable/reusable or residual materials to needy groups
Use of durable
Provide facilities for proper handling and storage of construction materials to reduce the amount of waste caused by damage or exposure.
Purchase of perishable construction materials such as paints should be done incrementally to ensure reduced spoilage of unused materials
Use building materials that have minimal or no packaging to avoid the generation of excessive packaging waste
Use construction materials containing recycled content when possible and in accordance with accepted standards.
Reuse packaging materials such as cartons, cement bags, empty metal and
THE KENYA GAZETTE 28th June, 2013
3392 3392 plastic containers to reduce waste at the site
Dispose waste more responsibly by dumping at designated dumping sites or landfills only.
Waste collection bins to be provided at designated points on site
Private waste disposal company to be contracted to transport and dispose the solid waste from site
Running educational campaigns amongst residents/workers, e.g. through use of posters, to encourage reuse or recycling of the solid waste
Dust emission Ensure strict enforcement of on-site speed limit regulations
Avoid excavation works in extremely dry weathers if/and when possible
Sprinkle water on graded access routes when necessary to reduce dust generation by construction vehicles
Personal Protective equipment to be worn
Exhaust emission Vehicle idling time shall be minimized
Alternatively fuelled construction equipment shall be used where feasible
Sensitize truck drivers to avoid unnecessary racing of vehicle engines
Noise and vibration Sensitize construction vehicle drivers and machinery operators to switch off engines of vehicles or machinery not being used.
Sensitize construction drivers to avoid gunning of vehicle engines or hooting especially when passing through sensitive areas such as churches, residential areas and hospitals
Ensure that construction machinery are kept in good condition to reduce noise generation
Ensure that all generators and heavy duty equipment are insulated or placed in enclosures to minimize ambient noise levels.
Trees around the site will provide some buffer against noise propagation
The noisy construction works will entirely be planned to be during day time when most of the neighbors will be at work.
Increased energy consumption
Ensure electrical installations are turned off when not being used
Install energy saving fluorescent tubes at all lighting points instead of bulbs which consume higher electric energy
Ensure planning of transportation of materials to ensure that fossil fuels
(diesel, petrol) are not consumed in excessive amounts
High water demand Harness rainwater for some domestic and other uses
Install water conserving taps that turn- off automatically when not in use
Promote recycling and reuse of water as much as possible
Install a discharge meters to monitor water use
Promptly detect and repair water pipe and tank leaks
Sensitize tenants to conserve water by avoiding unnecessary toilet flushing etc.
Ensuring taps are not running when not in use
Generation of wastewater Provision of means for handling sewage generated by construction workers such as mobile toilets
Conduct regular checks for sewage pipe blockages or damages
Monitor effluent quality regularly to ensure compliance with set standards
Incidents, accidents and dangerous occurrences.
Ensure that provisions for reporting incidents, accidents and dangerous occurrences are in place and the same are enforced.
Ensure that the premises are insured as per statutory requirements
Provisions must be put in place for the formation of a Health and Safety
Committee, in which the employer and the workers are represented
Provide suitable, clean, and adequate sanitary conveniences for workers
Ensure that materials are stored or stacked in such manner as to ensure their stability and prevent any fall or collapse
Securely fence or cover all openings in floors
Ensure that construction workers are not locked up such that they would not escape in case of an emergency
All ladders used in construction works must be of good construction and sound material of adequate strength and be properly maintained
Machinery/equipment safety
Arrangements must be in place for the medical examination of all construction employees before, during and after termination of employment
Ensure that machinery, equipment, appliances and hand tools used in construction do comply with the prescribed safety and health standards and be appropriately installed maintained and safeguarded
Ensure that equipment and work tasks are adapted to fit workers and their ability including protection against mental strain
All machines and other moving parts of equipment must be enclosed or guarded to protect all workers from injury
Arrangements must be in place to train and supervise inexperienced workers regarding construction machinery use and other procedures/operations
Firefighting equipment must be examined by licensed inspectors
Occupational health and safety risks
Provide well stocked first aid box which is easily available and accessible
Provision must be made for persons to be trained in first aid.
Provide firefighting equipment such as fire extinguishers and hydrant systems
Regular inspection and servicing of the equipment must be undertaken
Signs such as “NO SMOKING” must be prominently displayed within the flat
Space must be provided within the premises for adequate natural ventilation
Adequate provision for artificial or natural lighting in all parts the premises
Circuits must not be overloaded an all electrical equipment must be earthed
There should be no live exposed
28th June, 2013 THE KENYA GAZETTE connections
Provide workers in areas with elevated noise and vibration levels, with suitable ear protection equipment such as ear muffs
Ensure that conveniently accessible, clean, orderly, adequate and suitable washing facilities are provided and maintained in within the site
Hand tools must be of appropriate size and shape for easy and safe use
Height of equipment, controls or work surfaces should be positioned to reduce bending posture for standing workers
Hydrology and water quality degradation
Hazardous substance control and emergency response plan that will include preparations for quick and safe clean up of accidental spills.
Hazardous-materials handling procedures to reduce the potential for a spill during construction
Identify areas where refueling and vehicle maintenance activities and storage of hazardous materials, if any, will be permitted
Insecurity Appoint security personnel operating 24 hours
Body-search the workers on entry, to avoid getting weapons on site, and leaving site to ensure nothing is stolen.
Ensure only authorized personnel get to the site
Air pollution Suitable wet suppression techniques need to be utilized in all exposed areas
All unnecessary traffic must be strictly limited on site; speed controls are to be enforced
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi.
(c) County Director of Environment, Nairob County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
ROBERT ORINA, for Director-General, MR/2727321 National Environment Management Authority.
Dated the 28th June, 2013.
ROBERT ORINA,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
8633
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- ROBERT ORINA
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 28th June 2013
- Page
- 69
- Extraction Method
- regex
Source Gazette
Vol. CXV No. 96
Published 28th June 2013